Monthly State Let Construction Report For Paris District As Of Sep 10, 2024 Page 3 Of 5

Last Update: Tuesday, September 10, 2024
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyFRANKLIN
HighwayIH 30
FromAT CR 2080
To.
CSJ0610-02-065
Proj IDF 2B24(422)
Work TypeBRIDGE MAINTENANCE
 
0.140564885.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-14-24
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days61
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
THK CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0610-02-065
DUSTROL, INC. (1.54)
BARRICADES UNLIMITED (2.01)
WOLFE CONSTRUCTION GROUP, INCORPORATED (1.15)
MORRIS COUNTY CONTRACTORS, L.L.C. (4.10)
Contract #07243232
Totals564885.000.000.000.0

CountyFANNIN
HighwayFM 68
FromSH 78
ToFM 271
CSJ0620-01-018
Proj IDSTP 2024(080)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
4.2606203272.06995836.2516.0
Work Order11-16-23
Work Began07-25-24
Work Completed
Time Computed02-14-24
Contract Working Days247
Addl Days Granted0
Working Days Charged86
Percent Time Used34
Contractor(s)
D. L. LENNON INCORPORATED - CONTRACTOR
SUBCONTRACTOR(S) FOR CCSJ: 0620-01-018
BAHENA CONSTRUCTION CO.,INC. (12.18)
J. H. ODEN CONTRACTING COMPANY (1.56)
MOJICA CONSTRUCTION LLC (7.26)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.43)
PANOLA SIGN & BARRICADE, INC. (0.58)
STRIPING TECHNOLOGY, L.P. (2.06)
TEXANA LAND & ASPHALT, INC. (1.60)
WITHERS CONSTRUCTION, LLC (2.10)
Contract #10233211
Totals6203272.06956591.75995836.2516.0

CountyFANNIN
HighwayFM 68
FromAT NORTH SULPHUR RIVER
To.
CSJ0620-01-019
Proj IDBR 2B24(278)
Work TypeBRIDGE REPLACEMENT
 
0.2492823236.800.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-22-24
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days139
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
L & N BRIDGE, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0620-01-019
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #07243228
Totals2823236.800.000.000.0

CountyHOPKINS
HighwayFM 900
FromIH 30 SOUTH FRONTAGE ROAD
To0.28 MILE N OF FM 3019
CSJ0680-05-014
Proj IDSTP 2B23(053)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
4.5703356595.053287612.5597.9
Work Order09-06-23
Work Began10-05-23
Work Completed
Time Computed10-06-23
Contract Working Days223
Addl Days Granted0
Working Days Charged128
Percent Time Used57
Contractor(s)
A. K. GILLIS & SONS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0680-05-014
BAHENA CONSTRUCTION CO.,INC. (15.15)
CATOCON, INC. (5.95)
DUSTIN ALLEN, INC. (0.88)
MURRAY CONSTRUCTION (1.94)
PANOLA SIGN & BARRICADE, INC. (0.75)
STRIPING TECHNOLOGY, L.P. (5.12)
A-CORE CONCRETE CUTTING OF TEXAS, INC. (0.48)
Contract #08233032
Totals3356595.05268661.393287612.5597.9

CountyLAMAR
HighwayFM 1497
FromFM 1184
ToFM 3426
CSJ0688-03-028
Proj IDF 2023(861)
Work TypeREHABILITATION OF EXISTING ROAD
 
3.1963887746.793086877.9179.4
Work Order07-20-23
Work Began10-19-23
Work Completed
Time Computed10-18-23
Contract Working Days182
Addl Days Granted0
Working Days Charged160
Percent Time Used87
Contractor(s)
A. K. GILLIS & SONS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0688-03-028
CATOCON, INC. (2.57)
CHEROKEE SERVICES (0.13)
PANOLA SIGN & BARRICADE, INC. (0.78)
DUSTIN ALLEN, INC. (5.33)
SOUTHERN CROSS CONTRACTORS, LLC (1.21)
BAHENA CONSTRUCTION CO.,INC. (11.15)
STRIPING TECHNOLOGY, L.P. (3.20)
TEXOP CONSTRUCTION (0.20)
TEXANA LAND & ASPHALT, INC. (1.02)
Contract #06233022
Totals3887746.79378707.393086877.9179.4

CountyFANNIN
HighwayFM 271
FromSH 78
ToPR 24
CSJ0690-01-016
Proj IDF 2023(063)
Work TypeREHABILITATION OF EXISTING ROAD
 
1.9631811725.502016775.2199.9
CountyFANNIN
HighwayFM 271
FromPR 24
ToFM 68
CSJ0690-02-015
Proj IDF 2023(063)
Work TypeREHABILITATION OF EXISTING ROAD
 
