Item No Description Units January 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA     447.300 2,192.62464 6
100 6002 PREPARING ROW STA 291.560 1,983.70833 9,866.170 3,231.61842 39
100 6003 PREPARING ROW (TREE) (5" TO 12" DIA) EA     102.000 125.00000 1
104 2001 REMOVING CONC (PAV) SY     13,561.000 13.78188 2
104 2009 REMOVING CONC (RIPRAP) SY     3,138.000 8.84519 4
104 2011 REMOVING CONC (MEDIANS) SY     6,941.000 7.77484 3
104 2014 REMOVING CONC (FOUNDATIONS) CY     4.200 50.00000 1
104 2015 REMOVING CONC (SIDEWALKS) SY     3,865.000 10.72576 2
104 2017 REMOVING CONC (DRIVEWAYS) SY     11,190.600 7.95722 3
104 2021 REMOVING CONC (CURB) LF     500.000 2.50000 1
104 2023 REMOVING CONC (CTB) LF     1,015.000 18.00000 1
104 2024 REMOVING CONC (RETAINING WALLS) SY     175.000 20.00000 1
104 2028 REMOVING CONC (MISC) SY     171.000 22.59006 3
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     8,041.000 5.01415 2
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY     10.000 37.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     901.000 9.67916 2
104 6001 REMOVING CONC (PAV) SY     760,223.500 4.80257 16
104 6009 REMOVING CONC (RIPRAP) SY     23,685.300 9.42845 20
104 6010 REMOVING CONC (RIPRAP) CY     17.920 97.00000 1
104 6011 REMOVING CONC (MEDIANS) SY     4,521.000 21.00633 9
104 6014 REMOVING CONC (FOUNDATIONS) CY     4.220 1,023.77962 2
104 6015 REMOVING CONC (SIDEWALKS) SY     2,531.000 11.64548 6
104 6017 REMOVING CONC (DRIVEWAYS) SY 3,457.000 18.87469 35,134.200 13.17069 16
104 6021 REMOVING CONC (CURB) LF     5,503.000 4.50380 7
104 6022 REMOVING CONC (CURB AND GUTTER) LF     5,773.700 8.94929 7
104 6023 REMOVING CONC (CTB) LF     2,420.000 7.30000 2
104 6024 REMOVING CONC (RETAINING WALLS) SY     9,336.000 43.38903 2
104 6025 REMOVE CONC (WINGWALL) CY     2.630 472.00000 1
104 6032 REMOVING CONC (WHEELCHAIR RAMP) SY     83.000 43.46988 2
104 6034 REMOVING CONC (COPING) LF     431.000 9.33000 1
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY     1,026.000 16.86160 2
104 6037 REMOVE CONC (RAIL) LF     900.000 15.00000 1
104 6040 REMOVING CONC (PAVERS) SY     241.000 25.00000 1
104 6044 REMOVING CONC (FLUME) SY     235.000 12.91915 3
104 6046 REMOV STR (SCREEN WALL) LF     1,456.000 24.13393 2
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     6,213.000 5.92000 1
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     1,569.000 4.00000 1
105 2013 REMOVING STAB BASE & ASPH PAV (9") SY     1,233.000 5.92000 1
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     3,496.000 8.00000 1
105 2030 REMOVING STAB BASE & ASPH PAV (8" - 14") SY     1,313.000 6.00000 1
105 2037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     71,166.000 3.69390 2
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY     14,230.700 8.62728 2
105 6011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY 4,166.000 4.25000 19,379.000 2.48369 2
105 6012 REMOVING STAB BASE AND ASPH PAV (2" - 6" CY     34,232.000 .50000 1
105 6013 REMOVING STAB BASE & ASPH PAV (9") SY     3,300.000 12.60000 1
105 6015 REMOVING STAB BASE & ASPH PAV (8" - 10") SY     442,770.000 3.49448 2
105 6019 REMOVING STAB BASE & ASPH PAV (14") SY     5,438.000 11.00000 1
105 6020 REMOVING STAB BASE & ASPH PAV (12") SY     33.000 17.00000 1
105 6021 REMOVING STAB BASE AND ASPH PAV (0 - 4") SY     1,388.000 7.00000 1
105 6029 REMOVE STAB BASE & ASPH PAV (24") SY     83,958.000 4.31308 2
105 6030 REMOVING STAB BASE & ASPH PAV (8" - 14") SY     15,384.000 4.34828 2
105 6041 REMOVING STAB BASE AND ASPH PAV (8") SY     551.000 10.00000 1
