AVERAGE LOW BID UNIT PRICE - MAINTENANCE - WICHITA FALLS DISTRICT

Last Update: Monday, May 2, 2016
ITEMS 401 6001 TO 496 6007
Items Items Bid Code Range
0100 - 0168
0247 - 0275
0316 - 0361
0401 - 0496
0500 - 0544
0644 - 0672
0730 - 0788
4002 - 4429
6001 - 6834
401 6001 - 496 6007
Item No Description Units April 30, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
401 6001 FLOWABLE BACKFILL CY     8.000 400.00000 1
402 6001 TRENCH EXCAVATION PROTECTION LF 78.000 60.00000 78.000 60.00000 1
403 6001 TEMPORARY SPL SHORING SF 252.000 25.00000 540.000 20.73333 2
409 6002 PRESTR CONC PIL (18 IN SQ) LF     858.000 215.00000 1
420 2016 CL C CONC (COLLAR) EA     1.000 2,500.00000 1
420 6009 CL A CONC (COLLAR) EA 4.000 800.00000 4.000 800.00000 1
420 6013 CL C CONC (ABUT) CY     37.500 875.00000 1
420 6074 CL C CONC (MISC) CY     5.000 800.00000 1
422 6001 REINF CONC SLAB SF     2,550.000 22.50000 1
422 6015 APPROACH SLAB CY     60.000 450.00000 1
425 6036 PRESTR CONC GIRDER (TX34) LF     340.000 204.00000 1
429 2008 CNC STR REP (VERTICAL OR OVERHEAD) SF     1,848.000 72.00000 1
429 2009 CNC STR REP (BRDG DECK) (PARTIAL DEPTH) SF     1,340.000 48.00000 1
429 2010 CNC STR REP (BRDG DECK) (FULL DEPTH) SF     5.000 200.00000 1
429 6002 CONC STR REPAIR (EPOXY MORTAR) SF     468.000 40.00000 1
429 6003 CONC STR REPAIR (DECK REP (PART DEPTH) ) SF     816.000 50.00000 1
429 6005 CONC STR REPAIR (DECK REP (FULL DEPTH) ) SF     3.000 200.00000 1
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF     377.000 70.00000 1
429 6011 CONC STR REPR (REMOV AND REPL WINGWALL) CY     21.000 1,700.00000 1
432 2001 RIPRAP (CONC) (4 IN) CY     24.000 550.00000 1
432 2021 RIPRAP (STONE PROTECTION) (18 IN) CY     1,165.000 85.00000 1
432 6001 RIPRAP (CONC) (4 IN) CY     63.000 344.44444 2
432 6033 RIPRAP (STONE PROTECTION) (18 IN) CY     906.000 400.00000 1
432 6044 RIPRAP (CONC) (FLUME) CY     12.000 750.00000 1
432 6045 RIPRAP (MOW STRIP) (4 IN) CY     96.000 500.00000 1
432 6046 RIPRAP (MOW STRIP) (5 IN) CY     40.000 300.00000 1
432 6051 RIPRAP (STONE COMMON) (GROUT) (18 IN) CY     493.000 95.00000 1
438 2002 CLEAN AND SEAL EXIST JOINTS LF     200.000 25.00000 1
438 6001 CLEANING AND SEALING EXISTING JOINTS LF     408.000 40.00000 1
439 6013 MULTI - LAYER POLYMER OVERLAY SY     831.000 40.00000 1
450 2179 RAIL (SPECIAL RAIL 1) LF     100.000 110.00000 1
450 2180 RAIL (SPECIAL RAIL 2) LF     16.000 110.00000 1
450 6006 RAIL (TY T223) LF     206.000 115.00000 1
451 6004 RETROFIT RAIL (TY T131RC) LF     110.000 160.00000 1
454 6004 ARMOR JOINT (SEALED) LF     56.000 52.00000 1
460 6007 CMP (GAL STL 48 IN) LF 276.000 375.00000 276.000 375.00000 1
466 6136 HEADWALL (CH - PW - S) (DIA= 48 IN) EA 2.000 12,000.00000 2.000 12,000.00000 1
496 6007 REMOV STR (PIPE) LF 192.000 6.00000 412.000 14.54369 2