Skip to main content

US 380 from Teel Parkway/Championship Drive to west of Lakewood Drive

Draft environmental assessment available and virtual public hearing with in-person option

Virtual: Thursday, Feb. 23, 2023, beginning at 6 p.m. through Friday, March 10, 2023, at 11:59 p.m.

In-person: Thursday, Feb. 23, 2023 6 - 8 p.m.

Public comment deadline

Comments must be received on or before Friday, March 10, 2023, to be part of the public hearing record.

Virtual details

The virtual public hearing will be posted here on Thursday, Feb. 23, 2023, at 6 p.m. through Friday, March 10, 2023, at 11:59 p.m. Please note, this is not a live event. The materials can be viewed at your convenience.

Additionally, TxDOT is providing two in-person hearing options for individuals who would like to participate in person instead of online. In-person attendees will be able to review the same materials and presentation as the online public hearing.

In-person details Thursday, Feb. 23, 2023 
6 - 8 p.m.
Rock Hill High School Cafeteria   
16061 Coit Road
Frisco, TX 75035
Purpose TxDOT is proposing to widen US 380 from Teel Parkway/Championship Drive in Denton County to west of Lakewood Drive in Collin County, Texas.
Description

TxDOT is proposing to reconstruct 5.9 miles of US 380 from Teel Parkway/Championship Drive in Denton County to west of Lakewood Drive in Collin County. The proposed project involves the full reconstruction of the existing five-lane rural roadway in Denton County and six-lane urban roadway in Collin County to a six-lane divided highway with two to three-lane continuous frontage roads. In addition to adding lanes, the proposed design includes drainage improvements, ramps to provide accessibility, interchange improvements to meet safety and/or capacity requirements, and a shared use path on the south side of US 380 from Teel Parkway/Championship Drive to Coit Road, and shared use paths along both sides of the corridor from Coit Road to Lakewood Drive. The roadway passes through the cities of Frisco, Prosper and McKinney.

The existing US 380 right-of-way (ROW) width ranges from 158 to 287 feet throughout the length of the project. The proposed ROW width varies from 245 to 522 feet with a typical ROW of 336 feet. The total proposed ROW acreage is estimated at 152 acres and 0.4 acre of easement. 

Although additional right-of-way would be required, no residential or non-residential structures are anticipated to be displaced at this time.

Accessibility The public hearing will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the public hearing, please contact the Dallas District Public Information Office at (214) 320-4480 no later than 4 p.m. CST, Wednesday, February 15, 2023. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.
Meeting materials
How to make a comment

Comments must be postmarked or otherwise received by Friday, March 10, 2023 to: TxDOT Dallas District Office, 4777 East US Highway 80, Mesquite, Texas 75150-6643; by email as described in the notice.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT.

Posted: Jan. 31, 2023