| Item No |
Description |
Units |
Septembe 30, 2009 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 500 2001 |
MOBILIZATION |
LS |
|
|
6.000 |
14,333.33333 |
6 |
| 502 2001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING |
MO |
|
|
24.000 |
2,515.62500 |
8 |
| 506 2034 |
TEMPORARY SEDIMENT CONTROL FENCE |
LF |
|
|
1,012.000 |
2.79743 |
3 |
| 512 2011 |
PORT CTB (DES SOURCE) (SAFETY SH) (TY 2) |
LF |
|
|
960.000 |
12.50000 |
1 |
| 512 2020 |
PORT CTB (MOVE) (SAFETY SH) (TY 2) |
LF |
|
|
960.000 |
8.00000 |
1 |
| 512 2029 |
PORT CTB (STKPL) (SAFETY SH) (TY 2) |
LF |
|
|
960.000 |
10.00000 |
1 |
| 529 2003 |
CONC CURB & GUTTER (TY I) |
LF |
|
|
258.000 |
27.50000 |
1 |
| 540 2001 |
MTL W - BEAM GD FEN (TIM POST) |
LF |
|
|
8,050.000 |
10.62000 |
1 |
| 540 2005 |
TERMINAL ANCHOR SECTION |
EA |
|
|
11.000 |
400.00000 |
1 |
| 540 2011 |
MTL BEAM GD FEN TRANS (THRIE - BEAM) |
EA |
|
|
14.000 |
1,346.00000 |
1 |
| 540 2012 |
MTL BEAM GD FEN TRANS (TL2) |
EA |
|
|
20.000 |
400.00000 |
1 |
| 540 2015 |
MTL W - BEAM GD FEN (TIM POST) RADIUS RAIL |
LF |
|
|
25.000 |
12.35000 |
1 |
| 542 2001 |
REMOVING METAL BEAM GUARD FENCE |
LF |
|
|
12,025.000 |
1.00000 |
1 |
| 542 2002 |
REMOVING TERMINAL ANCHOR SECTION |
EA |
|
|
22.000 |
75.00000 |
1 |
| 544 2001 |
GUARDRAIL END TREATMENT (INSTALL) |
EA |
|
|
18.000 |
1,700.00000 |
1 |
| 545 2004 |
CRASH CUSH ATTEN (INSTL) (FASTRACC) |
EA |
|
|
1.000 |
10,000.00000 |
1 |
| 545 2005 |
CRASH CUSH ATTEN (MOVE & RESET) (FASTRACC |
EA |
|
|
1.000 |
2,500.00000 |
1 |
| 545 2006 |
CRASH CUSH ATTEN (REMOVE) (FASTRACC) |
EA |
|
|
1.000 |
1,000.00000 |
1 |