AVERAGE LOW BID UNIT PRICE - MAINTENANCE - WICHITA FALLS DISTRICT

Last Update: Thursday, March 20, 2014
ITEMS 712 2004 TO 788 2002
Items Items Bid Code Range
0104 - 0134
0351 - 0361
0401 - 0454
0500 - 0544
0610 - 0686
0712 - 0788
3224 - 3276
4159 - 4159
6834 - 6834
7224 - 7224
712 2004 - 788 2002
Item No Description Units February 28, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2004 JT / CRCK SEAL (RUBBER - ASPHALT) LF     70,000.000 0.25000 2
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,254.500 489.81703 4
730 2001 STRIP MOWING AC 1,941.180 24.31763 4,146.360 21.85307 9
730 2002 FULL - WIDTH MOWING AC 31,216.690 23.05170 78,738.380 21.19359 18
735 2002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI     1,761.360 100.00000 1
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI     77.000 24.02597 2
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI     803.100 162.61412 2
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI     910.500 165.00692 2
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     575.400 151.01668 2
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI     53.700 166.02235 2
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     120.000 62.50000 2
738 2010 CLEANING / SWEEPING (SPOT) MI     75.000 70.00000 2
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     26,000.000 12.00000 2
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     2,400.000 10.00000 2
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     800.000 30.00000 2
770 2006 REALIGN POSTS EA     500.000 10.64000 2
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     60.000 1,500.00000 2
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     200.000 650.00000 2
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     16,000.000 18.00000 2
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     2,000.000 10.00000 2
770 2033 INSTALL BLOCKOUT EA     800.000 8.00000 2
770 2034 REMOVE AND RESET SGT IMPACT HEAD EA     100.000 300.00000 2
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     600.000 20.00000 2
780 2001 EPOXY INJECTION (TY IX) LF     26.000 75.00000 1
788 2001 CONCRETE BEAM REPAIR EA     6.000 2,600.00000 1
788 2002 CONCRETE BEAM REPAIR (CFRP) EA     2.000 11,000.00000 1