| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | ZAPATA |
| Highway |
US 83 |
| From |
1.17 MI. N. OF SH 16 |
| To |
4.34 MI. N. OF SH 16 |
| CSJ |
0038-04-047 |
| Proj ID |
NH 2005(960) |
| Work Type |
WID FROM 2LNRUR TO 4LN DIVW / CONT TU |
| |
|
3.171 |
8056220.28 |
77701.60 |
8180899.43 |
99.9 |
| Work Order |
04-11-06 |
| Work Began |
01-22-07 |
| Work Completed |
|
| Time Computed |
04-27-06 |
| Contract Working Days |
398 |
| Addl Days Granted |
41 |
| Working Days Charged |
462 |
| Percent Time Used |
105 |
| Contractor(s) |
| FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0038-04-047 VAN - TECH LANDSCAPING & EROSION CONTROL, INC. (4.60%) SOUTHERN STAR TRANSPORT( 13.54%) SUMMIT CONTRACTING, LTD. ( 15.35%) JAVELINA CONSTRUCTION SOUTH, INC.(0.06%) SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.84%) TONY A. ENTERPRISES, INC.(0.24%) PAVEMENT MARKINGS INC. (1.27%) RICARDO AGUERO, LLC(2.48%)
|
| Contract # |
02063204 |
|
Totals |
8056220.28 |
77701.60 |
8180899.43 |
99.9 |
|
| County | STARR |
| Highway |
US 83 |
| From |
FM 650 |
| To |
GONZALEZ ST., ON GARCIA IN ROMA |
| CSJ |
0038-06-029 |
| Proj ID |
CBI 2008(337) |
| Work Type |
GR, STRS, BASE & SURF |
| |
|
1.690 |
5698856.67 |
8776.55 |
8776.55 |
0.1 |
| Work Order |
09-03-08 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
09-19-08 |
| Contract Working Days |
190 |
| Addl Days Granted |
0 |
| Working Days Charged |
25 |
| Percent Time Used |
13 |
| Contractor(s) |
| FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0038-06-029 LEAL CONSTRUCTION, INC.( 11.32%) SOIL-TECH, INC.(0.48%) TEXAS HIGHWAY SYSTEMS, INC.(0.96%) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (3.66%) SOUTHERN STAR TRANSPORT(9.63%) PAVEMENT MARKINGS(1.09%) HIGHWAY TECHNOLOGIES, L.P. (0.53%) JAVELINA CONSTRUCTION SOUTH, INC.(0.16%) GO UNDERGROUND, LIMITED LIABILITY COMPANY( 12.07%)
|
| Contract # |
07083205 |
|
Totals |
5698856.67 |
8776.55 |
8776.55 |
0.1 |
|
| County | STARR |
| Highway |
US 83 |
| From |
US 83 @ ARROYO ROMA |
| To |
. |
| CSJ |
0038-07-053 |
| Proj ID |
NH 2007(739) |
| Work Type |
REPLACE BRIDGE & REHAB APPROACHES |
| |
|
0.134 |
1353125.90 |
211923.81 |
901841.18 |
66.6 |
| Work Order |
01-04-08 |
| Work Began |
05-27-08 |
| Work Completed |
|
| Time Computed |
01-20-08 |
| Contract Working Days |
152 |
| Addl Days Granted |
0 |
| Working Days Charged |
111 |
| Percent Time Used |
73 |
| Contractor(s) |
| SUMMIT CONTRACTING, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0038-07-053 LEAL CONSTRUCTION, INC.( 19.80%) GUERRA CONSTRUCTION COMPANY(1.11%) SOIL-TECH, INC.(1.76%) ATS DESIGN & CONSTRUCTION( 13.59%) CAPROCK SPECIALITY CONTRACTORS (0.18%) HIGHWAY TECHNOLOGIES, L.P. (2.59%) RIO GRANDE REBAR PLACING, LTD. (0.42%) RHYNER CONSTRUCTION SERVICES, INC. (1.77%)
|
| Contract # |
