AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - PARIS DISTRICT

Last Update: Monday, March 31, 2014
ITEMS 500 2001 TO 560 2024
Items Items Bid Code Range
0100 - 0168
0216 - 0292
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0687
1122 - 1122
3127 - 3268
5261 - 5261
6006 - 6834
8251 - 8835
500 2001 - 560 2024
Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 1.000 297,729.45000 29.000 230,729.55897 29
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 1,636.74000 314.000 2,098.58344 29
508 2002 CONSTRUCTING DETOURS SY     13,625.000 49.56150 3
508 2003 CONSTRUCTING DETOURS EA     5.000 178,000.00000 2
512 2001 PORT CTB (FUR & INST) (SAFETY SH) (TY 1) LF     1,902.000 54.00000 1
512 2010 PORT CTB (DES SOURCE) (SAFETY SH) (TY 1) LF     19,050.000 5.00000 2
512 2013 PORT CTB (DES SOURCE) (SNGL SLP) (TY 1) LF     600.000 8.00000 1
512 2019 PORT CTB (MOVE) (SAFETY SH) (TY 1) LF     33,002.000 3.20856 3
512 2028 PORT CTB (STKPL) (SAFETY SH) (TY 1) LF     25,110.000 4.50968 2
512 2031 PORT CTB (STKPL) (SNGL SLP) (TY 1) LF     600.000 8.00000 1
512 2037 PORT CTB (REMOVE) (SAFETY SH) (TY 1) LF     1,902.000 5.00000 1
514 2004 PERM CONC TRF BARR (SGL SLP) (TY 1) (42" LF     7,244.000 48.58504 3
514 2006 PERM CONC TRF BARR (SGL SLP) (TY 3) (42" LF     220.000 152.04545 2
514 2022 PERM CONC TRF BARR (SGL SLP) (TY 4) (42" LF     284.000 120.00000 1
528 2002 COLORED TEXTURED CONC (6") SY     2,266.000 68.00000 1
529 2004 CONC CURB & GUTTER (TY II) LF     1,494.000 16.75000 1
529 2006 CONC CURB (MONO) (TY II) LF     9,316.000 3.06089 3
530 2002 INTERSECTIONS (ACP) EA     2.000 7,232.19000 1
530 2004 INTERSECTIONS (CONC) SY     512.000 36.95000 2
530 2005 INTERSECTIONS (ACP) SY 594.000 24.68000 594.000 24.68000 1
530 2006 INTERSECTIONS (SURF TREAT) SY     2,942.000 15.14792 5
530 2007 DRIVEWAYS (CONC) EA     10.000 3,650.00000 2
530 2008 DRIVEWAYS (ACP) EA     100.000 2,567.79000 4
530 2009 DRIVEWAYS (SURF TREAT) EA     4.000 1,850.00000 2
530 2010 DRIVEWAYS (CONC) SY 185.000 91.80000 1,384.000 63.12717 10
530 2011 DRIVEWAYS (ACP) SY 1,646.000 24.68000 26,328.000 25.54960 10
530 2012 DRIVEWAYS (SURF TREAT) SY 1,722.000 24.67000 5,719.000 21.37106 9
530 2014 TURNOUTS (ACP) EA     8.000 2,250.00000 1
530 2015 TURNOUTS (SURF TREAT) EA     108.000 959.06954 5
530 2017 TURNOUTS (ACP) SY 49.000 83.65000 49.000 83.65000 1
530 2018 TURNOUTS (SURF TREAT) SY     3,785.000 24.47824 6
530 2075 DRIVEWAYS (GRAVEL) SY     1,097.000 14.15223 2
531 2003 CONC SIDEWALKS (5') (6") LF     1,175.000 22.00000 1
531 2005 CURB RAMPS (TY 1) EA     6.000 1,050.00000 1
531 2009 CURB RAMPS (TY 6) EA     2.000 1,050.00000 1
531 2013 CURB RAMPS (TY 20) EA     1.000 1,500.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     469,989.360 .11873 2
533 2007 SHOULDER TEXTURING (MILLED) (CONCRETE) LF     23,975.000 .35000 1
536 2002 CONC MEDIAN SY     2,338.600 62.50000 2
538 2001 RIGHT OF WAY MARKERS EA     91.000 150.00000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF 300.000 16.47000 11,184.500 15.84968 13