105 6043 REMOVING STAB BASE & ASPH PAV (0 - 6") SY     3,264.000 6.33505 3
105 6045 REMOVING STAB BASE AND ASPH PAV (2" - 8" SY     3,539.000 9.19116 2
105 6049 REMOVING STAB BASE & ASPH PAV (4" - 22") SY     36,335.000 4.50000 1
105 6054 REMOVING STAB BASE & ASPH PAV (18") SY     2,376.000 13.00000 1
105 6057 REMOVE STAB BS & ASPH PAV (5" - 10") SY     1,345.000 7.00000 1
105 6069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     1,220.000 10.00000 1
105 6070 REMOVING STAB BASE & ASPH PAV (6" - 8" SY     12,880.500 7.78309 3
105 6072 REMOVING STAB BASE & ASPH PAV (26" - 32") SY     158,278.000 4.00000 1
105 6074 REMOVING STAB BASE AND ASPH PAV (4") SY     922.000 7.00000 1
105 6075 REMOV STAB BASE AND ASPH PAV (10" - 18") SY     227,201.000 7.02728 3
105 6078 REMOVE STAB BASE & ASPH PAV (24" - 38") SY     62,950.000 4.50000 1
105 6079 REMOVING STAB BASE & ASPH PAV (4" - 12") SY     339,125.000 2.57624 3
105 6090 RMV STAB BS & ASPH PAV (11.5" - 22") SY     320,410.000 5.08333 4
105 6095 REMOVING STAB BASE & ASPH PAV (12" - 14" SY 41,333.000 6.04000 41,333.000 6.04000 1
105 6109 REMOVING STAB BASE & ASPH PAV (8" - 19") SY     9,601.000 11.55000 1
106 6001 OBLITERATING ABANDONED ROAD STA     37.000 600.00000 1
106 6002 OBLITERATING ABANDONED ROAD SY     2,360.000 4.01000 1
110 2001 EXCAVATION (ROADWAY) CY     176,219.000 6.24666 4
110 2002 EXCAVATION (CHANNEL) CY     57,515.000 5.83603 3
110 2003 EXCAVATION (SPECIAL) CY     3,452.700 12.69514 2
110 6001 EXCAVATION (ROADWAY) CY 237,017.050 9.10885 3,494,513.750 6.80945 37
110 6002 EXCAVATION (CHANNEL) CY     61,791.000 11.24301 11
112 2001 SUBGRADE WIDENING (ORD COMP) STA     123.300 434.00000 1
112 6001 SUBGRADE WIDENING (ORD COMP) STA 156.510 600.00000 2,339.830 365.41989 8
112 6002 SUBGRADE WIDENING (DENS CONT) STA     506.370 635.91741 2
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     7,988.000 33.45357 3
132 2008 EMBANKMENT (FINAL) (DENS CONT) (TY D) CY     3,295.000 6.50000 1
132 2025 EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY     464,609.000 3.23924 2
132 2026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY     11,387.000 15.66141 2
132 6001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     41.000 30.00000 1
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     162.000 20.00000 1
132 6005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     18,934.500 10.15000 1
132 6006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 19,784.000 10.00000 402,111.000 10.80749 24
132 6025 EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY 44,230.800 7.00000 3,022,942.800 7.35303 14
132 6026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY 1,850.000 7.00000 411,430.000 14.78898 13
132 6030 EMBANKMENT (FINAL) (DENS CONT) (TY C3) CY     119,697.000 14.00000 1
134 2002 BACKFILL (TY B) STA     230.000 157.50000 1
134 2004 BACKFILL (TY A OR B) STA     123.300 313.00000 1
134 6004 BACKFILL (TY A OR B) STA 153.310 500.00000 3,331.720 236.05126 14
134 6008 BACKFILL (TY A OR B) CY     133.000 175.00000 1
150 6001 BLADING STA     787.550 38.00547 3
152 6001 ROAD GRADER WORK (ORD COMP) STA     169.680 300.00000 1
152 6003 ROAD GRADER WORK (DENS CONT) STA 40.890 200.00000 40.890 200.00000 1
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY     25,026.000 2.21977 2
160 6004 FURNISHING AND PLACING TOPSOIL (6") SY     20,746.000 1.70000 1
161 2001 COMPOST MANUF TOPSOIL (BOS) (4") STA     123.300 211.10998 1
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY     336,758.000 1.17765 4
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY     10,502.000 4.75000 1