Monthly State Let Construction Report For Paris District As Of Apr 7, 2016 Page 4 Of 5

Last Update: Thursday, April 7, 2016
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyHOPKINS
Highway FM 1870
From SH 11
To CR 2309
CSJ 0735-05-017
Proj ID STP 2016(101)
Work Type REHABILITATION OF EXISTING ROAD
 
3.815 1161897.12 0.00 0.00 0.0
CountyHOPKINS
Highway FM 1870
From SH 11
To CR 2309
CSJ 0735-05-020
Proj ID STP 2016(102)HES
Work Type HAZARD ELIMINATION & SAFETY
 
3.819 542959.77 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-29-16
Work Began 03-28-16
Work Completed  
Time Computed 00-00-00
Contract Working Days 120
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0735-05-017
N-LINE TRAFFIC MAINTENANCE, L.P. (0.64%)
MOORE CONSTRUCTION, INC. (3.73%)
STRIPING TECHNOLOGY, L.P.(2.49%)
CATACON, INC.(1.45%)
SCOTT PAVING, INC. ( 24.79%)
SAMMY G. SMALLWOOD (0.95%)
Contract # 09153218
Totals 1704856.89 0.00 0.00 0.0

CountyDELTA
Highway FM 1533
From FM 1530
To FM 128
CSJ 0749-04-011
Proj ID STP 2015(537)
Work Type REHABILITATION OF EXISTING ROAD
 
3.686 1574292.03 11160.98 1528750.36 97.2
Work Order 02-20-15
Work Began 03-10-15
Work Completed  
Time Computed 03-08-15
Contract Working Days 99
Addl Days Granted 0
Working Days Charged 101
Percent Time Used 102
Contractor(s)
A. K. GILLIS & SONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0749-04-011
BAHENA CONSTRUCTION CO.,INC. ( 11.46%)
SAMMY G. SMALLWOOD (0.86%)
CATACON, INC.(1.14%)
STRIPING TECHNOLOGY, L.P.(1.94%)
ALTUS TRAFFIC MANAGEMENT LLC (0.59%)
MOORE CONSTRUCTION, INC. (2.98%)
Contract # 01153010
Totals 1574292.03 11160.98 1528750.36 97.2

CountyHOPKINS
Highway FM 69
From 1.553 MI S OF FM 1537
To 3.830 MI N OF FM 1537
CSJ 0766-01-027
Proj ID STP 2014(203)
Work Type REHABILITATION OF EXISTING ROAD
 
5.383 1863527.19 0.00 1886752.86 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 02-12-14
Work Began 04-09-14
Work Completed 02-17-16
Time Computed 00-00-00
Contract Working Days 186
Addl Days Granted 19
Working Days Charged 230
Percent Time Used 112
Contractor(s)
SAMMY GIST ENTERPRISES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0766-01-027
SAMMY G. SMALLWOOD (1.49%)
DUSTIN ALLEN, INC. (0.72%)
CATACON, INC.(5.26%)
TOTAL HIGHWAY MAINTENANCE, LLC (2.17%)
MOORE CONSTRUCTION, INC. (3.75%)
SCOTT PAVING, INC. ( 15.94%)
BAHENA CONSTRUCTION CO.,INC. ( 11.29%)
LYON BARRICADE AND CONSTRUCTION CO.(0.95%)
TEXANA LAND & ASPHALT, INC.(0.64%)
Contract # 11133210
Totals 1863527.19 0.00 1886752.86 100.0

CountyHUNT
Highway FM 513
From FM 499
To IH 30 SOUTH FRONTAGE ROAD
CSJ 0768-02-020
Proj ID STP 2015(529)
Work Type REHABILITATION OF EXISTING ROAD
 
1.836 1604270.96 10612.00 1604753.36 99.9
Work Order 02-13-15
Work Began 06-02-15
Work Completed  
Time Computed 06-15-15
Contract Working Days 118
Addl Days Granted 7
Working Days Charged 131
Percent Time Used 104
Contractor(s)
A. K. GILLIS & SONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0768-02-020
TOTAL HIGHWAY MAINTENANCE, LLC (0.37%)
BAHENA CONSTRUCTION CO.,INC. ( 14.11%)
CATOCON, INC.(1.27%)
TEX OP CONSTRUCTION, LP(0.43%)
HIGHWAY 19 CONSTRUCTION, LLC ( 11.39%)
STRIPING TECHNOLOGY, L.P.(1.40%)
MOORE CONSTRUCTION, INC. (3.01%)
SAMMY SMALLWOOD COMPANY(4.87%)
DUSTROL, INC.(0.26%)
TEXANA LAND & ASPHALT, INC.(0.85%)
Contract # 01153214
Totals 1604270.96 10612.00 1604753.36 99.9

