Item No Description Units July 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 6001 MOBILIZATION LS 3.000 264,916.66667 31.000 515,474.26806 31
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 31.000 2,608.62903 378.000 6,259.13913 31
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     2,086.000 21.79875 4
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     5,192.000 22.04777 9
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF     3,852.000 38.08307 2
506 6004 ROCK FILTER DAMS (INSTALL) (TY 4) LF     49.000 52.95918 2
506 6005 ROCK FILTER DAMS (INSTALL) (TY 5) LF 662.000 24.40000 2,865.000 21.04744 2
506 6011 ROCK FILTER DAMS (REMOVE) LF 662.000 6.20000 14,044.000 7.67063 14
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 156.000 29.80000 28,664.000 11.56091 16
506 6021 CONSTRUCTION EXITS (INSTALL) (TY 2) SY     100.000 12.00000 1
506 6024 CONSTRUCTION EXITS (REMOVE) SY 156.000 5.65000 28,764.000 5.52944 17
506 6031 FRNT END LOADER WORK (ERSN & SEDM CONT HR     203.000 93.07537 7
506 6032 BLADING WORK (EROSION & SEDMT CONT) HR     8.000 175.00000 1
506 6034 CONSTRUCTION PERIMETER FENCE LF     1,414.000 3.93844 3
506 6036 SANDBAGS FOR EROSION CONTROL (6") LF     780.000 3.70000 1
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,390.000 1.95000 184,745.000 2.05654 18
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,390.000 .75000 184,745.000 .51256 18
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 1,655.000 5.00000 5,607.000 4.51983 3
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 150.000 5.00000 25,639.000 2.91942 6
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF     270.000 5.00000 1
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 150.000 1.50000 26,296.000 .43589 6
508 6001 CONSTRUCTING DETOURS SY     57,744.000 50.31425 6
508 6004 CONSTRUCTING DETOURS (TY 2) SY 3,216.000 5.25000 20,042.000 2.68102 2
510 6002 ONE - WAY TRAF CONT (PILOT CAR) HR 40.000 107.25000 2,504.000 118.16062 7
510 6003 ONE - WAY TRAF CONT (PORT TRAF SIG) MO     46.000 10,753.72913 3
512 6001 PORT CTB (FUR & INST) (SGL SLOPE) (TY 1) LF     46,600.000 18.66897 7
512 6002 PORT CTB (FUR & INST) (SGL SLOPE) (TY 2) LF     17,490.000 40.00000 1
512 6005 PORT CTB (FUR & INST) (F - SHAPE) (TY 1) LF 1,800.000 24.20000 10,110.000 23.65875 5
512 6009 PORT CTB (FUR & INST) (LOW PROF) (TY 1) LF     31,300.000 21.96544 8
512 6010 PORT CTB (FUR & INST) (LOW PROF) (TY 2) LF     3,060.000 30.24366 8
512 6025 PORT CTB (MOVE) (SGL SLP) (TY 1) LF     113,670.000 6.95601 7
512 6026 PORT CTB (MOVE) (SGL SLP) (TY 2) LF     16,350.000 3.00000 1
512 6033 PORT CTB (MOVE) (LOW PROF) (TY 1) LF     250,640.000 4.27763 7
512 6034 PORT CTB (MOVE) (LOW PROF) (TY 2) LF     11,160.000 5.12717 7
512 6049 PORT CTB (REMOVE) (SGL SLP) (TY 1) LF     46,600.000 7.62595 7
512 6050 PORT CTB (REMOVE) (SGL SLP) (TY 2) LF     17,490.000 5.00000 1
512 6053 PORT CTB (REMOVE) (F - SHAPE) (TY 1) LF 1,800.000 7.15000 11,930.000 12.20872 5
512 6057 PORT CTB (REMOVE) (LOW PROF) (TY 1) LF     31,300.000 10.64988 8
512 6058 PORT CTB (REMOVE) (LOW PROF) (TY 2) LF     3,060.000 10.13124 8
512 6072 PTB (FRN & INSTL) (SGL SLP) (TY 1) OR (STL LF     300.000 79.82000 1
512 6074 PTB (MOVE) (SGL SLP) (TY 1) OR (STL) LF     12,000.000 .50000 1
512 6076 PTB (REMOVE) (SGL SLP) (TY 1) OR (STL) LF     300.000 20.00000 1
514 6001 PERM CTB (SGL SLOPE) (TY 1) (42 ) LF     2,894.000 10.00000 1
514 6007 PERM CTB (SGL SLOPE) (TY 3) (48 ) LF     354.000 95.00000 1
528 6001 COLORED TEXTURED CONC (4") SY     898.000 88.12817 2
529 6001 CONC CURB (TY I) LF 400.000 25.15000 59,226.000 7.31760 7
529 6002 CONC CURB (TY II) LF     300.000 14.00000 1
529 6005 CONC CURB (MONO) (TY II) LF     303.000 11.00000 1
529 6008 CONC CURB & GUTTER (TY II) LF     2,518.000 16.45552 3
529 6015 CONC CURB (TY C1) LF 624.000 65.45000 2,533.000 63.12853 3
529 6016 CONC CURB (TY F1) LF     28.000 145.00000 1
529 6017 CONC CURB (TY F2) LF     507.000 68.90000 1
