Letting Schedule for September, 2016 County (FY 2017)
September, 2016 (FY 2017) | (see Links) |
SEP 2016 | OCT 2016 | NOV 2016 | DEC 2016 | JAN 2017 | FEB 2017 | MAR 2017 | APR 2017 | MAY 2017 | JUN 2017 | JUL 2017 | AUG 2017 | | ||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description |
---|---|---|---|---|---|---|
0961-03-014 | Andrews/ Odessa | FM 181 | Actual | $7,964,589 | 1 | SEAL COAT |
0271-08-012 | Austin/ Yoakum | US 90 | Actual | $10,516,974 | 6 | REPLACE BRIDGE AND APPROACHES |
1730-01-040 | Bandera/ San Antonio | FM 1283 | Actual | $642,500 | 8 | INSTALL LED FLASHING CHEVRONS -CURVE, TEXTURIZE SHOULDERS- |
0914-18-108 | Bastrop/ Austin | CR | Actual | $397,815 | 6 | REPLACE BRIDGE & APPROACHES |
0015-04-087 | Bell/ Waco | SS 290 | Actual | $1,271,563 | 1 | MILL AND INLAY |
2104-02-032 | Bexar/ San Antonio | FM 1957 | Actual | $1,015,260 | 8 | INSTALL RAISED MEDIAN |
1378-04-048 | Burnet/ Austin | RM 1431 | Actual | $2,001,243 | 1 | MILL, SEAL AND OVERLAY |
0471-04-031 | Caldwell/ Austin | SH 21 | Actual | $198,570 | 10 | RIPRAP,EMBANKMENT,SPEC EXCAV WORK,FLOWABLE BACKFILL,MBGF |
0384-01-021 | Caldwell/ Austin | SH 142 | Actual | $3,219,620 | 1 | SEAL & THIN OVERLAY |
0739-01-039 | Chambers/ Beaumont | IH 10 | Actual | $55,013,323 | 1 | WIDEN EXISTING FOUR LANE TO SIX LANE |
0031-06-032 | Childress/ Childress | US 62 | Actual | $7,203,340 | 1 | REHABILITATION OF EXISTING ROADWAY |
0016-05-113 | Comal/ San Antonio | IH 35 | Actual | $837,705 | 8 | INSTALLING FLASHING BEACON AT FRONTAGE ROAD INTERSECTION |
0870-04-039 | Concho/ San Angelo | FM 765 | Actual | $3,210,000 | 1 | RESTORATION OF EXISTING ROAD |
0251-03-021 | Coryell/ Waco | US 281 | Actual | $9,192,349 | 1 | SEAL COAT |
0918-00-263 | Dallas/ Dallas | VA | Actual | $1,714,051 | 1 | WRONG WAY DRIVING IMPLEMENTATION TO PREVENT WRONG WAY |
0047-07-231 | Dallas/ Dallas | US 75 | Actual | $688,303 | 1 | INSTALL GUIDE SIGNS |
0196-01-106 | Denton/ Dallas | IH 35E | Actual | $32,190,862 | 3 | CONSTRUCT GRADE SEPARATION ALONG IH 35E AT BRINKER AND |
0623-01-022 | Duval/ Laredo | SH 339 | Actual | $1,705,394 | 1 | RESURFACE OF EXISTING HIGHWAY |
2121-02-146 | El Paso/ El Paso | IH 10 | Actual | $1,453,755 | 11 | INSTALL HIGH MAST LIGHTING |
0167-02-058 | El Paso/ El Paso | BU 54-A | Actual | $770,665 | 8 | INSTALL CONTINUOUS TURN LANE |
0027-06-057 | Fort Bend/ Houston | US 90A | Actual | $974,274 | 1 | BASE REPAIR AND 1.5" ACP OVERLAY |
0527-06-019 | Fort Bend/ Houston | FM 360 | Actual | $1,859,938 | 1 | BASE REPAIR, MILLING, 1.5" ACP OVERLAY AND PAVEMENT MARKINGS |
0389-06-106 | Galveston/ Houston | SH 146 | Actual | $8,783,992 | 1 | BASE REPAIR AND 1.5" ACP OVERLAY |
0045-19-058 | Grayson/ Paris | US 82 | Actual | $21,960 | 10 | EMERGENCY REPAIRS DUE TO FLOODING |
2640-01-008 | Grayson/ Paris | FM 1310 | Actual | $44,461 | 10 | EMERGENCY REPAIRS DUE TO FLOODING |
0043-02-073 | Hardeman/ Childress | US 287 | Actual | $6,007,515 | 11 | REHABILITATION / ACP OVERLAY |
0098-01-038 | Hardeman/ Childress | SH 6 | Actual | $6,956,642 | 1 | REHABILITATION OF EXISTING ROAD |
0912-72-325 | Harris/ Houston | CS | Actual | $13,000,000 | 3 | DESIGN AND RECONSTRUCT ROADWAY WITH TRANSITWAY (YEAR 5) |
0912-72-368 | Harris/ Houston | CS | Actual | $2,385,000 | 3 | RECONSTRUCT SIDEWALKS AND INSTALL PEDESTRIAN AMENITIES |
0912-72-369 | Harris/ Houston | CS | Actual | $3,412,000 | 3 | RECONSTRUCT BACK OF CURB INFRASTRUCTURE - SIDEWALKS, CURBS, |
