AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - PARIS DISTRICT

Last Update: Tuesday, September 30, 2014
ITEMS 400 2002 TO 460 2003
Items Items Bid Code Range
0100 - 0168
0216 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0618 - 0690
1122 - 1122
3233 - 3268
5261 - 5926
6007 - 6834
8251 - 8251
400 2002 - 460 2003
460 2007 - 496 2016
Item No Description Units Sept 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
400 2002 STRUCT EXCAV (BOX) CY     4,729.000 1.00000 1
400 2005 CEM STABIL BKFL CY     551.000 117.31397 3
400 2006 CUT & RESTORING PAV SY     1,013.600 109.64878 5
400 2020 CEM STAB BCKFL (UNDER APPR SLAB) CY     155.000 110.00000 1
400 2023 CEM STAB BKFL (BEHIND ABUTMENT) CY     6.000 150.00000 1
401 2001 FLOWABLE BACKFILL CY     39.000 139.37308 2
402 2001 TRENCH EXCAVATION PROTECTION LF 177.000 6.00000 3,036.000 2.17029 8
403 2001 TEMPORARY SPL SHORING SF 1,060.000 109.00000 14,314.000 35.59986 3
409 2001 PRESTR CONC PIL (16 IN SQ) LF     528.000 130.00000 1
416 2001 DRILL SHAFT (18 IN) LF     222.000 35.00000 1
416 2002 DRILL SHAFT (24 IN) LF     1,449.000 100.85714 4
416 2003 DRILL SHAFT (30 IN) LF     588.000 105.34694 2
416 2004 DRILL SHAFT (36 IN) LF     7,818.000 124.80558 4
416 2005 DRILL SHAFT (42 IN) LF     212.000 150.00000 1
416 2032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 10.000 198.00000 21.000 222.61905 2
420 2003 CL C CONC (ABUT) CY     1,011.600 630.15619 6
420 2004 CL C CONC (BENT) CY     509.000 671.35560 2
420 2019 CL C CONC (CAP) CY     6.600 700.00000 1
420 2029 CL S CONC (SLAB) CY     168.500 757.80415 2
420 2030 CL S CONC (PAN GIRD) CY     127.200 2,481.53994 1
420 2031 CL S CONC (SHEAR KEY) CY     58.700 348.89267 2
420 2033 CL S CONC (APPR SLAB) CY     933.200 438.50814 2
420 2051 CL C CONC (COLUMN) CY     3.900 700.00000 1
422 2001 REINF CONC SLAB SF     124,822.000 14.07933 5
423 2007 RETAINING WALL (SPREAD FOOTING) SF 432.000 90.00000 432.000 90.00000 1
423 2012 RETAINING WALL (CAST - IN - PLACE) SF     11,201.000 53.18748 2
425 2008 PRESTR CONC BOX BEAM (4B28) LF     874.000 173.63844 2
425 2009 PRESTR CONC BOX BEAM (5B28) LF     437.000 173.63844 2
425 2014 PRESTR CONC SLAB BEAM (4SB12) LF     200.000 163.00000 1
425 2015 PRESTR CONC SLAB BEAM (5SB12) LF     790.000 183.50000 2
425 2016 PRESTR CONC SLAB BEAM (4SB15) LF     748.000 156.00000 1
425 2017 PRESTR CONC SLAB BEAM (5SB15) LF     814.910 161.91125 2
425 2064 PRESTR CONC GIRDER (TX28) LF     14,188.000 126.58091 3
425 2065 PRESTR CONC GIRDER (TX34) LF     318.000 157.00000 1
425 2066 PRESTR CONC GIRDER (TX40) LF     715.930 156.99971 2
425 2069 PRESTR CONC GIRDER (TX62) LF     497.690 202.00000 1
427 2001 ADHESIVE GROUT FINISH SF     280.000 30.00000 1
427 2002 CONCRETE PAINT FINISH SF     10,523.000 .62000 1
429 2009 CNC STR REP (BRDG DECK) (PARTIAL DEPTH) SF     1,255.000 40.76494 2
430 2002 CL C CONC FOR EXT STR (ABUT) CY     7.600 1,500.00000 1
430 2003 CL C CONC FOR EXT STR (BENT) CY     4.600 2,000.00000 1
430 2006 CL C CONC FOR EXT STRU (CULV) (10'X 10') LF 38.000 650.00000 38.000 650.00000 1
430 2008 CL C CONC FOR EXT STRU (CULV) (3'X 3') LF 28.000 360.00000 28.000 360.00000 1
430 2009 CL C CONC FOR EXT STRU (CULV) (6'X 3') LF     28.000 291.07143 2
430 2010 CL C CONC FOR EXT STRU (CULV) (5'X 5') LF 35.000 486.42857 38.000 477.63158 3
430 2012 CL C CONC FOR EXT STRU (CULV) (3'X 2') LF 41.000 320.00000 118.000 248.22034 2
430 2013 CL C CONC FOR EXT STRU (CULV) (8'X 5') LF     26.000 390.00000 1
430 2018 CL C CONC FOR EXT STRU (CULV) (9'X 9') LF     16.000 800.00000 1
430 2019 CL C CONC FOR EXT STRU (CULV) (6'X 4') LF     75.000 320.00000 2
