| Item No |
Description |
Units |
May 31, 2013 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 305 2002 |
SALV, HAUL & STKPL RCL APH PV (0 TO 2" |
SY |
|
|
1,335.000 |
4.10787 |
2 |
| 305 2015 |
SALV, HAUL & STKPL RCL APH PV (1 1 / 2") |
SY |
|
|
84,518.660 |
0.81907 |
4 |
| 305 2018 |
SALV, HAUL & STKPL RCL APH PV (2") |
SY |
|
|
25,072.000 |
2.00000 |
2 |
| 305 2019 |
SALV, HAUL & STKPL RCL APH PV (0 TO 1 1 / 2" |
SY |
|
|
2,780.000 |
3.84640 |
3 |
| 310 2001 |
PRIME COAT (MC - 30) |
GAL |
|
|
4,667.000 |
6.50000 |
1 |
| 316 2222 |
AGGR (TY - PB GR - 4S SAC - B) |
CY |
|
|
632.000 |
102.00000 |
2 |
| 316 2239 |
AGGR (TY - PD GR - 4 SAC - B) |
CY |
|
|
40.000 |
267.00000 |
1 |
| 316 2492 |
ASPH (AC - 20XP OR AC - 20 - 5TR) |
GAL |
|
|
1,575.000 |
4.00000 |
1 |
| 316 2703 |
ASPH (AC - 10 - 2TR, AC - 10W / 2% SBR, OR AC - 15P |
GAL |
|
|
25,260.000 |
3.50000 |
2 |
| 318 2164 |
AGGR (TY - PB GR - 4 SAC - B) |
CY |
481.740 |
95.00000 |
1,099.740 |
97.80976 |
3 |
| 318 2308 |
A - R BINDER (TYPE III) |
GAL |
26,495.700 |
3.50000 |
60,431.700 |
3.19114 |
3 |
| 340 2103 |
D - GR HMA (METH) TY - D SAC - A PG64 - 22 |
TON |
|
|
100.000 |
290.00000 |
1 |
| 340 2120 |
D - GR HMA (METH) TY - D SAC - B PG70 - 22 |
TON |
16.000 |
250.00000 |
466.000 |
101.91845 |
3 |
| 351 2001 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (5") |
SY |
|
|
6,100.000 |
22.00000 |
1 |
| 351 2002 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (6") |
SY |
|
|
20,737.000 |
39.45978 |
6 |
| 351 2004 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (8") |
SY |
|
|
6,137.000 |
49.21981 |
4 |
| 351 2005 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (9") |
SY |
|
|
7,500.000 |
56.80000 |
3 |
| 351 2006 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (10" |
SY |
|
|
2,587.000 |
66.69965 |
4 |
| 351 2009 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (14" |
SY |
|
|
225.000 |
115.00000 |
1 |
| 351 2011 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (18" |
SY |
|
|
1,350.000 |
58.88889 |
2 |
| 351 2012 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (2") |
SY |
|
|
3,875.000 |
26.06452 |
2 |
| 351 2013 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (4") |
SY |
|
|
10,500.000 |
30.05952 |
4 |
| 351 2020 |
FLEX PAVE STRUCTURE REPAIR (8.5 - 10") |
SY |
|
|
1,000.000 |
52.00000 |
2 |
| 351 2022 |
FLEXIBLE PAV STRUCTURE REPAIR (1.5") |
SY |
|
|
2,240.000 |
14.30000 |
1 |
| 351 2025 |
FLEX PAVEMENT STRUCTURE REPAIR (8" - 15" |
SY |
200.000 |
79.00000 |
200.000 |
79.00000 |
1 |
| 354 2021 |
PLANE ASPH CONC PAV (0" TO 2") |
SY |
|
|
2,490.000 |
3.17791 |
3 |
| 354 2045 |
PLANE ASPH CONC PAV (2") |
SY |
43,794.540 |
1.25000 |
106,942.540 |
1.04333 |
3 |
| 354 2048 |
PLANE ASPH CONC PAV (3") |
SY |
|
|
17,396.000 |
1.00000 |
2 |
| 354 2051 |
PLANE ASPH CONC PAV (0" TO 1 1 / 2") |
SY |
2,833.000 |
3.00000 |
6,200.000 |
2.79329 |
4 |
| 354 2162 |
PLANE CONC PAV (0" TO 1 - 3 / 4") |
SY |
|
|
14,426.000 |
6.00000 |
2 |
| 354 2163 |
PLANE CONC PAV (1 - 3 / 4") |
SY |
|
|
3,212.000 |
6.00000 |
2 |
| 361 2002 |
FULL - DEPTH REPAIR CRCP (9") |
SY |
|
|
37.000 |
175.00000 |
1 |
| 361 2003 |
FULL - DEPTH REPAIR CRCP (10") |
SY |
|
|
4,150.000 |
169.84940 |
8 |
| 361 2005 |
FULL - DEPTH REPAIR CRCP (12") |
SY |
|
|
549.000 |
182.46812 |
3 |
| 361 2006 |
FULL - DEPTH REPAIR CRCP (13") |
SY |
|
|
962.000 |
195.93347 |
5 |
| 361 2007 |
FULL - DEPTH REPAIR CRCP (14") |
SY |
|
|
1,725.000 |
184.21739 |
4 |
| 361 2008 |
FULL - DEPTH REPAIR CRCP (15") |
SY |
|
|
4,250.000 |
190.97647 |
7 |
| 361 2019 |
FULL - DEPTH REPAIR CPJR (8") |
SY |
|
|
260.000 |
163.69231 |
4 |
| 361 2020 |
FULL - DEPTH REPAIR CPJR (9") |
SY |
|
|
450.000 |
172.50000 |
2 |
| 361 2021 |
FULL - DEPTH REPAIR CPJR (10") |
SY |
|
|
1,925.000 |
169.55844 |
5 |
| 361 2023 |
FULL - DEPTH REPAIR CPJR (12") |
SY |
|
|
423.000 |
177.72340 |
2 |
| 361 2025 |
FULL - DEPTH REPAIR CPJR (13") |
SY |
|
|
200.000 |
188.00000 |
1 |
| 361 2034 |
FULL - DEPTH REPAIR CRCP (8" - 14") |
SY |
|
|
300.000 |
250.00000 |
1 |