11073022 |
|
Totals |
1353125.90 |
211923.81 |
901841.18 |
66.6 |
|
| County | STARR |
| Highway |
FM 650 |
| From |
AT DRAW, APPROX 0.5 MI W OF US 83 |
| To |
. |
| CSJ |
0038-10-006 |
| Proj ID |
BR 2002(287) |
| Work Type |
REPLACE BRIDGE & APPROACHES |
| |
|
0.389 |
1429619.20 |
48497.80 |
946460.66 |
66.2 |
| Work Order |
05-16-08 |
| Work Began |
06-03-08 |
| Work Completed |
|
| Time Computed |
06-01-08 |
| Contract Working Days |
240 |
| Addl Days Granted |
0 |
| Working Days Charged |
95 |
| Percent Time Used |
39 |
| Contractor(s) |
| MCALLEN CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0038-10-006 IOC COMPANY LLC( 22.23%) SOIL-TECH, INC.(1.61%) CENTRAL FENCE & SUPPLY (1.39%) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.22%) JAVELINA CONSTRUCTION SOUTH, INC.(0.45%) SCOTT DERR PAINTING CO (0.11%) SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (1.52%) RIO GRANDE REBAR PLACING, LTD. (1.00%) PAVEMENT MARKINGS INC. (1.28%) ACE DRILLING, INC. (1.02%)
|
| Contract # |
04083017 |
|
Totals |
1429619.20 |
48497.80 |
946460.66 |
66.2 |
|
| County | HIDALGO |
| Highway |
BU 83-S |
| From |
0.064 MI W OF FM 1427 |
| To |
US 83 (E SIDE) AT INSPIRATION ROAD |
| CSJ |
0039-02-043 |
| Proj ID |
STP 2003(101)MM |
| Work Type |
GRAD, BASE, SURF & STRS |
| |
|
3.262 |
9686528.69 |
165280.87 |
2670012.96 |
27.5 |
| County | HIDALGO |
| Highway |
BU 83-S |
| From |
US 83 (W SIDE) IN PENITAS |
| To |
0.345 MI W OF SHOWERS ROAD |
| CSJ |
0039-02-049 |
| Proj ID |
STP 2007(595) |
| Work Type |
GRAD, BASE, SURF & STRS |
| |
|
1.237 |
2077173.14 |
103077.20 |
338741.79 |
16.3 |
| County | HIDALGO |
| Highway |
BU 83-S |
| From |
0.345 MILES WEST OF SHOWERS ROAD |
| To |
0.064 MILES WEST OF FM 1427 |
| CSJ |
0039-02-050 |
| Proj ID |
STP 2003(101)MM |
| Work Type |
GRAD, BASE, SURF & STRS |
| |
|
1.116 |
2907413.41 |
37813.00 |
195413.00 |
6.7 |
| Work Order |
11-20-07 |
| Work Began |
01-14-08 |
| Work Completed |
|
| Time Computed |
12-06-07 |
| Contract Working Days |
417 |
| Addl Days Granted |
0 |
| Working Days Charged |
74 |
| Percent Time Used |
17 |
| Contractor(s) |
| FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0039-02-043 SOIL-TECH, INC.(1.20%) TONY A. ENTERPRISES, INC.(1.57%) HIGHWAY TECHNOLOGIES, L.P. (1.80%) MCALLEN CONSTRUCTION, INC. (3.58%) JAVELINA CONSTRUCTION SOUTH, INC.(0.22%) STAR OPERATIONS, INC.(3.53%) SUMMIT CONTRACTING, LTD. (5.44%) BORDER CONTRACTORS, INC. ( 22.42%)
|
| Contract # |
06073021 |
|
Totals |
14671115.24 |
306171.07 |
3204167.75 |
21.8 |
|
| County | CAMERON |
| Highway |
US 77 |
| From |
GR, STRS, & SURF |
| To |
|
| CSJ |
0039-07-186 |
| Proj ID |
NH 2002(80) |
| Work Type |
GR, STRS, & SURF |
| |
|
6.080 |
67993813.52 |
0.00 |
65024703.18 |
99.9 |
| Work Order |
02-13-03 |
| Work Began |
05-05-03 |
