AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - PARIS DISTRICT

Last Update: Tuesday, November 29, 2016
ITEMS 100 6001 TO 192 6032
Items Items Bid Code Range
0100 - 0192
0216 - 0292
0305 - 0360
0400 - 0497
0500 - 0560
0610 - 0686
0721 - 0784
1002 - 1002
4022 - 4053
5001 - 5028
6000 - 6185
100 6001 - 192 6032
Item No Description Units November 30, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 6001 PREPARING ROW AC     12.840 6,691.91978 1
100 6002 PREPARING ROW STA 98.170 2,546.59998 4,720.550 832.38861 22
100 6004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     4.000 625.00000 2
100 6007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     50.000 206.00000 2
100 6009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     16.000 433.75000 2
100 6011 PREPARING ROW (TREE) (24" TO 36" DIA.) EA     1.000 2,200.00000 1
100 6013 PREP ROW (TREE) (2" TO 12" DIA) EA     18.000 200.00000 1
100 6016 PREPARING ROW (TREE) (36" TO 48" DIA) EA     1.000 3,000.00000 1
104 6001 REMOVING CONC (PAV) SY     17,000.000 8.32379 3
104 6009 REMOVING CONC (RIPRAP) SY     3,194.000 14.04571 3
104 6011 REMOVING CONC (MEDIANS) SY     160.000 14.10000 2
104 6015 REMOVING CONC (SIDEWALKS) SY     145.000 15.93793 2
104 6017 REMOVING CONC (DRIVEWAYS) SY     10,738.000 15.69771 9
104 6021 REMOVING CONC (CURB) LF     727.000 6.70426 2
104 6022 REMOVING CONC (CURB AND GUTTER) LF     50.000 10.00000 1
104 6023 REMOVING CONC (CTB) LF     2,728.000 21.26833 2
104 6028 REMOVING CONC (MISC) SY     525.000 18.00000 1
104 6029 REMOVING CONC (CURB OR CURB & GUTTER) LF     796.000 15.00000 1
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY     86.000 35.00000 1
104 6044 REMOVING CONC (FLUME) SY     13.000 13.00000 1
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY     3,242.000 7.33255 2
105 6019 REMOVING STAB BASE & ASPH PAV (14") SY 2,728.000 8.91000 2,728.000 8.91000 1
105 6021 REMOVING STAB BASE AND ASPH PAV (0 - 4") SY     5,042.000 3.25000 1
105 6035 REMOVING STAB BASE & ASPH PAV (0 - 2") SY     483.000 12.00000 1
105 6041 REMOVING STAB BASE AND ASPH PAV (8") SY     1,313.000 12.54829 2
105 6073 REMOV STAB BASE AND ASPH PAV (22") SY     12,653.000 15.00000 1
105 6074 REMOVING STAB BASE AND ASPH PAV (4") SY     20,541.000 4.34000 1
105 6105 REMOVING STAB BASE AND ASPH PAV (15") SY     6,096.000 10.00000 1
106 6001 OBLITERATING ABANDONED ROAD STA     40.800 1,800.00000 1
110 6001 EXCAVATION (ROADWAY) CY 17,396.000 8.42000 372,492.000 9.89499 16
110 6002 EXCAVATION (CHANNEL) CY 30.000 942.37000 11,799.000 22.67970 13
110 6003 EXCAVATION (SPECIAL) CY     91.000 58.00000 1
112 6001 SUBGRADE WIDENING (ORD COMP) STA     2,682.170 159.64079 8
132 6002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     68,745.000 14.80000 1
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     4,140.000 17.42766 9
132 6004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY 147,239.000 7.63000 409,610.000 7.99000 8
132 6017 EMBANKMENT (VEHICLE) (ORD COMP) (TY A) CY     72.000 53.76000 1
132 6019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     4,058.000 16.57956 5
132 6026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY     62,171.000 14.00000 1
134 6001 BACKFILL (TY A) STA     842.860 225.82155 4
134 6002 BACKFILL (TY B) STA     2,457.790 147.83605 8
150 6001 BLADING STA     277.280 124.50952 2
152 6001 ROAD GRADER WORK (ORD COMP) STA     2,571.590 181.74389 11
156 6001 BULLDOZER WORK HR     61.000 50.00000 1
158 6002 SPEC EXCAV WORK (BACKHOE) HR     61.000 50.00000 1
160 6001 FURNISHING AND PLACING TOPSOIL (4") STA     763.840 338.12775 2
160 6002 FURNISHING AND PLACING TOPSOIL (6") STA     242.750 550.00000 1
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY     112,864.000 1.11258 5
160 6005 FURNISHING AND PLACING TOPSOIL CY     11.000 40.00000 1
162 6002 BLOCK SODDING SY     100,623.000 3.35957 7
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY     44,809.000 .13659 2
164 6007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY     2,782.000 .69000 1
164 6009 BROADCAST SEED (TEMP) (WARM) SY 53,033.000 .10000 723,066.000 .09698 14
164 6011 BROADCAST SEED (TEMP) (COOL) SY 53,033.000 .11000 734,145.000 .10557 15
164 6013 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY SY     899,452.000 .24380 6
164 6015 STRAW / HAY MLCH SEED (PERM) (RURAL) (CLAY) SY 106,063.000 .25000 897,802.000 .23042 7
164 6021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     444,376.000 .29551 3
164 6023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     39,945.000 1.17167 6
164 6029 CELL FBR MLCH SEED (TEMP) (WARM) SY     443,703.000 .27981 8
164 6031 CELL FBR MLCH SEED (TEMP) (COOL) SY     438,963.000 .27704 7
168 6001 VEGETATIVE WATERING MG 1,723.000 5.50000 45,272.370 7.51286 26
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     19,173.000 1.16000 1
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     14,967.000 1.14000 1
169 6005 SOIL RETENTION BLANKETS (CL 2) (TY E) SY 4,362.000 1.75000 4,362.000 1.75000 1
169 6006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY 5,296.000 1.75000 5,296.000 1.75000 1
170 6001 IRRIGATION SYSTEM LS     2.000 65,000.00000 2
180 6001 WILDFLOWER SEEDING AC     6.200 4,400.00000 1
192 6002 PLANT MATERIAL (1 - GAL) EA     271.000 10.00000 1
192 6003 PLANT MATERIAL (3 - GAL) EA     43.000 30.00000 1
192 6004 PLANT MATERIAL (5 - GAL) EA     2,808.000 32.00962 2
192 6014 PLANT SOIL MIX CY     50.000 75.00000 1
192 6016 PLANT BED PREPARATION SY     2,787.000 25.16864 2
192 6024 PLANT MATERIAL (30 GAL) (TREE) EA     108.000 356.06481 2
192 6025 PLANT MATERIAL (45 GAL) (TREE) EA     2.000 400.00000 1
192 6027 PLANT MATERIAL (100 GAL) (TREE) EA     93.000 1,100.00000 1
192 6032 PLANT MATERIAL (10 GAL) (SHRUB) EA     49.000 180.00000 1