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     325.000 17.88923 2
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 4.000 1,404.00000 76.000 1,285.17105 7
540 2012 MTL BEAM GD FEN TRANS (TL2) EA     25.000 852.48000 3
540 2014 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     150.000 39.83333 2
540 2015 MTL W - BEAM GD FEN (TIM POST) RADIUS RAIL LF     63.000 30.00000 2
540 2025 TERMINAL ANCHOR SECTION (DRWY) (SPCL) EA     2.000 800.00000 2
540 2034 MTL W - BEAM GD FEN (SPECIAL) LF     100.000 19.00000 1
540 2036 DRIVEWAY TERMINAL ANCHOR SECTION EA     2.000 750.00000 2
540 2037 MTL W - BEAM GD FEN (CRT POST) (SHRT RAD LF     30.000 28.33333 2
540 2040 MTL BEAM GD FEN TRANS (THRIE - BEAM) (OPT2 EA     1.000 1,170.00000 1
540 2043 MTL BEAM FD FEN TRANS (TL2) (OPT2) EA     1.000 700.00000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     34.000 846.94118 5
540 2045 MTL BM GD FEN (LONG SPAN SYSTEM) LF     100.000 20.00000 2
540 2046 MTL BM GD FEN TRANS (NON - SYM) EA     17.000 741.17647 2
540 2049 MTL BEAM GD FEN (TIM POST) W / MOW STRIP LF     25.000 35.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF 450.000 2.16000 12,303.000 1.57797 12
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     56.000 110.89286 8
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA     6.000 121.66667 2
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 2,025.00000 131.000 1,873.58779 14
544 2002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     16.000 1,062.50000 4
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 189.00000 50.000 167.62000 7
544 2019 GUARDRAIL END TREATMENT (INSTALL) (OPT2) EA     1.000 1,700.00000 1
545 2002 CRASH CUSH ATTEN (MOVE & RESET) EA     8.000 4,100.00000 1
545 2005 CRASH CUSH ATTEN (MOVE & RESET) (FASTRACC EA     4.000 1,500.00000 2
545 2006 CRASH CUSH ATTEN (REMOVE) (FASTRACC) EA     2.000 800.00000 1
545 2007 CRASH CUSH ATTEN (INSTL) (TRACC) EA     1.000 1,750.00000 1
545 2009 CRASH CUSH ATTEN (REMOVE) (TRACC) EA     1.000 500.00000 1
545 2049 CRASH CUSH ATTEN (INSTL) (WORK ZONE) EA     4.000 9,000.00000 1
545 2050 CRASH CUSH ATTEN (MOV & RESET) (WORK ZONE) EA     4.000 1,000.00000 1
545 2051 CRASH CUSH ATTEN (REMOVE) (WORK ZONE) EA     4.000 600.00000 1
545 2089 CRASH CUSH ATTEN (INSTL) (R) (N) (TL3) EA     4.000 14,675.00000 1
552 2001 WIRE FENCE (TY A) LF     5,955.000 8.62469 6
552 2006 GATE (TY 2) EA     1.000 1,200.00000 1
552 2008 WIRE FENCE (WATER GAP) LF     144.000 20.00000 1
556 2006 PIPE UNDERDRAINS (TY 6) (6") LF     11,980.000 15.00000 1
560 2004 MAILBOX INSTALL - S (WC - POST) TY 3 FND EA 42.000 101.24000 158.000 119.76000 9
560 2005 MAILBOX INSTALL - D (WC - POST) TY 3 FND EA 6.000 121.18000 21.000 164.52762 6
560 2011 MAILBOX INSTALL - S (TWG - POST) TY 2 FND EA     152.000 134.96711 7
560 2013 MAILBOX INSTALL - D (TWG - POST) TY 2 FND EA     20.000 424.80000 5
560 2024 MAILBOX INSTALL - M (TWG - POST) TY 2 FND EA     8.000 353.12500 6