Letting Schedule for Ft Worth District (FY 2017)

Last Update: Monday, October 16, 2017
Ft Worth District (FY 2017)
Erath | Hood | Jack | Johnson | Palo Pinto | Parker | Tarrant | Wise |

Erath County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0079-05-054US 67ActualMar 2017$4,915,3841WEDGE MILL, SEAL COAT, & HMAC OVERLAY MAIN LANES & SHOULDERS
0550-02-038FM 8ActualJan 2017$7,663,0471SEAL COAT MAIN LANES AND SHOULDERS

Hood County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0385-04-045SH 144ActualJan 2017$2,920,3661REPLACE EXISTING DRAINAGE STRUCTURE
3123-01-014FM 4ActualApr 2017$3,904,8211WIDEN PAVEMENT AND ADD SHOULDERS
0080-04-096US 377ActualJan 2017$3,528,0731THIN OVERLAY MIXTURE (TOM)
1513-01-019FM 167ActualMay 2017$2,732,5298SAFETY TREAT FIXED OBJECTS AND CONSTRUCT PAVED SHOULDERS
0902-51-028VAActualJan 2017$1,607,4163SIDEWALK/RAMP IMPROV, HMAC OVERLAY, LIGHTING, CONST OF ADA

Jack County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0249-07-069US 281ActualFeb 2017$382,7098SHOULDER AND CENTERLINE RUMBLE STRIPS, REFLECTIVE PAVEMENT

Johnson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0902-50-113VAActualApr 2017$1,208,3673CONSTRUCT BICYCLE/PEDESTRIAN PATH
1181-04-044FM 917ActualJan 2017$560,71113/4 INCH THIN OVERLAY MIXTURE & PAVEMENT MARKINGS
0014-04-080IH 35WActualSep 2016$296,0751CABLE MEDIAN BARRIER INSTALLATION
0902-50-123CSActualFeb 2017$207,7938FY 17 FSP
0902-50-124CSActualFeb 2017$274,0578FY 17 FSP

Palo Pinto County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0007-08-028SH 16ActualJun 2017$302,1458MILLED EDGELINE & CENTERLINE RUMBLE STRIPS
2288-01-013FM 1821ActualMay 2017$1,493,2061BASE REPAIR AND HMAC OVERLAY
0250-02-050US 281ActualApr 2017$4,782,9916CLEAN AND PAINT STEEL TRUSS

Parker County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0008-03-089IH 20ActualAug 2017$4,831,1941REHABILITATE EXISTING FR RDS; CONVERT TO ONE WAY OPERATION;
1601-01-031FM 730ActualJul 2017$244,6831INSTALLATION OF TRAFFIC SIGNAL
0314-07-054IH 20ActualMay 2017$2,343,9951MILL AND OVERLAY
0314-07-052IH 20ActualJun 2017$32,478,4391RECONSTRUCT 2 LN BRIDGE TO 1 LN U-TURN BRIDGE, CONST 0 TO 4
0080-06-030US 377ActualApr 2017$8,650,7921MILL, BASE REPAIR, OVERLAY
0902-38-124VAActualMay 2017$959,9973CONSTRUCT 5 FT WIDE CONCRETE SIDEWALK ALONG WEST SIDE OF