529 6018 CONC CURB (TY F3) LF     127.000 87.10000 1
529 6019 CONC CURB (TY F) LF     293.000 37.73567 2
529 6020 CONC CURB & GUTTER (ARMOR CURB) LF 14.000 259.85000 56.000 177.46250 2
529 6027 CONC CURB (TY C2) LF 476.000 93.20000 2,006.000 88.86017 2
530 6002 INTERSECTIONS (ACP) SY     13,402.000 36.55930 5
530 6003 INTERSECTIONS (SURF TREAT) SY     58,829.000 3.09168 2
530 6004 DRIVEWAYS (CONC) SY 286.000 80.95000 10,783.000 63.63838 8
530 6005 DRIVEWAYS (ACP) SY 218.000 52.85000 12,188.000 39.65909 10
530 6006 DRIVEWAYS (SURF TREAT) SY     4,370.000 25.95556 3
530 6008 TURNOUTS (ACP) SY 27.000 112.00000 216.000 50.68120 4
530 6009 TURNOUTS (SURF TREAT) SY     75.000 62.04533 2
530 6016 DRIVEWAYS (BASE) SY     2,987.000 16.78987 3
531 6001 CONC SIDEWALKS (4") SY 5,650.000 49.40000 52,980.000 38.71246 9
531 6003 CONC SIDEWALKS (6") SY 602.000 86.90000 2,851.000 59.54797 3
531 6004 CURB RAMPS (TY 1) EA 8.000 1,137.80000 38.000 1,181.50342 6
531 6005 CURB RAMPS (TY 2) EA     32.000 1,413.68813 5
531 6008 CURB RAMPS (TY 5) EA     8.000 1,604.18125 5
531 6010 CURB RAMPS (TY 7) EA     14.000 1,442.70714 3
531 6013 CURB RAMPS (TY 10) EA 4.000 1,207.80000 42.000 1,682.79476 5
531 6016 CURB RAMPS (TY 21) EA     6.000 1,944.79667 4
531 6017 CURB RAMPS (TY 22) EA     18.000 2,947.20889 4
533 6001 RUMBLE STRIPS (SHOULDER) LF     331,763.000 .18520 3
533 6002 RUMBLE STRIPS (CENTERLINE) LF     101,332.000 .23476 2
536 6002 CONC MEDIAN SY     13,057.000 30.00000 1
536 6004 CONC DIRECTIONAL ISLAND SY     1,047.000 35.25310 2
540 6001 MTL W - BEAM GD FEN (TIM POST) LF 2,750.000 17.00000 53,973.500 17.31272 14
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF     285.000 56.17000 1
540 6005 TERMINAL ANCHOR SECTION EA     1.000 595.00000 1
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 2.000 1,500.00000 127.000 1,343.48118 12
540 6010 MTL W - BEAM GD FEN ADJUSTMENT LF     3,515.000 12.00000 1
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 875.00000 111.000 891.68757 8
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA 2.000 875.00000 32.000 769.12500 5
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,750.000 .85000 46,088.000 1.32065 12
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 4.000 70.00000 146.000 109.07178 11
542 6004 RM MTL BM GD FENCE TRANS (THRIE - BEAM) EA 4.000 37.00000 65.000 156.73046 6
543 6001 CABLE BARRIER SYSTEM (TL - 3) LF     19,417.000 9.72991 2
543 6019 CABLE BARRIER TERMINAL SECTION (TL - 3) EA     14.000 2,134.82143 3
543 6021 REMOVE CABLE BARRIER LF     5,047.000 8.50000 1
543 6022 REMOVE CABLE BARRIER TERMINAL SECTION EA     4.000 869.37500 2
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 1,875.00000 153.000 2,055.61157 9
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 52.00000 60.000 215.15667 9
544 6005 GDRAIL END TRT (INST) (WOOD POST) (TY II) EA     2.000 2,332.00000 1
544 6006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA     42.000 2,319.52381 3
545 6001 CRASH CUSH ATTEN (INSTL) EA     58.000 8,548.62776 8
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA     116.000 1,102.65845 8
545 6005 CRASH CUSH ATTEN (REMOVE) EA 8.000 1,433.45000 135.000 576.06889 14
545 6008 CRASH CUSH ATTEN (INSTL) (L) (N) (70) EA     1.000 15,400.00000 1
545 6012 CRASH CUSH ATTEN (INSTL) (R) (N) (TL2) EA     1.000 7,265.00000 1
545 6019 CRASH CUSH ATTEN (INSTL) (S) (N) (TL3) EA 8.000 8,630.05000 76.000 6,969.37368 6
550 6006 GATE (REMOVE) EA     7.000 1,000.00000 1
552 6003 WIRE FENCE (TY C) LF     412.000 70.00000 1
552 6009 GATE (SPECIAL) EA     10.000 3,500.00000 1
556 6006 PIPE UNDERDRAINS (TY 6) (6") LF 2,344.500 14.30000 4,256.500 25.84432 2
560 6003 MAILBOX INSTALL - M (TWG - POST) TY 1 EA     6.000 335.00000 1
560 6011 MAILBOX INSTALL - S (TWW - POST) TY 4 EA 4.000 157.80000 72.000 174.66611 6
560 6012 MAILBOX INSTALL - D (TWW - POST) TY 4 EA     5.000 250.75200 4
560 6013 MAILBOX INSTALL - M (TWW - POST) TY 4 EA     3.000 427.88667 3