AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - DALLAS DISTRICT

Last Update: Friday, March 27, 2015
ITEMS 400 2001 TO 429 2010
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0361
0400 - 0499
0500 - 0560
0610 - 0690
0712 - 0784
1005 - 1158
2021 - 2274
3142 - 3271
4007 - 4686
5155 - 5943
6001 - 6949
7595 - 7595
8020 - 8998
400 2001 - 429 2010
430 2009 - 450 2612
450 2624 - 464 6010
464 6011 - 466 2023
466 2024 - 467 2286
467 2288 - 499 2001
Item No Description Units March 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
400 2001 STRUCT EXCAV CY     3,388.000 8.00000 1
400 2005 CEM STABIL BKFL CY     1,418.200 112.92139 9
400 2006 CUT & RESTORING PAV SY     5,408.000 73.93912 8
400 2008 CUT & RESTORING PAV (ASPH) SY     1,290.500 84.87602 3
400 2009 CUT & RESTORING PAV (CONC) SY     667.000 195.80435 2
400 2016 CEMENT STAB BACKFILL (INLET OR MH) CY     104.000 57.75000 1
400 6005 CEM STABIL BKFL CY 343.000 147.74052 343.000 147.74052 3
400 6006 CUT & RESTORING PAV SY 241.000 89.62656 263.000 98.85932 3
401 2001 FLOWABLE BACKFILL CY     490.200 168.55330 8
402 2001 TRENCH EXCAVATION PROTECTION LF     155,813.000 1.17034 23
402 6001 TRENCH EXCAVATION PROTECTION LF 431.000 13.47796 540.000 15.90463 4
403 2001 TEMPORARY SPL SHORING SF     379,297.100 13.86536 29
403 2002 TEMPORARY SPL SHORING (SOIL NAIL) SF     3,753.000 29.07474 2
403 2007 TEMPORARY SPL SHORING (ROCK NAIL) SF     147.000 52.50000 1
403 6001 TEMPORARY SPL SHORING SF 11,117.000 25.00000 11,421.000 26.46397 2
416 2001 DRILL SHAFT (18 IN) LF     3,946.000 53.70608 7
416 2002 DRILL SHAFT (24 IN) LF     22,446.000 63.04583 6
416 2003 DRILL SHAFT (30 IN) LF     29,429.000 110.02696 7
416 2004 DRILL SHAFT (36 IN) LF     33,790.000 137.63902 18
416 2005 DRILL SHAFT (42 IN) LF     23,558.000 170.94102 6
416 2006 DRILL SHAFT (48 IN) LF     7,016.000 239.99000 1
416 2007 DRILL SHAFT (54 IN) LF     612.000 303.40000 1
416 2008 DRILL SHAFT (60 IN) LF     858.000 401.53000 1
416 2010 DRILL SHAFT (72 IN) LF     262.000 621.67000 1
416 2018 DRILL SHAFT (SIGN MTS) (24 IN) LF     52.000 258.35231 2
416 2019 DRILL SHAFT (SIGN MTS) (30 IN) LF     66.000 108.47000 1
416 2020 DRILL SHAFT (SIGN MTS) (36 IN) LF     30.000 192.94867 2
416 2021 DRILL SHAFT (SIGN MTS) (42 IN) LF     700.000 254.47814 4
416 2022 DRILL SHAFT (SIGN MTS) (48 IN) LF     390.000 509.97882 7
416 2023 DRILL SHAFT (SIGN MTS) (54 IN) LF     752.500 330.52140 5
416 2026 DRILL SHAFT (HIGH MAST POLE) (60 IN) LF     103.000 426.05165 2
416 2029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF     2,274.000 133.05113 7
416 2031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF     307.000 170.38326 8
416 2032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF     1,388.000 197.87550 17
416 2034 DRILL SHAFT (TRF SIG POLE) (48 IN) LF     1,848.000 287.81929 15
416 2059 DRILL SHAFT (24 IN) (HPC) LF     632.000 95.00000 1
416 2086 DRILL SHAFT (RDWY ILL POLE) (24 IN) LF     27.500 100.00000 1
416 6034 DRILL SHAFT (TRF SIG POLE) (48 IN) LF 88.000 264.00000 88.000 264.00000 1
420 2001 CL A CONC (MISC) CY     15.000 900.00000 1
420 2002 CL B CONC (FLUME) CY     265.100 417.17578 4
420 2004 CL C CONC (BENT) CY     30.800 1,500.00000 1
420 2005 CL C CONC (FOOTING) CY     531.200 644.37123 2
420 2006 CL C CONC (RAIL FOUNDATION) CY     49.300 427.28276 2
420 2010 CL C CONC (SIGN COLUMN) CY     82.000 750.00000 1
420 2011 CL C CONC (RETAINING WALL) CY     9.100 1,000.00000 1
420 2013 CL C CONC (MISC) CY 7.500 1,000.00000 1,077.100 503.73224 4