7.0455271164.595201983.6998.6
Work Order10-06-22
Work Began12-01-22
Work Completed
Time Computed01-04-23
Contract Working Days367
Addl Days Granted0
Working Days Charged312
Percent Time Used85
Contractor(s)
D. L. LENNON INCORPORATED - CONTRACTOR
SUBCONTRACTOR(S) FOR CCSJ: 0690-01-016
PANOLA SIGN & BARRICADE, INC. (0.48)
J. H. ODEN CONTRACTING COMPANY (2.09)
BAHENA CONSTRUCTION CO.,INC. (6.63)
FARR FOUNDATION, INC. (0.96)
SOUTHERN CROSS CONTRACTORS, LLC (2.19)
TEXANA LAND & ASPHALT, INC. (4.65)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (0.72)
COLD CREEK CONSTRUCTION, LTD (2.59)
TRP CONSTRUCTION GROUP, LLC (1.89)
Contract #09223232
Totals7082890.0920960.497218758.9099.9

CountyGRAYSON
HighwayFM 121
FromVAN ALSTYNE
ToSH 160
CSJ0729-02-032
Proj IDF 2023(514)
Work TypeREHABILITATION OF EXISTING ROAD
 
10.73010767205.414975619.8946.2
Work Order04-26-23
Work Began07-28-23
Work Completed
Time Computed07-25-23
Contract Working Days477
Addl Days Granted0
Working Days Charged220
Percent Time Used46
Contractor(s)
D. L. LENNON INCORPORATED - CONTRACTOR
SUBCONTRACTOR(S) FOR CCSJ: 0729-02-032
BAHENA CONSTRUCTION CO.,INC. (14.11)
WITHERS CONSTRUCTION, LLC (1.97)
BARRICADES UNLIMITED (0.35)
FORTSON CONTRACTING, INC. (0.79)
J. H. ODEN CONTRACTING COMPANY (1.49)
TEX OP CONSTRUCTION, LP (0.16)
TRAFFIC HIGHWAY MAINTENANCE, LLC (3.39)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY (4.82)
MOJICA CONSTRUCTION LLC (0.53)
Contract #03233212
Totals10767205.41370567.044975619.8946.2

CountyHOPKINS
HighwayFM 2653
FromAT IH 30
To.
CSJ0735-05-024
Proj IDBR 2024(975)
Work TypeBRIDGE MAINTENANCE
 
350190.320.000.0
CountyHUNT
HighwaySH 24
FromSH 24 / 50 NB
ToAT L&A RAILROAD
CSJ2321-01-019
Proj IDBR 2024(975)
Work TypeBRIDGE MAINTENANCE
 
193637.150.000.0
CountyHUNT
HighwaySH 24
FromSH 24 / 50 SB
ToAT L&A RAILROAD
CSJ2321-01-020
Proj IDBR 2024(975)
Work TypeBRIDGE MAINTENANCE
 
192535.150.000.0
CountyHOPKINS
HighwayFM 2653
FromAT IH 30
To.
CSJ2538-01-017
Proj IDBR 2024(974)
Work TypeBRIDGE MAINTENANCE
 
259490.200.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-14-24
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days77
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0735-05-024
FLEX SUPPLY, LLC (1.55)
PENHALL COMPANY (1.00)
S & S BRIDGE PAINTING, INC. (3.54)
TEXOP CONSTRUCTION (2.39)
Contract #05243040
Totals995852.820.000.000.0

CountyFANNIN
HighwayFM 274
FromFM 1753
ToFM 3321
CSJ0765-02-022
Proj IDC 765-2-22
Work TypeREHABILITATION OF EXISTING ROAD
 
4.8086871272.41607390.008.8
CountyFANNIN
HighwayFM 274
FromFM 3321
ToSH 78
CSJ1880-01-007
Proj IDC 188-1-7
Work TypeREHABILITATION OF EXISTING ROAD
 
5.0197591966.87360980.004.7
CountyFANNIN
HighwayFM 274
FromFM 274
ToAT SANDY CREEK
CSJ1880-01-008
Proj IDBR 2024(385)
Work TypeBRIDGE REPLACEMENT
 
3768368.131619800.0042.9
CountyFANNIN
HighwayFM 274
FromFM 274
ToAT COTTONWOOD CREEK
CSJ1880-01-009
Proj IDBR 2024(385)
Work TypeBRIDGE REPLACEMENT
 
