SH 5 from FM 2786 (Stacy Road) to south of FM 1378 (Country Club Road)
Skip to main content

SH 5 from FM 2786 (Stacy Road) to south of FM 1378 (Country Club Road)

Virtual public hearing with in-person option

The public hearing is cancelled and will be rescheduled at a later date. Virtual: Thursday, March 23, 2023 at 5:30 p.m. through Friday, April 7, 2023 at 11:59 p.m.

The public hearing is cancelled and will be rescheduled at a later date. In-person: Thursday, March 23, 2023, 5:30 - 7:30 p.m.

Public comment deadline All comments must be received on or before Friday, April 7, 2023.
Virtual details

The virtual public hearing will be posted on Thursday, March 23, 2023, at 5:30 p.m. through Friday, April 7, 2023. Please note, this is not a live event. The materials can be viewed at your convenience.

Additionally, TxDOT is providing an in-person hearing option for individuals who would like to participate in person instead of online. In-person attendees will be able to review the same materials and presentation as the online public hearing.

In-person details Thursday, March 23, 2023
5:30 - 7:30 p.m.
Courtyard Marriott
Watters Ballroom
210 Stacy Road
Allen, TX 75002
*Open House
Purpose TxDOT is proposing to widen SH 5 from FM 2786 (Stacy Road) to south of FM 1378 (Country Club Road) in Collin County, Texas.
Description

The proposed project would consist of the reconstruction and widening of SH 5 from FM 2786 (Stacy Road) to south of FM 1378 (Country Club Road) within the town of Fairview in Collin County, Texas, and is approximately 1.99 miles in length.

The proposed project would reconstruct and widen existing SH 5 from a two-lane rural roadway to a four-lane urban divided curbed roadway (6-lane ultimate) from FM 2786 (Stacy Road) to Indian Springs Road and a four-lane divided curbed roadway from Indian Springs Road to south of FM 1378 (Country Club Road). The existing right-of-way width varies from 66 feet to 193 feet.

The proposed improvements would include:

  • Curb and gutter
  • Bicycle and pedestrian shared-use paths on both sides of the roadway,
  • Intersection improvements
  • Left-turn and right-turn lanes at designated locations

The proposed right-of-way width would vary from 116 feet to 193 feet. The proposed project would, subject to final design considerations, require additional right of way.

The proposed project is anticipated to impact the following properties protected under Section 4(f) of the Department of Transportation Act of 1966: Town of Fairview’s Meadows Park. This recreational area is designated public property also subject to Chapter 26 of the Texas Parks and Wildlife Code. The proposed project would result in the acquisition of approximately 0.2 acres of additional right of way of park land for the construction of additional travel lanes and the construction of the shared-used path. TxDOT anticipates making a de minimis determination for this use under Section 4(f) of the Department of Transportation Act of 1966. Public comment on the effects of the proposed project on the activities, features or attributes of the Meadows Park and the greenspace may be submitted as described below.

The proposed project would involve construction in wetlands. The proposed project would involve an action in a floodplain.

Accessibility

The public hearing will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public hearing or in-person option, please contact the Dallas District Public Information Office at (214) 320-4480 no later than 4 p.m., Friday, March 17, 2023. Please be aware that advance notice is required as some services and accommodations may require time for the TxDOT to arrange.

Hearing materials
How to make a comment

Comments must be postmarked or otherwise received by Friday, April 7, 2023 to: TxDOT Dallas District Office, Attn: Kibru Andargie, P.E., 4777 East U.S. Highway 80, Mesquite, Texas 75150; by email as described in the notice.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT.

Posted: Feb. 14, 2023