Tarrant County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0902-00-185VAActualAug 2017$750,0007LAND USE/TRANS & BIKE/PED INIT INCL BIKE/PED PLANNING,
0902-90-066CSActualSep 2016$14,27110PERMANENT GUARDRAILS REPLACED AND SCOURED ASPHALT MILLED
0718-02-068FM 156ActualMar 2017$184,0851INSTALL TRAFFIC SIGNAL AND ADD LEFT TURN LANE
0902-48-576CSActualAug 2017$4,223,1903INTERSECTION IMPROVEMENTS
0094-02-123SH 10ActualMar 2017$4,159,7631MILL, BASE REPAIR, HMAC OVERLAY
0902-48-873VAActualApr 2017$4,011,7551DFW CONNECTOR COMPREHENSIVE MAINTENANCE AGREEMENT FY17
0902-90-072CSActualFeb 2017$288,2318FY 17 FSP
0902-00-195VAActualOct 2016$100,0003DEPARTMENTAL STREAMLINING POLICIES & PROCEDURES COORDINATION
0902-00-143VAActualOct 2016$1,753,4601CONCRETE PAVEMENT REPAIR, SPOT REPAIRS VARIOUS LOCATIONS
0902-48-722CSActualNov 2016$9,981,7203REPLACE EXISTING 2 LANE BRIDGE WITH NEW BRIDGE TO ACCOMMODAT
1330-03-003FM 1187ActualFeb 2017$614,2193LANDSCAPING ENHANCEMENT
0902-90-067CSActualNov 2016$2,350,6516REPLACE BRIDGES AND APPROACHES
0353-03-096SH 114ActualNov 2016$350,0003LANDSCAPE ENHANCEMENT
0902-90-048VAActualOct 2016$366,6721ITS EQUIPMENT UPGRADES FOR TECHNOLOGY ADVANCES
2208-01-068SS 303ActualOct 2016$550,0003LANDSCAPE ENHANCEMENT
0171-04-078SH 199ActualNov 2016$58,688,0861CONSTRUCT MAINLANES AND ENTRANCE/EXIT RAMPS FOR SH 199
0902-48-869VAActualOct 2016$2,621,7573CONSTRUCT BIKE/PED PATH FOR TRINITY TRAILS CLEAR FORT-EAST
0902-90-001VAActualOct 2016$2,088,7233CONSTRUCT 2 PEDESTRIAN AND BICYCLE CONNECTIONS TO TRINITY
1068-01-216IH 30ActualAug 2017$942,7156REPLACE BRIDGE DECK AND APPROACH SLABS
2374-05-081IH 20ActualAug 2017$1,037,7546REPLACE BRIDGE & APPROACH RAILING OR ADD SAFETY END
0902-90-059VAActualAug 2017$2,014,5007VANPOOL PROGRAM FY 17; OPER VANPOOL SUBSIDY INITIATIVE FOR
0902-90-030VAActualAug 2017$489,5153SIDEWALK ADDITION, CURB RAMPS
2266-02-146SH 360ActualAug 2017$302,5918INSTALL PROTECTION FOR RAILROAD BRIDGE COLUMN, DRAINAGE &
0172-09-033US 287ActualNov 2016$4,663,6803CONSTRUCTION OF RAMP MODIFICATIONS AND ADDITION OF U-TURN ON
1330-01-062FM 1187ActualMar 2017$6,421,8911MILL, HMAC OVERLAY & PAVEMENT MARKINGS
0902-00-135VAActualJan 2017$1,620,99710CONSTRUCT ADA CURB RAMPS AT VARIOUS LOCATIONS IN TARRANT COU
0902-00-155VAActualAug 2017$1,918,60810CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS ALONG BU 67,
1068-02-142IH 30ActualApr 2017$6,916,8881MILL, BASE REPAIR, SMA OVERLAY AND PAVEMENT MARKINGS
0902-00-171VAActualJul 2017$2,000,0003MANAGED LANE SYSTEM, IMPLEMENT TECHNOLOGY TO DETECT AUTO
0094-02-131SH 10ActualJan 2017$699,6158IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW
0094-02-121SH 183ActualAug 2017$3,359,7063CORRIDOR IMPRVMNTS AT 3 LOCATIONS, INCLUDING SIDEWALKS & C
0172-06-092US 287ApprovedAug 2017$857,7473INT IMPROV; UPGRADE TRAFFIC SIGNAL; VEHICLE & PED ILLUM &
0902-00-148VAActualJan 2017$1,512,3501NON-SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION
0353-03-099SH 114ApprovedAug 2017$1,819,2093LANDSCAPE ENHANCEMENT
0094-02-132SH 10ActualAug 2017$800,0003LANDSCAPE ENHANCEMENTS
0363-03-049SH 121ActualFeb 2017$4,334,2313REPLACE BRIDGE
0008-15-050IH 820ActualAug 2017$547,9667REPLACE ELECTRICAL CONDUCTORS AND CONDUIT FOR ROADWAY
0902-00-200VAActualJul 2017$905,0003REG. AERIAL PHOTO. DATA COL/PLANNING; IMPROVE TRAVEL DEMAND
0902-90-071VAActualAug 2017$3,202,9811ILLUMINATION REFURBISHMENT ON DFW CONNECTOR
0008-13-233IH 820ActualJan 2017$1,496,5701SHOULDER WIDENING & RESTRIPING OF SB IH820 TO ADD EXIT LANE
0902-00-183VAActualAug 2017$350,0003REVENUE & PROJECT TRACKING, SOFTWARE DEVELOPMENT, & FISCAL
0902-00-176VAActualFeb 2017$1,960,0003DEVELOP AND IMPLEMENT 511 TRAVELER INFORMATION SYSTEM
0902-00-158VAActualAug 2017$1,530,0007AQ PLNG, EVAL & DEV, DATA & FEASIBILITY ANALYSES,POL & BEST
0902-00-170VAActualAug 2017$3,750,0003CLEAN TECH REVOLVING LOAN, EST INNOV FIN TO OFFSET COST OF

Wise County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0134-07-070US 380ActualJul 2017$3,248,0376REPLACE BRIDGE DECK ON EB STRUCTURE
0013-06-045US 81ActualMay 2017$1,253,6281SAFETY LIGHTING, IMPROVE HORIZONTAL ALIGNMENT
0902-20-114VAActualApr 2017$212,5003CONSTRUCT SIDEWALK
1352-04-014FM 455ActualJul 2017$87,6828INSTALL INTERSECTION FLASHING BEACON
1310-03-026FM 2264ActualJul 2017$8,083,28611PROVIDE ADDITIONAL PAVED SURFACE WIDTH, PROPOSED 2-12' LANES
0134-07-073US 380ActualJul 2017$364,4411SAFETY LIGHTING


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract