AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - SAN ANTONIO DISTRICT

Last Update: Friday, August 26, 2016
ITEMS 100 6001 TO 193 6022
Items Items Bid Code Range
0100 - 0193
0216 - 0276
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0785
1002 - 1010
3002 - 3002
4028 - 4052
5001 - 5008
6001 - 6101
7023 - 7104
9033 - 9065
100 6001 - 193 6022
Item No Description Units August 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 6001 PREPARING ROW AC 5.760 25,000.00000 7.270 23,961.48556 2
100 6002 PREPARING ROW STA 1,123.690 3,463.29212 2,174.220 2,488.34714 13
100 6004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     1.000 1,000.00000 1
100 6009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     1.000 5,294.75000 1
104 6009 REMOVING CONC (RIPRAP) SY 4,326.000 15.47000 8,576.000 14.50133 9
104 6011 REMOVING CONC (MEDIANS) SY     28.000 11.35000 1
104 6015 REMOVING CONC (SIDEWALKS) SY     769.000 10.32204 4
104 6017 REMOVING CONC (DRIVEWAYS) SY     2,720.000 7.02099 3
104 6021 REMOVING CONC (CURB) LF 20.000 15.00000 6,865.000 7.20559 7
104 6022 REMOVING CONC (CURB AND GUTTER) LF     596.000 3.25000 1
104 6023 REMOVING CONC (CTB) LF     354.000 22.00000 1
104 6025 REMOVE CONC (WINGWALL) CY 28.000 300.00000 28.000 300.00000 1
104 6027 REMOVING CONC (APPR SLAB) SY 182.000 150.00000 182.000 150.00000 1
104 6032 REMOVING CONC (WHEELCHAIR RAMP) SY     6.000 59.15000 1
104 6037 REMOVE CONC (RAIL) LF 305.000 2.36000 1,513.000 44.38850 2
104 6054 REMOVING CONCRETE (MOW STRIP) LF     270.000 20.00000 1
104 6064 REMOVING CONC (MISC) CY 60.000 300.00000 60.000 300.00000 1
105 6022 REMOVING STAB BASE AND ASPH PAV (13") SY 14,113.000 5.43000 14,113.000 5.43000 1
105 6034 REMOVING STAB BASE AND ASPH PAV (1" - 9") SY     189,824.000 2.92000 1
105 6035 REMOVING STAB BASE & ASPH PAV (0 - 2") SY     336.000 38.00000 1
105 6036 REMOVING STAB BASE & ASPH PAV (15" - 20") SY 71,512.000 2.40000 71,512.000 2.40000 1
110 6001 EXCAVATION (ROADWAY) CY 595,420.000 4.23872 1,001,390.000 5.20021 14
110 6002 EXCAVATION (CHANNEL) CY 4,449.400 2.70000 13,803.400 5.61393 2
110 6003 EXCAVATION (SPECIAL) CY 5,771.000 18.00000 5,771.000 18.00000 1
112 6001 SUBGRADE WIDENING (ORD COMP) STA     19.500 1,479.10974 1
132 6001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY 17,443.000 9.99000 23,227.000 8.74739 2
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 303,830.000 1.46181 1,200,298.000 9.15192 10
132 6005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     562.000 20.00000 1
132 6006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 95,785.000 5.18790 95,785.000 5.18790 2
132 6019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     47.000 55.00000 1
134 6002 BACKFILL (TY B) STA     642.000 110.00000 1
150 6001 BLADING STA     1,421.730 18.78642 2
150 6002 BLADING HR     5.000 123.34000 1
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 60,123.000 1.89139 87,298.000 1.94338 5
161 6012 GENERAL USE COMPOST CY     3,890.500 30.06297 2
161 6017 COMPOST MANUF TOPSOIL (4") SY 1,034,834.000 1.01992 1,498,878.000 1.29522 7
162 6002 BLOCK SODDING SY 7,138.000 5.07481 19,088.000 4.26091 4
164 6007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY 2,084.000 .36000 2,084.000 .36000 1
164 6009 BROADCAST SEED (TEMP) (WARM) SY 134.000 3.00000 134.000 3.00000 1
164 6011 BROADCAST SEED (TEMP) (COOL) SY 134.000 3.00000 9,421.000 .22011 2
164 6023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     10,986.000 .38000 1
164 6029 CELL FBR MLCH SEED (TEMP) (WARM) SY     10,986.000 .34000 1
164 6031 CELL FBR MLCH SEED (TEMP) (COOL) SY     10,986.000 .34000 1
164 6033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     45,222.000 .12000 1
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 57,772.000 .13000 72,422.000 .13755 3
164 6039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY 1,027,963.000 .07000 1,427,180.000 .08535 4
164 6041 DRILL SEEDING (TEMP) (WARM) SY 28,887.000 .11000 37,663.000 .14577 3
164 6043 DRILL SEEDING (TEMP) (COOL) SY 28,887.000 .11000 48,025.000 .13158 4
164 6045 STRAW OR HAY MULCHING SY 1,027,963.000 .11000 1,027,963.000 .11000 1
164 6051 DRILL SEED (TEMP) (WARM OR COOL) SY 1,027,963.000 .05000 1,287,902.000 .06038 5
164 6066 DRILL SEEDING (PERM) (WARM OR COOL) SY     15,181.000 .12000 1
166 6001 FERTILIZER AC     2.140 750.00000 1
166 6002 FERTILIZER TON 17.000 936.23000 17.000 936.23000 1
168 6001 VEGETATIVE WATERING MG 17,882.400 20.55640 26,294.220 23.08954 15
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     56,368.000 .95752 4
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     45,222.000 1.25000 1
169 6006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY 1,515.000 1.35000 1,515.000 1.35000 1
169 6007 SOIL RETENTION BLANKETS (CL 2) (TY G) SY 33,027.000 3.58000 33,027.000 3.58000 1
169 6008 SOIL RETENTION BLANKETS (CL 2) (TY H) SY 47,054.000 3.15000 47,054.000 3.15000 1
170 6001 IRRIGATION SYSTEM LS     2.000 53,000.00000 2
192 6002 PLANT MATERIAL (1 - GAL) EA     132.000 10.00000 1
192 6003 PLANT MATERIAL (3 - GAL) EA     18.000 20.00000 1
192 6004 PLANT MATERIAL (5 - GAL) EA     7,772.000 29.94467 2
192 6005 PLANT MATERIAL (15 - GAL) EA     1,762.000 125.31215 2
192 6006 PLANT MATERIAL (30 - GAL) EA     3.000 550.00000 1
192 6013 MULCH SY     34,970.000 3.00303 2
192 6016 PLANT BED PREPARATION SY     33,034.000 2.01114 2
192 6046 PLANT MATERIAL (MIN 3" CAL) (B & B) EA     1.000 350.00000 1
192 6049 PLANT MATERIAL (MIN 4' TRNK HT) (PALM) EA     60.000 350.00000 1
192 6050 PLANT MATERIAL (MIN 6' TRNK HT) (PALM) EA     21.000 400.00000 1
192 6051 PLANT MATERIAL (MIN 8' TRNK HT) (PALM) EA     30.000 400.00000 1
193 6001 PLANT MAINTENANCE MO     24.000 1,500.00000 1
193 6003 PLANT REPLACEMENT (1 - GAL) EA     13.000 15.00000 1
193 6004 PLANT REPLACEMENT (3 - GAL) EA     2.000 20.00000 1
193 6005 PLANT REPLACEMENT (5 - GAL) EA     134.000 30.67164 2
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO     27.000 555.55556 2
193 6009 PLANT REPLACEMENT (15 GAL) EA     38.000 39.47368 2
193 6021 PLANT MAINTENANCE LOCATION A MO     3.000 1,000.00000 1
193 6022 PLANT MAINTENANCE LOCATION B MO     3.000 1,000.00000 1