0912-70-112 | Harris/ Houston | CR | Actual | $23,600 | 10 | REMOVE DAMAGED CONTROL CABINET AND REPLACE WITH PERMANENT |
0255-09-095 | Hidalgo/ Pharr | US 281 | Actual | $5,653,867 | 1 | OVERLAY |
2094-01-059 | Hidalgo/ Pharr | FM 2220 | Actual | $2,227,268 | 1 | SEAL COAT |
0109-05-040 | Houston/ Lufkin | SH 19 | Actual | $964,813 | 8 | SAFETY TREAT FIXED OBJECTS |
0908-12-022 | Howard/ Abilene | VA | Actual | $68,227,779 | 11 | CONSTRUCT NEW RELIEF ROUTE |
0901-22-107 | Hunt/ Paris | CR | Actual | $515,561 | 6 | BRIDGE REPLACEMENT |
0028-06-081 | Jefferson/ Beaumont | US 90 | Actual | $9,786,032 | 1 | SEAL COAT |
0014-04-080 | Johnson/ Ft Worth | IH 35W | Actual | $296,075 | 1 | CABLE MEDIAN BARRIER INSTALLATION |
0366-06-042 | Karnes/ Corpus Christi | SH 123 | Actual | $21,245,304 | 1 | REHAB ROADWAY AND ADD PASSING LANES |
0142-14-062 | Kerr/ San Antonio | IH 10 | Actual | $2,649,852 | 1 | RECONSTRUCT UNDER FM 783 TO INCREASE VERTICAL CLEARANCE; |
0680-01-015 | Lamar/ Paris | FM 196 | Actual | $2,990,236 | 1 | REHABILITATION OF EXISTING ROAD |
0276-02-028 | Maverick/ Laredo | US 57 | Actual | $2,580,723 | 1 | RESURFACE OF EXISTING HIGHWAY |
1706-03-008 | Montgomery/ Houston | FM 1097 | Actual | $7,302,114 | 1 | BASE REPAIR, OCST, 1.5" OVERLAY AND ADD SHOULDER |
0918-18-126 | Navarro/ Dallas | CR | Actual | $1,159,156 | 6 | REPLACE BRIDGE AND APPROACHES |
0904-00-162 | Potter/ Amarillo | VA | Actual | $453,129 | 1 | CRACK SEAL |
0049-06-076 | Robertson/ Bryan | SH 6 | Actual | $55,470 | 8 | SAFETY WORK CONSISTING OF INSTALLATION OF AN INTERSECTION |
0009-12-216 | Rockwall/ Dallas | IH 30 | Actual | $1,637,949 | 5 | INSTALLATION OF WIRELESS ITS |
0059-04-047 | Shelby/ Lufkin | SH 7 | Actual | $1,879,229 | 10 | EMERGENCY SLOPE REPAIRS |
0059-04-048 | Shelby/ Lufkin | SH 7 | Actual | $761,570 | 10 | EMERGENCY SLOPE REPAIRS |
0520-01-021 | Smith/ Tyler | SH 155 | Actual | $6,621,487 | 1 | REPAIR AND RESURFACE ROADWAY |
0902-90-066 | Tarrant/ Ft Worth | CS | Actual | $14,271 | 10 | PERMANENT GUARDRAILS REPLACED AND SCOURED ASPHALT MILLED |
0010-06-041 | Titus/ Atlanta | US 67 | Actual | $2,357,159 | 8 | PROFILE EDGELINE MARKINGS |
1377-01-020 | Travis/ Austin | FM 1327 | Actual | $420,041 | 10 | RIPRAP,MBGF END TREATMENT, TRAFFIC CONTROL ITEMS, INSTALL |
0914-04-304 | Travis/ Austin | CS | Actual | $56,113 | 10 | REPAIR EROSION AT BRIDGE ENDS,REMOVE EXISTING CONCRETE |
2100-01-062 | Travis/ Austin | RM 2222 | Actual | $62,086 | 10 | RIPRAP (STONE COMMON), GABIONS(3'X 3')(GALV), EQUIPMENT HOUR |
0402-01-023 | Upshur/ Atlanta | SH 154 | Actual | $1,515,864 | 8 | TEXTURIZE SHOULDERS & CL TEXTURING |
0036-07-033 | Uvalde/ San Antonio | US 83 | Actual | $904,470 | 1 | IMPROVE HORIZONTAL ALIGNMENT |
3550-01-014 | Walker/ Bryan | FM 3478 | Actual | $20,126 | 10 | ROADWAY REPAIR_(REPAIR PAVEMENT STRUCTURE AND ROADBED) |
0004-04-086 | Ward/ Odessa | IH 20 | Actual | $19,776,651 | 1 | FACILITY UPGRADES TO MEET FREEWAY STANDARDS |
0327-10-058 | Willacy/ Pharr | IH 69E | Actual | $4,494,332 | 1 | OVERLAY_(MAIN LANES) |
0015-09-179 | Williamson/ Austin | IH 35 | Actual | $15,486,071 | 1 | BRIDGE REPLACEMENT & INTERSECTION IMPROVEMENTS @ FM 3406 |
0914-05-182 | Williamson/ Austin | VA | Actual | $99,698 | 10 | ADD ROAD BASE MATERIAL TO WMA ROAD TO BOAT RAMP ON |
0143-05-032 | Wilson/ San Antonio | US 87 | Actual | $11,604,417 | 1 | REHAB EXISTING ROADWAY |
|