The Southeast Connector is a Design-Build (DB) Project in the Fort Worth District consisting of approximately 16 miles of non-tolled improvements to I-20 from Forest Hill Drive to Little Road, to I-820 from I-20 to Brentwood Stair Road, and to US 287 from Bishop Street to Sublett Road. This project has been identified through the Texas Clear Lanes Initiative, a strategic plan, to address congestion, safety and mobility in the area.

This DB Project includes the design, construction, and maintenance of the roadways, which includes the following:

  • I-20 from Forest Hill Dr. to Park Springs Blvd: Construction of one additional general purpose lane (GPL), four-lane collector distributor roads (CDs), in each direction. Reconstruction and realignment of existing GPLs, frontage roads, I-20/ US 287 interchange and ramps. This includes the Deferred Work Component #3: I-20 from Little Rd. to Park Springs Blvd., which will be constructed at a later time.
  • I-820 from I-20 to Brentwood Stairs Rd: Construction of two additional GPL in each direction. Construction of1additional frontage road lane in each direction. Reconstruction and realignment of existing GPLs, frontage roads, I-20 / I-820 interchange, and ramps.This includes the DWC #1: I-820 from Ramey Ave. to Brentwood Stairs Rd., which is currently under construction.
  • US 287 from Bishop St. to Sublett Rd.: Construction of one GPL in each direction. Reconstruction and realignment of existing GPLs, frontage roads, I-820/ US 287 interchange and ramps. This includes the DWC #2: US 287 from Village Creek Rd. to Bishop St., which will be constructed at a later time.

Team

This project is being completed through the partnered efforts between TxDOT, owner and manager, and South-Point Constructors, the Design-Build Contractor. South-Point Constructors is a joint venture between Kiewit Infrastructures South Co. (Westlake), and Austin Road & Bridge, LP (Austin).

Project timeline

SE Connector project timeline

Resources

Learn more about the historical context of this project and the Design-Build Executed Agreements.

If you are travelling through the project, check our lane closures page to plan your trip. You can also follow the links below to learn more about local cities in your area and Texas highway conditions.