CountyLAMAR
Highway FM 906
From CR 45030
To CR 47400
CSJ 0769-02-028
Proj ID STP 2016(189)
Work Type REHABILITATION OF EXISTING ROAD
 
10.655 4368067.41 0.00 0.00 0.0
CountyLAMAR
Highway FM 906
From FM 197
To US 271
CSJ 0769-02-030
Proj ID STP 2016(190)HES
Work Type HAZARD ELIMINATION & SAFETY
 
4.454 1549596.88 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 345
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
D. L. LENNON INCORPORATED - CONTRACTOR
SUBCONTRACTOR(S) FOR CCSJ: 0769-02-028
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 01163215
Totals 5917664.29 0.00 0.00 0.0

CountyRED RIVER
Highway FM 410
From 3.2 MILES N OF US 82
To FM 195
CSJ 0772-01-027
Proj ID STP 2014(033)
Work Type REHABILITATION OF EXISTING ROAD
 
7.420 2516692.96 0.00 2615455.73 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-04-13
Work Began 01-02-14
Work Completed 02-05-15
Time Computed 00-00-00
Contract Working Days 330
Addl Days Granted 0
Working Days Charged 171
Percent Time Used 51
Contractor(s)
A. K. GILLIS & SONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0772-01-027
LYON BARRICADE AND CONSTRUCTION CO.(1.04%)
CATACON, INC.(1.47%)
HIGHWAY 19 CONSTRUCTION, LLC ( 15.39%)
SAMMY G. SMALLWOOD (4.14%)
STRIPING TECHNOLOGY, L.P.(3.04%)
MOORE CONSTRUCTION, INC. (2.77%)
Contract # 09133031
Totals 2516692.96 0.00 2615455.73 100.0

CountyLAMAR
Highway VA
From VARIOUS LOCATIONS IN HUNT AND
To HOPKINS COUNTIES
CSJ 0901-00-052
Proj ID STP 2014(632)
Work Type CONSTRUCT CURB RAMPS
 
0.001 1777289.00 0.00 1644757.68 93.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-20-14
Work Began 07-07-14
Work Completed  
Time Computed 07-06-14
Contract Working Days 194
Addl Days Granted 5
Working Days Charged 226
Percent Time Used 113
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-00-052
TOTAL HIGHWAY MAINTENANCE, LLC (0.60%)
ACTION SERVICES(0.44%)
Contract # 05143222
Totals 1777289.00 0.00 1644757.68 93.7

CountyLAMAR
Highway VA
From VARIOUS LOCATIONS IN PARIS DISTRICT
To .
CSJ 0901-00-053
Proj ID STP 2014(702)
Work Type MISCELLANEOUS CONSTRUCTION
 
0.001 217690.25 0.00 185236.75 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-20-14
Work Began 08-28-14
Work Completed 02-03-15
Time Computed 08-19-14
Contract Working Days 38
Addl Days Granted 0
Working Days Charged 36
Percent Time Used 94
Contractor(s)
LONE STAR BARRIER SERVICES, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-00-053
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05143037
Totals 217690.25 0.00 185236.75 100.0

CountyHUNT
Highway CR
From INDIAN TRAIL RD IN HAWK COVE
To @ HAWK COVE TRIBUTARY
CSJ 0901-22-097
Proj ID BR 2012(621)
Work Type BRIDGE REPLACEMENT
 
0.090 549983.20 1500.00 569051.29 100.0
Work Order 10-28-14
Work Began 12-03-14
Work Completed 02-26-16
Time Computed 12-29-14
Contract Working Days 234
Addl Days Granted 0
Working Days Charged 96
Percent Time Used 41
Contractor(s)
EAST TEXAS BRIDGE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0901-22-097
FORTSON CONTRACTING, INC.(4.80%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (9.79%)
Contract # 08143033
Totals 549983.20 1500.00 569051.29 100.0

CountyRED RIVER
Highway CS
From ON PECAN STREET IN CLARKSVILLE
To @ DELAWARE CREEK
CSJ 0901-27-029
Proj ID BR 2008(634)
Work Type BRIDGE REPLACEMENT
 
0.171 1506400.30 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-16-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 190
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
3LW MANAGEMENT, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-27-029
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 01163036
Totals 1506400.30 0.00 0.00 0.0

CountyRED RIVER
Highway CR
From ON CR 3230 & CR 3240 FROM FM 1158
To FM 1159
CSJ 0901-27-044
Proj ID HP 2012(770)
Work Type PAVING, BASE WORK, OVERLAY, ETC.
 