| Work Completed |
|
| Time Computed |
05-05-03 |
| Contract Working Days |
898 |
| Addl Days Granted |
79 |
| Working Days Charged |
1,189 |
| Percent Time Used |
121 |
| Contractor(s) |
| ZACHRY CONSTRUCTION CORPORATION |
SUBCONTRACTOR(S) FOR CCSJ: 0039-07-186 JAVELINA CONSTRUCTION SOUTH, INC.(0.09%) SLIP-TEC (DALLAS)(1.67%) BORDER CONTRACTORS, INC. (5.97%) RUDY BREDA RODBUSTERS COMPANY, INC.(0.42%) UNITED EQUIPMENT RENTALS GULF, L.P. (CORPUS CHRISTI) (0.84%) SHINN & GREGORY, INC.(0.59%) LEAL CONSTRUCTION, INC.(1.51%) STAR OPERATIONS, INC.(2.84%) BALLENGER CONSTRUCTION COMPANY ( 10.67%) A & R DEMOLITION, INC. (0.30%) AMERICAN PILE & CONCRETE CUTTING (0.06%) SCOTT DERR PAINTING CO.(0.36%) DONNELLY &_SONS(0.12%) W. W. FOUNDATION DRILLING, LTD.(3.25%) MID VALLEY PAVER INSTALLATIONS (0.53%) SOIL-TECH, INC.(0.39%) MCALLEN CONSTRUCTION, INC. (0.09%) PRIMATE CONSTUCTION,INC. (0.01%) TEXAS CURB CUT, INC.(HUB)(0.01%) RIO GRANDE REBAR PLACING, LTD. (0.08%) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (0.03%) CAPROCK SPECIALITY CONTRACTORS (0.01%)
|
| Contract # |
12023001 |
|
Totals |
67993813.52 |
0.00 |
65024703.18 |
99.9 |
|
| County | HIDALGO |
| Highway |
US 83 |
| From |
BENTSEN PALM DRIVE E |
| To |
BUS 83/INSPIRATION ROAD OVERPASS |
| CSJ |
0039-17-148 |
| Proj ID |
C 39-17-148 |
| Work Type |
GRADING, STRUCTURES, SURFACING |
| |
|
4.607 |
16077898.75 |
248563.42 |
5649896.96 |
36.6 |
| County | HIDALGO |
| Highway |
SH 495 |
| From |
0.359 MI N OF US 83 |
| To |
0.347 MI S OF US 83 |
| CSJ |
0865-01-085 |
| Proj ID |
C 865-1-85 |
| Work Type |
CONSTRUCT UNDERPASS |
| |
|
0.695 |
5788829.28 |
103605.27 |
2022863.39 |
36.4 |
| Work Order |
03-21-07 |
| Work Began |
06-19-07 |
| Work Completed |
|
| Time Computed |
04-06-07 |
| Contract Working Days |
470 |
| Addl Days Granted |
0 |
| Working Days Charged |
215 |
| Percent Time Used |
45 |
| Contractor(s) |
| FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0039-17-148 TEXAS HIGHWAY SYSTEMS, INC.(0.63%) TONY A. ENTERPRISES, INC.(0.20%) VAN - TECH LANDSCAPING & EROSION CONTROL, INC. (1.45%) BORING & TUNNELING COMPANY OF AMERICA, INC.(0.63%) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (2.93%) SUMMIT CONTRACTING, LTD. ( 19.70%) JAVELINA CONSTRUCTION SOUTH, INC.(0.67%) UNITED RENTAL (CORPUS CHRISTI) (2.66%) GO UNDERGROUND, LIMITED LIABILITY COMPANY(5.03%) CMC VALLEY STEEL (0.14%) W. W. FOUNDATION DRILLING, LTD.(0.91%) S & S PAINTING (0.40%) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.03%) BORDER CONTRACTORS, INC. (0.82%) HARDROCK UTILITY CONTRACTORS, L.L.C. (0.82%) BORDER CONTRACTORS, INC. (8.50%) HURRICANE FENCE COMPANY(0.21%)
|
| Contract # |
02073206 |
|
Totals |
21866728.03 |
352168.69 |
7672760.35 |
36.5 |
|
| County | HIDALGO |
| Highway |
US 83 |
| From |
INTERSECTION OF JACKSON & BUS 83 |
