AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - TYLER DISTRICT

Last Update: Monday, March 31, 2014
ITEMS 247 2042 TO 275 2019
Items Items Bid Code Range
0100 - 0193
0247 - 0275
0305 - 0361
0400 - 0497
0500 - 0560
0610 - 0690
0740 - 0740
1122 - 1122
2110 - 2110
3127 - 3272
4116 - 4652
5165 - 5926
6005 - 6834
8020 - 8995
247 2042 - 275 2019
Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
247 2042 FL BS (CMP IN PLC) (TY A GR 2) (FNAL POS CY     123.000 140.00000 1
247 2388 FL BS (CMP IN PLC) (TY A GR 5) (6") SY     117,014.000 10.50000 1
247 2394 FL BS (CMP IN PLC) (TY D GR 2) (12") SY     7,702.000 22.00000 1
260 2001 LIME (HYDRATED LIME (DRY) ) TON     484.000 166.47736 2
260 2073 LIME TRT (SUBGRADE) (8") SY     33,401.000 2.12429 2
275 2001 CEMENT TON 9.850 215.00000 2,080.870 133.18391 10
275 2002 CEMENT TREAT (EXIST MATL) (6") SY     17,416.000 2.87842 2
275 2010 CEMENT TREAT (SUBGRADE) (8") SY 684.000 3.50000 104,456.000 1.62966 4
275 2019 CEMENT TREAT (SUBGRADE) (6") SY     37,546.000 2.74081 5