7.247 0.00 0.00 871221.03 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-06-13
Work Began 08-20-13
Work Completed 02-18-16
Time Computed 08-22-13
Contract Working Days 58
Addl Days Granted 49
Working Days Charged 107
Percent Time Used 100
Contractor(s)
SAMMY GIST ENTERPRISES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0901-27-044
MOORE CONSTRUCTION, INC. (1.47%)
LYON BARRICADE AND CONSTRUCTION CO.(0.59%)
WES SCOTT, INC.( 29.01%)
HIGHWAY 19 CONSTRUCTION, LLC (2.46%)
Contract # 04133006
Totals 0.00 0.00 871221.03 0.0

CountyHOPKINS
Highway CR
From CR 431-1
To AT BIG CREEK
CSJ 0901-28-053
Proj ID BR 2013(721)
Work Type BRIDGE REPLACEMENT
 
0.188 683133.48 0.00 676852.74 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-02-14
Work Began 06-02-14
Work Completed 09-18-15
Time Computed 06-02-14
Contract Working Days 167
Addl Days Granted 0
Working Days Charged 104
Percent Time Used 62
Contractor(s)
EAST TEXAS BRIDGE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0901-28-053
LONE STAR BARRIER SERVICES, LLC(3.76%)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.02%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (5.23%)
MCL CONTRACTING, LLC (0.73%)
Contract # 02143017
Totals 683133.48 0.00 676852.74 100.0

CountyHOPKINS
Highway CR
From CR 444-1
To AT REDDING CREEK
CSJ 0901-28-086
Proj ID BR 2015(645)
Work Type BRIDGE REPLACEMENT
 
0.059 285542.34 64718.85 194693.17 68.1
Work Order 11-24-15
Work Began 01-04-16
Work Completed  
Time Computed 12-24-15
Contract Working Days 64
Addl Days Granted 0
Working Days Charged 37
Percent Time Used 57
Contractor(s)
CDM HOLDINGS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-28-086
TOTAL HIGHWAY MAINTENANCE, LLC (0.96%)
SOUTHWEST ENVIRONMENT SERVICES LLC (2.60%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (7.56%)
SAMMY G. SMALLWOOD (5.40%)
Contract # 10153016
Totals 285542.34 64718.85 194693.17 68.1

CountyLAMAR
Highway CR
From AT CANE CREEK
To CR 510-1
CSJ 0901-29-065
Proj ID BR 2014(599)
Work Type BRIDGE REPLACEMENT
 
0.136 656785.40 151895.54 305641.17 46.5
Work Order 09-09-15
Work Began 11-06-15
Work Completed  
Time Computed 10-09-15
Contract Working Days 209
Addl Days Granted 0
Working Days Charged 72
Percent Time Used 34
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-29-065
MOORE CONSTRUCTION, INC. (1.18%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (8.12%)
SAMMY SMALLWOOD COMPANY(6.83%)
N-LINE TRAFFIC MAINTENANCE, L.P. (1.45%)
Contract # 07153047
Totals 656785.40 151895.54 305641.17 46.5

CountyFANNIN
Highway CR
From CR 237-2
To AT POT CREEK
CSJ 0901-32-043
Proj ID BR 2013(433)
Work Type BRIDGE REPLACEMENT
 
0.020 417187.50 3305.00 401632.36 96.8
Work Order 08-27-14
Work Began 10-24-14
Work Completed  
Time Computed 10-27-14
Contract Working Days 115
Addl Days Granted 0
Working Days Charged 119
Percent Time Used 103
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-32-043
TOTAL HIGHWAY MAINTENANCE, LLC (1.45%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (5.82%)
LONE STAR BARRIER SERVICES, LLC(4.06%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.80%)
Contract # 07143019
Totals 417187.50 3305.00 401632.36 96.8

CountyFANNIN
Highway CR
From CR 239-5
To AT N SULPHUR RIVER TRIBUTARY
CSJ 0901-32-044
Proj ID BR 2013(424)
Work Type BRIDGE REPLACEMENT
 