| To |
TAYLOR ROAD |
| CSJ |
0039-17-157 |
| Proj ID |
STP 2008(082) |
| Work Type |
LANDSCAPE IMPROVEMENTS |
| |
|
5.500 |
1112897.00 |
107562.70 |
991031.60 |
93.1 |
| Work Order |
11-28-07 |
| Work Began |
01-10-08 |
| Work Completed |
|
| Time Computed |
12-14-07 |
| Contract Working Days |
140 |
| Addl Days Granted |
0 |
| Working Days Charged |
197 |
| Percent Time Used |
140 |
| Contractor(s) |
| ENCINO LANDSCAPE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0039-17-157 LONE STAR TRAFFIC SERVICE, INC.(0.67%)
|
| Contract # |
10073021 |
|
Totals |
1112897.00 |
107562.70 |
991031.60 |
93.1 |
|
| County | HIDALGO |
| Highway |
US 83 |
| From |
AT THE INTRSCTN OF US 83 & FM 2220 |
| To |
. |
| CSJ |
0039-17-159 |
| Proj ID |
C 39-17-159 |
| Work Type |
GOVERNOR COMMUNITY ACHIEVEMENT AWAR |
| |
|
0.500 |
354065.60 |
0.00 |
377898.96 |
100.0 |
| County | HIDALGO |
| Highway |
FM 2220 |
| From |
BUS 83 |
| To |
EXPRESSWAY 83 IN MCALLEN |
| CSJ |
2094-01-041 |
| Proj ID |
C 2094-1-41 |
| Work Type |
SIDEWALK & PED. IMPROV. |
| |
|
1.000 |
193180.00 |
0.00 |
101716.16 |
100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
09-13-06 |
| Work Began |
10-16-06 |
| Work Completed |
04-30-08 |
| Time Computed |
09-29-06 |
| Contract Working Days |
60 |
| Addl Days Granted |
37 |
| Working Days Charged |
97 |
| Percent Time Used |
100 |
| Contractor(s) |
| ENCINO LANDSCAPE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0039-17-159 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07063023 |
|
Totals |
547245.60 |
0.00 |
479615.12 |
100.0 |
|
| County | HIDALGO |
| Highway |
US 83 |
| From |
0.5 MILES EAST OF FM 1015, EAST |
| To |
0.5 MILES EAST OF FM 1425 |
| CSJ |
0039-18-086 |
| Proj ID |
MG 2004(617) |
| Work Type |
GR, STRS, AND SURF |
| |
|
5.242 |
74461683.26 |
181681.13 |
67813167.91 |
94.8 |
| Work Order |
10-13-04 |
| Work Began |
10-18-04 |
| Work Completed |
|
| Time Computed |
10-29-04 |
| Contract Working Days |
910 |
| Addl Days Granted |
87 |
| Working Days Charged |
997 |
| Percent Time Used |
100 |
| Contractor(s) |
| WILLIAMS BROTHERS CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0039-18-086 UNITED RENTALS (BOX 4719 - HOUSTON)(0.69%) LINDA'S CONSTRUCTION INC. (LCI)(0.04%) BORDER CONTRACTORS, INC. (5.97%) SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (1.04%) GULF COAST CONTRACTORS, INC. (0.03%) RHYNER CONSTRUCTION SERVICES, INC. (0.44%) STAR OPERATIONS, INC.(2.99%) C & C CONSTRUCTION (4.70%) SCOTT DERR PAINTING CO (0.26%) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (0.05%) BEST ROAD BORING (0.21%) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.20%) VAN - TECH LANDSCAPING & EROSION CONTROL, INC. (0.14%) LEAL CONSTRUCTION, INC.(0.06%)
|
| Contract # |
08043001 |
|
Totals |
74461683.26 |
181681.13 |
