AVERAGE LOW BID UNIT PRICE - MAINTENANCE - WICHITA FALLS DISTRICT

Last Update: Thursday, July 24, 2014
ITEMS 712 2004 TO 770 2035
Items Items Bid Code Range
0104 - 0132
0351 - 0361
0420 - 0452
0500 - 0540
0662 - 0677
0712 - 0770
3268 - 3276
4429 - 4429
6834 - 6834
7224 - 7224
712 2004 - 770 2035
Item No Description Units June 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2004 JT / CRCK SEAL (RUBBER - ASPHALT) LF     35,000.000 0.25000 1
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,029.500 498.51915 3
730 2001 STRIP MOWING AC     1,941.180 24.31763 4
730 2002 FULL - WIDTH MOWING AC     36,226.690 22.97402 8
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI     50.000 10.00000 1
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI     803.100 162.61412 2
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI     910.500 165.00692 2
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     575.400 151.01668 2
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI     53.700 166.02235 2
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     120.000 62.50000 2
738 2010 CLEANING / SWEEPING (SPOT) MI     75.000 70.00000 2
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     13,000.000 12.00000 1
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     1,200.000 10.00000 1
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     400.000 30.00000 1
770 2006 REALIGN POSTS EA     250.000 10.64000 1
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     30.000 1,500.00000 1
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     100.000 650.00000 1
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     8,000.000 18.00000 1
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     1,000.000 10.00000 1
770 2033 INSTALL BLOCKOUT EA     400.000 8.00000 1
770 2034 REMOVE AND RESET SGT IMPACT HEAD EA     50.000 300.00000 1
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     300.000 20.00000 1