1587659.951164931.7073.3
Work Order12-13-23
Work Began03-18-24
Work Completed
Time Computed03-12-24
Contract Working Days366
Addl Days Granted0
Working Days Charged83
Percent Time Used22
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0765-02-022
DIAMOND ELITE BARRICADES, LLC (0.15)
A. E. MOORE CONSTRUCTION, INC. (1.12)
PENHALL COMPANY (0.03)
RICHARD DRAKE CONSTRUCTION COMPANY, L.P. (19.92)
STRIPING TECHNOLOGY, L.P. (1.08)
WEST TEXAS ROCK RESOURCES, LLC (0.08)
WITHERS CONSTRUCTION, LLC (2.16)
A. K. GILLIS & SONS, LLC (0.00)
Contract #11233012
Totals19819267.36916230.503753101.7018.9

CountyHUNT
HighwaySH 11
FromCULVER ST.
ToLIVE OAK ST.
CSJ0768-01-057
Proj IDF 2023(515)
Work TypeINTERSECTION & OPERATIONAL IMPRV
 
0.6394510635.844080424.8890.7
Work Order04-19-23
Work Began07-18-23
Work Completed
Time Computed07-18-23
Contract Working Days136
Addl Days Granted0
Working Days Charged152
Percent Time Used111
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0768-01-057
A. E. MOORE CONSTRUCTION, INC. (3.96)
RICHARD DRAKE CONSTRUCTION COMPANY, L.P. (18.60)
TEX OP CONSTRUCTION, LP (1.57)
TRAFFIC HIGHWAY MAINTENANCE, LLC (2.27)
KING GEORGE TRAFFIC SOLUTIONS LLC (0.25)
NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION (21.54)
Contract #03233009
Totals4510635.84161121.254080424.8890.7

CountyLAMAR
HighwayVA
FromVARIOUS LOCATIONS
To.
CSJ0901-00-063
Proj IDF 2024(182)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
3141295.362756547.6087.7
Work Order12-21-23
Work Began03-18-24
Work Completed
Time Computed01-22-24
Contract Working Days101
Addl Days Granted0
Working Days Charged63
Percent Time Used62
Contractor(s)
TRP CONSTRUCTION GROUP, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-00-063
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #11233212
Totals3141295.362950.002756547.6087.7

CountyGRAYSON
HighwayVA
FromWITHIN EISENHOWER STATE PARK
To.
CSJ0901-19-176
Proj IDC 901-19-176
Work TypeOVERLAY
 
2.2404478108.304195616.5994.0
Work Order02-14-23
Work Began04-04-23
Work Completed
Time Computed03-15-23
Contract Working Days176
Addl Days Granted0
Working Days Charged195
Percent Time Used110
Contractor(s)
FNH CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-19-176
STRIPING TECHNOLOGY, L.P. (0.85)
GUARDRAIL SAFETY SERVICES, LLC (1.27)
DIIBS SPECIALISTS, LLC (1.23)
Contract #01233016
Totals4478108.300.004195616.5994.0

CountyGRAYSON
HighwayVA
FromWITHIN LAKE TEXOMA FISHERIES LAB
To.
CSJ0901-19-177
Proj IDC 901-19-177
Work TypeREHABILITATION OF EXISTING ROAD
 
0.540194453.970.000.0
CountyFANNIN
HighwayVA
FromWITHIN BONHAM STATE PARK
To.
CSJ0901-32-083
Proj IDC 901-32-83
Work TypeREHABILITATION OF EXISTING ROAD
 
1.5701641313.120.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days57
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
C. E. BARKER, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0901-19-177
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #09243228
Totals1835767.090.000.000.0

CountyGRAYSON
HighwayCR
FromAT ELBA CREEK
To.
CSJ0901-19-204
Proj IDBR 2022(464)
Work TypeBRIDGE REPLACEMENT
 
0.070619186.0077600.0012.5
CountyFANNIN
HighwayCR
FromAT CANEY CREEK
To.
CSJ0901-32-112
Proj IDBR 2023(644)
Work TypeBRIDGE REPLACEMENT
 
0.090469235.0029516.006.2
CountyFANNIN
HighwayCR
FromAT TRIBUTARY OF BRUSHY CREEK
To.
CSJ0901-32-115
Proj IDBR 2023(645)
Work TypeBRIDGE REPLACEMENT
 
0.066502287.540.000.0
Work Order03-21-24
Work Began07-09-24
Work Completed
Time Computed04-22-24
Contract Working Days196
Addl Days Granted0
Working Days Charged46
Percent Time Used23
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-19-204
SOUTHERN CROSS CONTRACTORS, LLC (6.17)
DIAMOND ELITE BARRICADES, LLC (0.97)
Contract #02243034
Totals1590708.54103916.00107116.006.7

CountyGRAYSON
HighwayVA
FromVARIOUS LOCATIONS ON US 75
To.
CSJ0901-19-208
Proj IDF 2024(384)
Work TypeOVERLAY
 