67813167.91 |
94.8 |
|
| County | HIDALGO |
| Highway |
US 83 |
| From |
0.5 MILES EAST OF FM 1425 |
| To |
HIDALGO-CAMERON COUNTY LINE |
| CSJ |
0039-18-105 |
| Proj ID |
MG 2004(548) |
| Work Type |
GR, STRS, BASE & SURF |
| |
|
0.500 |
3268920.79 |
24241.83 |
1494607.67 |
47.6 |
| County | CAMERON |
| Highway |
US 83 |
| From |
0.23 MI WEST OF RABB ROAD |
| To |
LEWIS LANE |
| CSJ |
0039-19-042 |
| Proj ID |
MG 2004(548) |
| Work Type |
GR, STRS, AND SURF |
| |
|
7.121 |
84936064.31 |
1663624.53 |
73107132.78 |
89.6 |
| County | CAMERON |
| Highway |
US 83 |
| From |
CAMERON - HIDALGO COUNTY LINE |
| To |
0.23 MILES WEST OF RABB ROAD |
| CSJ |
0039-19-057 |
| Proj ID |
MG 2004(548) |
| Work Type |
GR, STRS, AND SURF |
| |
|
1.351 |
9115215.17 |
500237.51 |
6426576.32 |
73.4 |
| Work Order |
11-16-04 |
| Work Began |
01-31-05 |
| Work Completed |
|
| Time Computed |
12-02-04 |
| Contract Working Days |
1,157 |
| Addl Days Granted |
207 |
| Working Days Charged |
954 |
| Percent Time Used |
100 |
| Contractor(s) |
| ZACHRY CONSTRUCTION CORPORATION |
SUBCONTRACTOR(S) FOR CCSJ: 0039-19-042 UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON)(0.72%) SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.44%) SOIL-TECH, INC.(0.38%) GULF COAST CONTRACTORS, INC. (0.05%) TRICON PRECAST, LTD. (6.00%) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (2.62%) JAVELINA CONSTRUCTION SOUTH, INC.(0.14%) BORDER CONTRACTORS, INC. (4.59%) BEAVER UNDERGROUND CONTRACTORS, INC. (2.36%) J.H. PAINTING COMPANY(0.26%) W. W. FOUNDATION DRILLING, LTD.(1.25%) A-1 DEMOLITION, INC. (0.14%) BALLENGER CONSTRUCTION COMPANY ( 20.23%) LEAL CONSTRUCTION, INC.(3.13%) RIO GRANDE REBAR PLACING, LTD. (0.23%) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.04%) LARGE & SONS_FOUNDATION DRILLING,INC.(0.13%) L.P. COMPANY--(LEONEL PUENTE)(0.37%) DELTA STRUCTURAL TECHNOLOGY, INC.(0.06%)
|
| Contract # |
09043001 |
|
Totals |
97320200.27 |
2188103.87 |
81028316.77 |
86.7 |
|
| County | HIDALGO |
| Highway |
US 281 |
| From |
BUSINESS 281 SOUTH |
| To |
SH 107 SOUTH |
| CSJ |
0255-07-110 |
| Proj ID |
MG 2005(523) |
| Work Type |
GR., STRS., AND SURF. |
| |
|
3.119 |
45941811.81 |
1075326.64 |
42673864.10 |
96.7 |
| Work Order |
05-19-06 |
| Work Began |
06-06-06 |
| Work Completed |
|
| Time Computed |
06-04-06 |
| Contract Working Days |
670 |
| Addl Days Granted |
0 |
| Working Days Charged |
642 |
| Percent Time Used |
95 |
| Contractor(s) |
