| 5049 2001 | BIODGRD EROSION CONTROL LOGS (8" DIA) | LF | 14,405.000 | 2.87404 | 4 | ||
| 5049 2002 | BIODGRD EROSION CONTROL LOGS (18" DIA) | LF | 3,767.000 | 4.95175 | 2 | ||
| 5049 2003 | BIODGRD EROSION CONTROL LOGS (12" DIA) | LF | 7,020.000 | 3.26432 | 5 | ||
| 5367 2001 | CABLE BARRIER SYSTEM (TL - 3) | LF | 74,293.000 | 5.25000 | 1 | ||
| 5367 2007 | CABLE BARRIER TERMINAL SECTION (TL - 3) | EA | 66.000 | 2,300.00000 | 1 | ||
| 5631 2001 | REMOVING SHOULDER TEXTURING | LF | 193,411.000 | 1.70000 | 1 | ||
| 5729 2001 | TEMP PORTABLE TRAFFIC SIGNAL | DAY | 120.000 | 250.00000 | 1 | ||
| 5730 2001 | REMOVING SHOULDER TEXTURING | LF | 147,596.000 | 1.70000 | 1 | ||
| 5748 2001 | STACKED STONE - BLOCK RETAINING WALL | SF | 2,595.000 | 15.50000 | 1 | ||
| | ||||
|