420 2019 CL C CONC (CAP) CY     346.100 621.00000 1
420 2023 CL F CONC (COLUMN) CY     733.900 800.00000 1
420 2026 CL F CONC (FOOTING) CY     407.400 600.00000 1
420 2041 CL C CONC (ABUT) (HPC) CY     2,657.800 794.05236 16
420 2042 CL C CONC (BENT) (HPC) CY     8,189.000 701.05362 11
420 2051 CL C CONC (COLUMN) CY     347.500 944.53871 2
420 2061 CL S CONC (HPC) BAS CY     2,699.000 472.22085 7
420 2068 CL S CONC (HPC) (SLAB) CY     158.100 680.00000 1
420 2069 CL S CONC (HPC) (SHEAR KEY) CY     48.400 270.00000 1
420 2092 CL C CONC (CAP) (MASS PLACEMENT) (HPC) CY     705.300 690.00000 1
420 2093 CL C CONC (COLUMN) (MASS PLACE) (HPC) CY     1,124.600 575.00000 1
420 2094 CL C CONC (FOOTING) (MASS PLACE) (HPC) CY     725.100 500.00000 1
420 2120 CL C CONC (BUS STOP) CY     13.000 500.00000 1
420 2123 CL C CONC (FOOTING) (HPC) CY     1,186.400 600.00000 1
420 2124 CL S CONC (SLAB) SF     5,082.000 14.00000 1
420 2221 CL S CONC (JUNCTION BOX) CY     103.000 775.00000 1
420 2223 CL C CONC (COLUMN) (HPC) CY     2,545.100 690.89093 4
420 2256 CL S CONC (APPR SLAB) (HPC) CY     2,301.100 420.63678 9
420 2268 CL C CONC (RAIL FOUNDATION) (HPC) CY     93.000 400.00000 1
420 2269 CL C CONC (CAP) (HPC) CY     5,436.500 809.34931 4
420 2276 CL C CONC (WALL) CY     44.100 545.00000 1
420 2283 CL F CONC (END WALL) CY     235.600 2,000.00000 1
420 2285 CL F CONC (GRADE BEAM) CY     1,497.200 500.00000 1
420 2286 CL H CONC (PRECAST PANEL) SF     66,793.000 22.00000 1
420 2291 CL S CONC (BRIDGE MEDIAN) (HPC) CY     1,630.800 353.79820 5
420 2292 CL S CONC (BRIDGE SDWLK) (HPC) CY     522.500 381.57091 3
422 2003 REINF CONC SLAB (HPC) (CL S) SF     1,341,217.000 14.16994 15
423 2001 RETAINING WALL (MSE) SF     387,392.000 49.41987 11
423 2005 RETAINING WALL (TEMP WALL) SF     24,417.000 13.65000 1
423 2006 RETAINING WALL (CONC BLOCK) SF     5,984.000 28.53092 3
423 2007 RETAINING WALL (SPREAD FOOTING) SF     7,989.000 67.20270 5
423 2009 RETAINING WALL (SOIL NAILED) (FACIA) SF     3,008.000 52.50000 1
423 2010 RETAINING WALL (ROCK NAILED) (FACIA) SF     9,129.000 55.00000 1
423 2011 RETAINING WALL (DRILL SHAFT) (FACIA) SF     39,733.680 48.34046 3
423 2012 RETAINING WALL (CAST - IN - PLACE) SF 5,288.000 40.00000 19,080.000 43.10612 6
423 2025 RETAINING WALL (SPECIAL) SF     1,280.000 80.46875 2
425 2003 PRESTR CONC BEAM (TY C) LF     6,329.300 81.36127 2
425 2004 PRESTR CONC BEAM (TY IV) LF     10,344.300 129.32325 2
425 2006 PRESTR CONC BOX BEAM (4B20) LF     981.000 155.00000 1
425 2007 PRESTR CONC BOX BEAM (5B20) LF     817.500 155.00000 1
425 2014 PRESTR CONC SLAB BEAM (4SB12) LF     1,122.460 131.30873 2
425 2015 PRESTR CONC SLAB BEAM (5SB12) LF     292.120 160.00000 1
425 2016 PRESTR CONC SLAB BEAM (4SB15) LF     653.880 150.96348 2
425 2017 PRESTR CONC SLAB BEAM (5SB15) LF     1,089.800 155.48174 2
425 2019 PRESTR CONC U - BEAM (U54) LF     13,188.570 205.00000 1
425 2064 PRESTR CONC GIRDER (TX28) LF     6,823.520 129.42810 5
425 2065 PRESTR CONC GIRDER (TX34) LF     1,266.500 110.00000 1
425 2066 PRESTR CONC GIRDER (TX40) LF     4,080.540 141.61138 2
425 2068 PRESTR CONC GIRDER (TX54) LF     62,885.388 133.35338 4
425 2069 PRESTR CONC GIRDER (TX62) LF     1,295.200 145.00000 1
425 2070 PRESTR CONC GIRDER (TX70) LF     57,490.174 150.00000 2
425 2100 PRESTR CONC BOX BEAM (5XB20) LF     1,635.000 210.00000 1
429 2009 CNC STR REP (BRDG DECK) (PARTIAL DEPTH) SF     1,946.500 39.00000 1
429 2010 CNC STR REP (BRDG DECK) (FULL DEPTH) SF     480.000 100.00000 1