| BALLENGER CONSTRUCTION COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0255-07-110 G.O. EXCAVATING & CONSTRUCTION (1.31%) LINDA'S CONSTRUCTION INC. (LCI)(0.41%) O.A. MORENO & ASSOCIATES, INC. (0.00%) RIO GRANDE STEEL, LTD. (0.71%) RIO GRANDE REBAR PLACING, LTD. (0.60%) STAR OPERATIONS, INC.(3.13%) VAN - TECH LANDSCAPING & EROSION CONTROL, INC. (0.49%) LEAL CONSTRUCTION, INC.(1.65%) C&C CONSTRUCTION REBAR & INSTALLATION(0.00%) W. W. FOUNDATION DRILLING, LTD.(1.48%) IOC COMPANY LLC(0.66%) CABCOS CONTRACTORS LLC (1.53%) MVP INSTALLATIONS, L.P.(0.77%) UNITED RENTAL (CORPUS CHRISTI) (0.61%) GIBSON & ASSOCIATES, INC.(0.36%) A-1 DEMOLITION, INC. (0.08%) JAVELINA CONSTRUCTION, INC.(0.07%) SCHNABEL FOUNDATION CO. (HOUSTON)(0.62%) CAPROCK SPECIALITY CONTRACTORS (0.18%) DUSTROL, INC. (ROANOKE)(0.03%) MURRAY CONSTRUCTION(0.43%)
|
| Contract # |
03063001 |
|
Totals |
45941811.81 |
1075326.64 |
42673864.10 |
96.7 |
|
| County | KENEDY |
| Highway |
US 77 |
| From |
US HWY 77 SOUTH OF SARITA |
| To |
US HWY 77 SOUTH OF SARITA |
| CSJ |
0327-02-047 |
| Proj ID |
MC 327-2-47 |
| Work Type |
REPLACE SEWER SYSTEM AT SRA |
| |
|
0.001 |
496645.58 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
04-28-08 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
05-14-08 |
| Contract Working Days |
120 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ALL CONSTRUCTION WERKS |
SUBCONTRACTOR(S) FOR CCSJ: 0327-02-047 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03083232 |
|
Totals |
496645.58 |
0.00 |
0.00 |
0.0 |
|
| County | ZAPATA |
| Highway |
SH 16 |
| From |
0.033 MI NORTH OF US 83 |
| To |
2.063 MI NORTH |
| CSJ |
0517-07-034 |
| Proj ID |
STP 2008(243) |
| Work Type |
WIDEN TO 4 LANE DIVIDED URBAN |
| |
|
2.063 |
6605818.83 |
187797.14 |
1296618.50 |
19.6 |
| Work Order |
01-25-08 |
| Work Began |
03-03-08 |
| Work Completed |
|
| Time Computed |
02-10-08 |
| Contract Working Days |
319 |
| Addl Days Granted |
0 |
| Working Days Charged |
105 |
| Percent Time Used |
32 |
| Contractor(s) |
| FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0517-07-034 LEAL CONSTRUCTION, INC.(8.92%) SUMMIT CONTRACTING, LTD. ( 30.63%) LAREDO STRIPING INC. (1.42%) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (1.83%) VAN - TECH LANDSCAPING & EROSION CONTROL, INC. (0.38%) JAVELINA CONSTRUCTION SOUTH, INC.(0.55%) HIGHWAY TECHNOLOGIES, L.P. (1.74%)
|
| Contract # |
12073009 |
|
Totals |
6605818.83 |
187797.14 |
1296618.50 |
19.6 |
|
| County | HIDALGO |
| Highway |
SH 336 ETC |
| From |
ON SH 336 AND FERN AVE. |
| To |
. |
| CSJ |
0621-01-093 |
| Proj ID |
STP 2007(422)HES |
| Work Type |
IMPROVE TRAFFIC SIGNAL |
| |
|
0.460 |
794854.20 |
0.00 |
792572.00 |
99.7 |
| Work Order |
06-07-07 |
| Work Began |
10-01-07 |
| Work Completed |
|
| Time Computed |
06-23-07 |
| Contract Working Days |
242 |
| Addl Days Granted |
0 |
| Working Days Charged |
242 |
| Percent Time Used |
100 |
| Contractor(s) |
| AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 0621-01-093 PAVEMENT MARKINGS INC. ( 12.45%) HENRY'S CONSTRUCTION, INC. (0.00%) G & E ESCOBEDO CONSTRUCTION, INC.(1.86%) MUNOZ ELECTRICAL AND FOUNDATION DRILLING SERVICE (0.30%) LEAL CONSTRUCTION, INC.(3.45%)