0.418 1410705.60 17815.00 1410200.10 99.9
Work Order 01-17-14
Work Began 03-18-14
Work Completed  
Time Computed 03-28-14
Contract Working Days 332
Addl Days Granted 0
Working Days Charged 289
Percent Time Used 87
Contractor(s)
HODGES AND SON CONSTRUCTION COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0901-32-044
LYON BARRICADE AND CONSTRUCTION CO.(1.03%)
DUSTIN ALLEN, INC. (3.45%)
PRIMATE CONSTRUCTION, INC. (1.45%)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.00%)
Contract # 12133210
Totals 1410705.60 17815.00 1410200.10 99.9

CountyHUNT
Highway FM 1568
From FM 3218
To SH 499
CSJ 1497-01-012
Proj ID STP 2013(910)
Work Type REHABILITATION OF EXISTING ROAD
 
4.393 1749177.04 0.00 1726893.17 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-04-13
Work Began 12-12-13
Work Completed 08-22-14
Time Computed 00-00-00
Contract Working Days 197
Addl Days Granted 0
Working Days Charged 114
Percent Time Used 57
Contractor(s)
A. K. GILLIS & SONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1497-01-012
LYON BARRICADE AND CONSTRUCTION CO.(0.63%)
CATOCON, INC.(1.39%)
MOORE CONSTRUCTION, INC. (2.92%)
STRIPING TECHNOLOGY, L.P.(2.64%)
SAMMY G. SMALLWOOD (2.60%)
Contract # 09133022
Totals 1749177.04 0.00 1726893.17 100.0

CountyLAMAR
Highway SL 286
From 864 FT WEST OF KIAMICHI RAILROAD
To 775 FT SOUTH OF US 271 SOUTH
CSJ 1690-01-112
Proj ID STP 1502(187)
Work Type OVERLAY
 
6.247 1981524.05 35526.25 2266385.41 99.9
Work Order 06-11-15
Work Began 07-13-15
Work Completed  
Time Computed 07-12-15
Contract Working Days 42
Addl Days Granted 10
Working Days Charged 85
Percent Time Used 163
Contractor(s)
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 1690-01-112
ALTUS TRAFFIC MANAGEMENT LLC (0.31%)
MOORE CONSTRUCTION, INC. (1.12%)
DIAMOND SURFACE, INC.(0.42%)
STRIPING TECHNOLOGY, L.P.(3.50%)
A. K. GILLIS & SONS, INC.( 10.36%)
TEX OP CONSTRUCTION, LP(0.37%)
SAMMY GIST ENTERPRISES, L.L.C. (1.40%)
Contract # 05153035
Totals 1981524.05 35526.25 2266385.41 99.9

CountyHUNT
Highway FM 118
From SS 118
To FM 512
CSJ 1725-01-011
Proj ID STP 2015(620)
Work Type REHABILITATION OF EXISTING ROAD
 
5.410 2470540.21 20320.00 1954190.78 79.0
Work Order 03-26-15
Work Began 06-26-15
Work Completed  
Time Computed 06-24-15
Contract Working Days 144
Addl Days Granted 0
Working Days Charged 91
Percent Time Used 63
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 1725-01-011
TOTAL HIGHWAY MAINTENANCE, LLC (0.44%)
WITHERS CONSTRUCTION, LLC(1.23%)
MOORE CONSTRUCTION, INC. (3.52%)
SCOTT PAVING, INC. ( 23.52%)
STRIPING TECHNOLOGY, L.P.(2.10%)
SAMMY SMALLWOOD COMPANY(4.31%)
Contract # 02153032
Totals 2470540.21 20320.00 1954190.78 79.0

CountyLAMAR
Highway FM 2122
From 1.067 MI S OF FM 1506
To 2.864 MI S OF FM 1506
CSJ 2003-01-008
Proj ID STP 2016(839)HES
Work Type HAZARD ELIMINATION & SAFETY
 
1.797 507596.00 0.00 0.00 0.0
CountyLAMAR
Highway FM 2122
From 1.067 MI S OF FM 1506
To 2.864 MI S OF FM 1506
CSJ 2003-01-009
Proj ID STP 2016(838)
Work Type SEAL COAT
 
1.797 256258.27 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 38
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 2003-01-008
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03163217
Totals 763854.27 0.00 0.00 0.0