Letting Schedule for El Paso District (FY 2017)

Last Update: Monday, October 16, 2017
El Paso District (FY 2017)
Brewster | Culberson | El Paso | Hudspeth | Presidio |

Brewster County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0021-01-053US 67ActualJan 2017$4,297,9721ROADWAY REHABILITATION

Culberson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0003-01-057IH 10ActualJul 2017$1,198,3361INSTALL MEDIAN BARRIER
0233-01-044US 62ActualApr 2017$4,151,4608MODERNIZE BRIDGE RAIL AND APPROACH GUARDRAIL, SAFETY TREAT F

El Paso County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
2121-02-146IH 10ActualSep 2016$1,453,75511INSTALL HIGH MAST LIGHTING
0167-02-058BU 54-AActualSep 2016$770,6658INSTALL CONTINUOUS TURN LANE
2121-02-150IH 10ActualJul 2017$27,367,3811MESA PARK INTERCHANGE AND FRONTAGE ROADS
0167-02-050BU 54-AActualNov 2016$9,168,0003RAPID TRANSIT SYSTEM_(RTS)
0924-06-111CSActualNov 2016$9,660,7553CONSTRUCT NEW 4 LANE RAISED MEDIAN DIVIDED URBAN COLLECTOR
0924-06-512CSActualNov 2016$458,5173CONSTRUCT SIDEWALKS AND ADA ACCESSIBLE RAMPS ON NONAP RD, BR
0924-06-506VAActualMar 2017$1,100,0005PURCHASE OF 2 BUSES
0924-06-533VAActualJul 2017$1,472,15710FY 2017 GREEN RIBBON PROJECT
0167-02-059SL 478ApprovedAug 2017$1,250,0003CONSTRUCTION OF PEDESTRIAN ENHANCEMENTS ALONG THE DYER RTS R
0924-06-535VAActualAug 2017$4,340,0007HIGHWAY EMERGENCY RESPONSE OPERATIONS (HERO)
0924-06-269CSActualJul 2017$2,540,0003BUILD 4-LANE DIVIDED NON-FREEWAY FACILITY
0167-01-095US 54ActualAug 2017$36,061,6741WIDEN BY ADDING 2 INSIDE LANES, HIGHMAST ILLUMINATION, AND
0674-02-011FM 76ActualJul 2017$1,417,7446REPLACE BRIDGES AND APPROACHES
0924-06-536VAActualAug 2017$2,000,0005WEST EL PASO TRAFFIC MITIGATION CIRCULATOR SERVICE YR2-2017
2121-03-154IH 10ActualAug 2017$14,968,5865RAMP IMPROVEMENTS
0002-12-023US 62ActualApr 2017$3,564,5708IMPROVE TRAFFIC SIGNAL
0002-01-055SH 20ActualMay 2017$8,862,05311RECONSTRUCITON OF ROADWAY, INTERSECTION IMPROVEMENTS & REHAB
0924-00-082VAActualMay 2017$1,143,8391FY 2017 STRIPING PROJECTS
0002-12-025US 62ActualJul 2017$648,6665TRAFFIC SIGNAL MODIFICATIONS AT PAISANO DR/TROWBRIDGE DR

Hudspeth County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0002-05-045IH 10ActualJul 2017$687,6141CHANNEL IMPROVEMENTS

Presidio County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0104-10-006US 67ActualAug 2017$6,408,84711NEW TWO-LANE TWIN BRIDGE STRUCTURE FOR SOUTHBOUND TRAFFIC
0957-08-027FM 170ActualNov 2016$1,001,99811REHAB EXISTING ROAD


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract