AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - TYLER DISTRICT

Last Update: Wednesday, February 25, 2015
ITEMS 500 2001 TO 560 2034
Items Items Bid Code Range
0100 - 0193
0247 - 0275
0310 - 0354
0400 - 0496
0500 - 0560
0618 - 0690
0712 - 0740
1014 - 1122
3127 - 3272
5369 - 5369
6005 - 6834
8020 - 8020
9033 - 9033
500 2001 - 560 2034
Item No Description Units January 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 3.000 240,609.18333 25.000 356,645.17400 25
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 16.000 1,868.75000 247.000 4,132.92713 25
508 2002 CONSTRUCTING DETOURS SY     27,210.000 78.00000 1
512 2011 PORT CTB (DES SOURCE) (SAFETY SH) (TY 2) LF     300.000 24.00000 1
512 2020 PORT CTB (MOVE) (SAFETY SH) (TY 2) LF     3,900.000 20.00000 1
512 2029 PORT CTB (STKPL) (SAFETY SH) (TY 2) LF     300.000 24.00000 1
528 2006 COLORED TEXTURED CONC (5") SY     892.000 93.44731 2
529 2004 CONC CURB & GUTTER (TY II) LF     977.000 29.20445 2
529 2006 CONC CURB (MONO) (TY II) LF     44.000 34.00000 1
530 2010 DRIVEWAYS (CONC) SY     1,906.600 71.10569 6
530 2011 DRIVEWAYS (ACP) SY     12,685.000 25.28782 3
530 2015 TURNOUTS (SURF TREAT) EA     187.000 35.00000 1
530 2038 DRIVEWAYS (CONC) (HES) SY 455.000 90.00000 526.000 92.12928 3
531 2005 CURB RAMPS (TY 1) EA     8.000 2,000.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     406,255.840 .14544 4
540 2001 MTL W - BEAM GD FEN (TIM POST) LF 500.000 19.00000 12,763.100 17.08395 6
540 2005 TERMINAL ANCHOR SECTION EA     1.000 1,100.00000 1
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 4.000 1,525.00000 26.000 1,365.38462 4
540 2012 MTL BEAM GD FEN TRANS (TL2) EA 4.000 665.00000 40.000 798.50000 5
540 2015 MTL W - BEAM GD FEN (TIM POST) RADIUS RAIL LF 32.000 40.70000 32.000 40.70000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     6.000 975.00000 2
540 2046 MTL BM GD FEN TRANS (NON - SYM) EA     2.000 800.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF 500.000 3.00000 15,054.500 1.67739 6
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     8.000 137.50000 2
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 3.000 2,170.00000 62.000 2,058.54839 8
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 220.00000 27.000 141.11111 3
544 2004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA 4.000 2,225.00000 29.000 2,003.44828 3
545 2095 CRASH CUSH ATTEN (INSTL) (S) (N) (TL3) EA     4.000 9,000.00000 1
545 2100 CRASH CUSHION ATTENUATOR (MOVE & RESET EA     52.000 2,200.00000 1
545 2101 CRASH CUSHION ATTENUATOR (REMOVE) EA     4.000 250.00000 1
552 2001 WIRE FENCE (TY A) LF     1,103.000 9.23731 2
552 2003 WIRE FENCE (TY C) LF 422.000 10.00000 1,391.000 12.09058 5
552 2005 GATE (TY 1) EA 1.000 300.00000 2.000 400.00000 2
552 2008 WIRE FENCE (WATER GAP) LF     37.000 65.00000 1
556 2008 PIPE UNDERDRAINS (TY 8) (6") LF     1,000.000 22.00000 1
560 2011 MAILBOX INSTALL - S (TWG - POST) TY 2 FND EA     33.000 176.00000 1
560 2013 MAILBOX INSTALL - D (TWG - POST) TY 2 FND EA     1.000 215.00000 1
560 2021 MAILBOX INSTALL - S (TWG - POST) TY 2 FND - TB EA     180.000 164.50000 4
560 2022 MAILBOX INSTALL - D (TWG - POST) TY 2 FND - TB EA     14.000 191.78571 3
560 2023 MAILBOX INSTALL - M (TWG - POST) TY 2 FND - TB EA     9.000 329.44444 3
560 2032 MAILBOX INSTALLTION (SINGLE) INSTALL ONL EA     117.000 149.74359 2
560 2033 MAILBOX INSTALLTION (DOUBLE) INSTALL ONL EA     22.000 177.27273 2
560 2034 MAILBOX INSTLTION (MULTIPLE) INSTALL ONL EA     11.000 215.00000 1