430 2020 CL C CONC FOR EXT STR (CULV) (4'X 2') LF     31.000 205.00000 1
430 2022 CL S CONC FOR EXT STR (PAN GIRDER) CY     55.000 1,300.00000 1
430 2023 CL C CONC FOR EXT STRU (CULV) (5' X 3') LF     24.000 250.00000 1
430 2024 CL C CONC FOR EXT STR (CULV) (5'X 4') LF     80.000 305.00000 2
430 2025 CL C CONC FOR EXT STRU (CULV) (7'X 7') LF     24.000 550.00000 1
430 2035 CL C CONC FOR EXT STRU (CULV) (4'X3') LF     41.000 274.75610 2
430 2045 CL C CONC FOR EXT STRU (CULV) (8'X6') LF 40.000 550.00000 40.000 550.00000 1
430 2051 CL C CONC FOR EXT STR (CULV) 5' X 2' LF     54.000 280.00000 1
430 2057 CL C CONC FOR EXT STRUC (CULV) (4'X4') LF 36.000 407.22222 52.000 374.23077 3
430 2058 CL C CONC FOR EXT STRUC (CULV) (10'X5' LF     8.000 410.00000 1
430 2079 CL C CONC FOR EXT STRU (CULV) (2 - 5'X4') LF     23.000 650.00000 2
430 2088 CL C CONC FOR EXT STR (CULV) (2 - 8'X5') LF     6.000 775.00000 1
430 2094 CL C CONC FOR EXT STR (CULV) (1 - 7'X4') LF     7.000 567.00000 1
430 2100 CL C CONC FOR EXT STR (CULV) (6'X 2') LF     31.000 300.00000 1
430 2113 CL C CONC FOR EXT STRU (CULV) (4 - 6'X 6' LF     16.000 1,225.00000 1
430 2124 CL C CONC FOR EXT STRU (CULV) (3 - 6'X4') LF     48.000 945.00000 2
430 2157 CL C CONC FOR EXT STR (CULV) (2 - 7'X3') LF     7.000 725.00000 1
430 2202 CL C CONC FOR EXT STR (CULV) (5'X2.5') LF 8.000 330.00000 8.000 330.00000 1
430 2245 CL C CONC FOR EXT STRU (CULV) (5'X 6') LF     12.000 300.00000 1
430 2256 CL C CONC FOR EXT STR (CULV) (2 - 3'X3') LF 7.000 580.00000 7.000 580.00000 1
430 2258 CL C CONC FOR EXT STR (CULV) (9'X5.5") LF     16.000 375.00000 1
432 2001 RIPRAP (CONC) (4 IN) CY 39.930 342.48685 43.930 339.52880 3
432 2002 RIPRAP (CONC) (5 IN) CY     582.000 350.00000 1
432 2016 RIPRAP (STONE COMMON) (DRY) (8 IN) CY     21.000 138.09524 2
432 2019 RIPRAP (STONE PROTECTION) (12 IN) CY     1,650.300 86.56850 3
432 2021 RIPRAP (STONE PROTECTION) (18 IN) CY 119.000 85.00000 1,602.000 52.59988 2
432 2022 RIPRAP (STONE PROTECTION) (21 IN) CY 35.000 139.00000 35.000 139.00000 1
432 2028 BEDDING MATERIAL (6 IN) CY     131.000 90.00000 1
432 2033 RIPRAP (STONE COMMON) (DRY) (12 IN) CY 45.000 140.00000 164.700 181.72495 4
432 2039 RIPRAP (MOW STRIP) (4 IN) CY 75.900 341.93017 521.900 383.76160 8
432 2041 RIPRAP (STONE COMMON) (DRY) (18 IN) CY     926.000 100.00000 1
432 2048 RIPRAP (CONC) (FLUME) CY     22.000 310.00000 1
432 2085 RIPRAP (CONC) (CL B) (6") CY 15.000 325.00000 15.000 325.00000 1
438 2002 CLEAN AND SEAL EXIST JOINTS LF     86.800 20.00000 1
450 2073 RAIL (HANDRAIL) (TY B) LF     143.000 100.00000 1
450 2143 RAILING (TY T551) LF     1,320.000 60.00000 1
450 2146 RAIL (TY T552) LF     2,931.000 60.00000 1
450 2160 RAIL (TY T221) (RETROFIT) LF     320.000 180.00000 1
450 2161 RAIL (TY T223) LF     3,776.000 78.29667 7
450 2642 RAIL (T131RC) (RETROFIT) LF     450.000 110.16000 1
452 2001 REMOV RAIL (CONC ELEMENTS) LF     414.000 116.84000 1
452 2002 REMOV RAIL (METAL ELEMENTS) LF     285.000 68.00000 1
452 2003 REMOV RAIL (CONC POST & MTL ELEMENTS) LF     300.000 10.00000 1
452 2007 REMOVE RAIL (TY 6) LF     303.400 25.00000 1
454 2001 SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF     1,023.000 80.00000 1
454 2005 ARMOR JOINT (WITH SEAL) LF     284.000 100.00000 1
459 2002 GABIONS (GALV) CY     896.000 203.09152 3
459 2011 GABION MATTRESSES (GALV) (12 IN) SY     106.000 100.00000 1
459 2012 GABION MATTRESSES (GALV) (18 IN) SY     39.000 88.00000 1
459 2014 GABIONS (3' X 3') (GALV) CY     90.000 180.00000 1
460 2003 CMP (GAL STL 18 IN) LF     163.000 60.60123 2