AVERAGE LOW BID UNIT PRICE - MAINTENANCE - WICHITA FALLS DISTRICT

Last Update: Monday, April 4, 2016
ITEMS 730 6001 TO 788 6001
Items Items Bid Code Range
0100 - 0168
0247 - 0260
0316 - 0361
0401 - 0496
0500 - 0544
0644 - 0672
0730 - 0788
4002 - 4429
6001 - 6834
730 6001 - 788 6001
Item No Description Units March 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
730 6001 STRIP MOWING AC     12,064.900 28.71688 11
730 6002 FULL - WIDTH MOWING AC     50,110.000 28.30611 11
735 6002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI     9,894.720 106.17275 3
735 6007 DEBRIS REMOVAL (SPOT DEBRIS) MI     81.000 87.00000 3
738 6002 CLEANING / SWEEPING (CENTER MEDIAN) MI     276.000 350.00000 1
738 6004 CLEANING / SWEEPING (OUTSIDE MAIN LANE MI     323.200 350.00000 1
738 6006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     175.200 350.00000 1
738 6008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP MI     31.200 350.00000 1
738 6009 CLEANING / SWEEPING (AGGREGATE REMOVAL MI     100.000 100.00000 1
738 6010 CLEANING / SWEEPING (SPOT) MI     100.000 100.00000 1
752 6005 TREE REMOVAL (4" - 12" DIA) EA     720.000 164.92800 1
752 6006 TREE REMOVAL (12" - 18" DIA) EA     166.000 278.67398 1
752 6007 TREE REMOVAL (18" - 24" DIA) EA     54.000 338.51185 1
752 6008 TREE REMOVAL (24" - 30" DIA) EA     37.000 477.32000 1
752 6009 TREE REMOVAL (30" - 36" DIA) EA     12.000 377.22750 1
752 6010 TREE REMOVAL (36" - 42" DIA) EA     10.000 595.00000 1
752 6011 TREE REMOVAL (42" - 48" DIA) EA     7.000 895.00000 1
752 6012 TREE REMOVAL (48" - 60" DIA) EA     5.000 960.78800 1
752 6013 TREE REMOVAL (60" - 72" DIA) EA     5.000 655.14400 1
752 6019 TREE REMOVAL (72" - 84" DIA) EA     1.000 900.00000 1
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF     20,000.000 12.00000 2
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF     400.000 16.00000 2
770 6010 REM / REPL TIMBER / STL POST W / O CONC FN EA     1,000.000 40.00000 2
770 6011 REM / REPL TIMBER / STL POST W / CONC FN EA     450.000 45.00000 2
770 6017 REALIGN POSTS EA     400.000 20.00000 2
770 6018 INSTALL BLOCKOUT (TYPE SPECIFIED) EA     500.000 10.00000 2
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     4,000.000 12.00000 2
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA     400.000 90.00000 2
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA     40.000 2,050.00000 2
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     40.000 700.00000 2
770 6029 REM & RESET SGT IMPACT HEAD EA     40.000 100.00000 2
771 6001 REPLACE POSTS (TL - 3) EA     2,200.000 89.00000 1
771 6003 CABLE SPLICE / TURNBUCKLE (TL - 3) EA     20.000 100.00000 1
771 6005 REPAIR CONCRETE FOUNDATION (TL - 3) EA     50.000 30.00000 1
771 6007 REPR OR REPLC CABLE BARR TERM SEC (TL - 3 EA     30.000 400.00000 1
771 6009 REPLACE CABLE (TL - 3) LF     100.000 1.00000 1
776 6041 REPAIR (STEEL RAIL) LF     5.000 160.00000 1
778 6001 CONCRETE RAIL REPAIR (IN - KIND) LF     85.000 300.00000 1
788 6001 CONCRETE BEAM REPAIR EA     20.000 4,000.00000 1