25.5731696572.001665344.8898.1
Work Order12-13-23
Work Began04-11-24
Work Completed
Time Computed03-12-24
Contract Working Days96
Addl Days Granted0
Working Days Charged89
Percent Time Used92
Contractor(s)
STX CIVIL
SUBCONTRACTOR(S) FOR CCSJ: 0901-19-208
KING GEORGE TRAFFIC SOLUTIONS LLC (1.28)
Contract #11233215
Totals1696572.00221383.101665344.8898.1

CountyGRAYSON
HighwayVA
FromVARIOUS LOCATIONS
To.
CSJ0901-19-226
Proj IDC 901-19-226
Work TypeOVERLAY
 
363240.0089760.0024.7
Work Order07-10-24
Work Began08-14-24
Work Completed
Time Computed08-09-24
Contract Working Days103
Addl Days Granted0
Working Days Charged15
Percent Time Used14
Contractor(s)
GARRET SHIELDS INFRASTRUCTURE
SUBCONTRACTOR(S) FOR CCSJ: 0901-19-226
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #12233221
Totals363240.0089760.0089760.0024.7

CountyGRAYSON
HighwayVA
FromVARIOUS LOCATIONS
To.
CSJ0901-19-227
Proj IDC 901-19-227
Work TypeBRIDGE MAINTENANCE
 
851850.00645340.0075.7
Work Order02-05-24
Work Began03-11-24
Work Completed
Time Computed03-06-24
Contract Working Days53
Addl Days Granted0
Working Days Charged43
Percent Time Used81
Contractor(s)
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0901-19-227
FC TRAFFIC CONTROL, INC. (2.83)
S & S BRIDGE PAINTING, INC. (44.77)
STRUCTURAL INTEGRITY GROUP LLC (20.27)
Contract #12233023
Totals851850.003500.00645340.0075.7

CountyGRAYSON
HighwayVA
FromVARIOUS LOCATIONS
To.
CSJ0901-19-228
Proj IDC 901-19-228
Work TypeBRIDGE MAINTENANCE
 
1799705.00398348.3322.1
Work Order05-08-24
Work Began06-04-24
Work Completed
Time Computed06-07-24
Contract Working Days213
Addl Days Granted0
Working Days Charged45
Percent Time Used21
Contractor(s)
DCC CONSTRUCTION AND SERVICES, L.L.C.
SUBCONTRACTOR(S) FOR CCSJ: 0901-19-228
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #04243234
Totals1799705.0062710.98398348.3322.1

CountyHUNT
HighwayCR
FromCR 2132
ToAT EAST CADDO CREEK BRANCH
CSJ0901-22-117
Proj IDBR 2021(523)
Work TypeBRIDGE REPLACEMENT
 
0.056400981.60374186.4193.3
CountyHUNT
HighwayCR
FromCR 2132
ToAT EAST CADDO CREEK
CSJ0901-22-118
Proj IDBR 2021(523)
Work TypeBRIDGE REPLACEMENT
 
0.110288589.42268698.0893.1
CountyHUNT
HighwayCR
FromCR 1031
ToAT HICKORY CREEK TRIBUTARY
CSJ0901-22-119
Proj IDBR 2B20(079)
Work TypeBRIDGE REPLACEMENT
 
0.093336890.66352091.6699.9
CountyHUNT
HighwayCR
FromCR 1032
ToAT HICKORY CREEK TRIBUTARY
CSJ0901-22-120
Proj IDBR 2021(201)
Work TypeBRIDGE REPLACEMENT
 
0.070321874.78248027.2977.0
Work Order02-16-22
Work Began05-23-22
Work Completed
Time Computed05-17-22
Contract Working Days229
Addl Days Granted0
Working Days Charged221
Percent Time Used96
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-22-117
FLEX SUPPLY, LLC (1.60)
DUSTIN ALLEN, INC. (7.31)
A. E. MOORE CONSTRUCTION, INC. (4.69)
Contract #01223223
Totals1348336.469000.001243003.4492.1

CountyHUNT
HighwayCS
FromSHELBY AVE
ToAT FARBER CREEK BRANCH
CSJ0901-22-122
Proj IDBR 2023(660)
Work TypeBRIDGE REPLACEMENT
 
0.058458519.54436679.8495.2
CountyLAMAR
HighwayCR
FromLAMAR CR 28100
ToAT BLEDSOE CREEK
CSJ0901-29-097
Proj IDBR 2023(659)
Work TypeBRIDGE REPLACEMENT
 
0.075622448.77601040.1296.5
Work Order07-26-23
Work Began08-30-23
Work Completed
Time Computed08-22-23
Contract Working Days207
Addl Days Granted0
Working Days Charged125
Percent Time Used60
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-22-122
TRAFFIC HIGHWAY MAINTENANCE, LLC (0.51)
Contract #06233635
Totals1080968.317000.001037719.9695.9

page 1 | page 2 | page 3 | page 4 | page 5