|
| Contract # |
04073218 |
|
Totals |
794854.20 |
0.00 |
792572.00 |
99.7 |
|
| County | CAMERON |
| Highway |
SH 345 |
| From |
BUSINESS US 77 |
| To |
0.6 MI. NORTH OF FM 3462 |
| CSJ |
0630-01-042 |
| Proj ID |
STP 2007(485) |
| Work Type |
GRAD, BASE & SURF |
| |
|
2.073 |
7775846.27 |
395568.22 |
5405484.50 |
69.5 |
| Work Order |
09-05-07 |
| Work Began |
01-02-08 |
| Work Completed |
|
| Time Computed |
09-21-07 |
| Contract Working Days |
320 |
| Addl Days Granted |
0 |
| Working Days Charged |
215 |
| Percent Time Used |
67 |
| Contractor(s) |
| BALLENGER CONSTRUCTION COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0630-01-042 CHICO TRUCKING CO., INC. (1.05%) LEAL CONSTRUCTION, INC.(0.52%) RHYNER CONSTRUCTION SERVICES, INC. (0.23%) TONY A. ENTERPRISES, INC.(1.05%) RIO GRANDE REBAR PLACING, LTD. (0.34%) L & R PRECAST CONCRETE WORKS, INC. (0.12%) RIO GRANDE CONCRETE ACCESSORIES AND SUPPLIES, LTD. (1.04%) A-1 DEMOLITION, INC. (0.59%) PRIMATE CONSTRUCTION, INC. (0.20%) HIGHWAY TECHNOLOGIES, L.P. (0.96%) TREV-CORT TRUCKING INC (3.01%) TEXAS DIAMOND CONSTRUCTION (0.19%) SHINN & GREGORY, INC.(7.03%) SCOTT DERR PAINTING CO (0.06%) R.G.V. POWERPRO CONCRETE (0.11%)
|
| Contract # |
07073206 |
|
Totals |
7775846.27 |
395568.22 |
5405484.50 |
69.5 |
|
| County | CAMERON |
| Highway |
FM 511 |
| From |
US 77/83 |
| To |
FM 3248 |
| CSJ |
0684-01-046 |
| Proj ID |
NH 2008(020) |
| Work Type |
GRADING, STRUCTURES AND SURFACING |
| |
|
7.344 |
32444671.51 |
1297851.35 |
12331226.65 |
38.0 |
| County | CAMERON |
| Highway |
FM 511 |
| From |
@ UPRR WEST OF FM 1847 |
| To |
. |
| CSJ |
0684-01-057 |
| Proj ID |
STP 2008(021)RGS |
| Work Type |
GRADING, BASE, STRUCTURES, GRADE SE |
| |
|
0.421 |
4578393.94 |
0.00 |
1775176.92 |
38.7 |
| County | CAMERON |
| Highway |
FM 511 |
| From |
.874 MI E OF FM 3248 |
| To |
SH 48 |
| CSJ |
0684-01-063 |
| Proj ID |
NH 2008(020) |
| Work Type |
GRADING, STRUCTURES AND SURFACING |
| |
|
1.958 |
7127346.42 |
257627.69 |
1657560.19 |
23.2 |
| Work Order |
12-12-07 |
| Work Began |
01-23-08 |
| Work Completed |
|
| Time Computed |
12-28-07 |
| Contract Working Days |
554 |
| Addl Days Granted |
0 |
| Working Days Charged |
203 |
| Percent Time Used |
36 |
| Contractor(s) |
| BALLENGER CONSTRUCTION COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0684-01-046 MURRAY CONSTRUCTION(0.31%) CARTEL PLACERS, LLC(0.32%) PRIMATE CONSTRUCTION, INC. (0.05%) WEBBER-BALKE FOUNDATION COMPANY, INC.(1.43%) SCOTT DERR PAINTING CO (0.06%) TEXAS DIAMOND CONSTRUCTION (2.26%) SITESAFE PRODUCTS TEXAS(0.03%) HIGHWAY TECHNOLOGIES, L.P. (0.79%) LEAL CONSTRUCTION, INC.(1.31%) SUNBELT EXPRESS SERVICES, INC. (1.28%) VAN - TECH LANDSCAPING & EROSION CONTROL, INC. (1.00%) CABCOS CONTRACTORS LLC (5.69%)
|
| Contract # |
09073201 |
|
Totals |
44150411.87 |
1555479.04 |
15763963.76 |
35.7 |
|
| County | HIDALGO |
| Highway |
FM 88 |
| From |
0.25 MI N OF MI 16 N, SOUTH |
| To |
0.05 MI N OF MILE 12 N |
| CSJ |
0698-03-080 |
| Proj ID |
C 698-3-80 |
| Work Type |
WIDEN TO 4 LANE DIVIDED |
| |
|
4.203 |
13135564.30 |
388215.97 |
9794586.56 |
77.6 |
| Work Order |
12-04-06 |
| Work Began |
02-20-07 |
| Work Completed |
|
| Time Computed |
12-20-06 |
| Contract Working Days |
320 |
| Addl Days Granted |
153 |
| Working Days Charged |
436 |
| Percent Time Used |
92 |
| Contractor(s) |
| FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0698-03-080 BORDER CONTRACTORS, INC. ( 19.47%) JAVELINA CONSTRUCTION SOUTH, INC.(0.59%) SUMMIT CONTRACTING, LTD. (5.32%) STAR OPERATIONS, INC.(1.75%) TONY A. ENTERPRISES, INC.(0.42%) WALKER CONSTRUCTION(0.09%) VAN - TECH LANDSCAPING & EROSION CONTROL, INC. (0.44%) SOUTHERN STAR TRANSPORT(8.21%) HIGHWAY TECHNOLOGIES, L.P. (0.85%)
|
| Contract # |
11063201 |
|
Totals |
13135564.30 |
388215.97 |
9794586.56 |
77.6 |
|
| County | HIDALGO |
| Highway |
FM 492 |
| From |
0.028 MI NORTH OF MILE 1 N. RD. |
| To |
0.082 MI NORTH OF US 83 EXPRESSWAY |
| CSJ |
0862-01-041 |
| Proj ID |
STP 2008(380) |
| Work Type |
GRADING, STRUCTURES, SURFACING |
| |
|
0.155 |
786798.62 |
145408.34 |
522334.65 |
66.3 |
| Work Order |
03-26-08 |
| Work Began |
05-01-08 |
| Work Completed |
|
| Time Computed |
04-11-08 |
| Contract Working Days |
120 |
| Addl Days Granted |
0 |
| Working Days Charged |
117 |
| Percent Time Used |
97 |
| Contractor(s) |
| IOC COMPANY LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0862-01-041 AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (9.06%) TEXAS HIGHWAY SYSTEMS, INC.(2.47%) PAVEMENT MARKINGS INC. (4.09%)
|
| Contract # |
02083221 |
|
Totals |
786798.62 |
145408.34 |
522334.65 |
66.3 |
|
| County | HIDALGO |
| Highway |
FM 494 |
| From |
FM 1924 |
| To |
FM 495 |
| CSJ |
0864-01-055 |
| Proj ID |
C 864-1-55 |
| Work Type |
WIDEN TO 4 LANE DIVIDED |
| |
|
2.113 |
5573295.29 |
704078.65 |
4194564.69 |
78.3 |
| Work Order |
07-12-07 |
| Work Began |
01-07-08 |
| Work Completed |
|
| Time Computed |
01-01-08 |
| Contract Working Days |
246 |
| Addl Days Granted |
0 |
| Working Days Charged |
213 |
| Percent Time Used |
86 |
| Contractor(s) |
| FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0864-01-055 LEAL CONSTRUCTION, INC.(4.67%) JAVELINA CONSTRUCTION SOUTH, INC.(0.87%) HIGHWAY TECHNOLOGIES, L.P. (1.83%) TONY A. ENTERPRISES, INC.(1.37%) STAR OPERATIONS, INC.(1.89%) SOIL-TECH, INC.(0.93%) SOUTHERN STAR TRANSPORT(3.43%) BORDER CONTRACTORS, INC. ( 23.22%) SUMMIT CONTRACTING, LTD. (5.87%) W. W. FOUNDATION DRILLING, LTD.(0.43%)
|
| Contract # |
06073041 |
|
Totals |
5573295.29 |
704078.65 |
4194564.69 |
78.3 |
|