AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - DALLAS DISTRICT

Last Update: Friday, May 3, 2013
ITEMS 100 2001 TO 192 2001
Items Items Bid Code Range
0100 - 0193
0204 - 0275
0305 - 0368
0400 - 0496
0500 - 0560
0610 - 0690
0712 - 0760
1012 - 1122
2030 - 2064
3224 - 3271
4050 - 4622
5049 - 5935
6006 - 6834
8020 - 8941
100 2001 - 192 2001
192 2002 - 193 2001
Item No Description Units April 30, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     18.260 5,020.18894 2
100 2002 PREPARING ROW STA 438.470 603.87167 2,700.850 1,979.75500 24
100 2006 PREP ROW (TREE) (LESS THAN 24" DIA) EA     5.000 500.00000 1
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     1.000 2,500.00000 1
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     59.000 235.00000 1
104 2001 REMOVING CONC (PAV) SY 1,154.000 9.05000 283,062.000 4.43905 13
104 2009 REMOVING CONC (RIPRAP) SY     14,677.000 3.28096 13
104 2010 REMOVING CONC (RIPRAP) CY     46.000 100.00000 1
104 2011 REMOVING CONC (MEDIANS) SY 977.000 9.60491 1,910.750 9.39108 8
104 2015 REMOVING CONC (SIDEWALKS) SY 40.000 20.00000 475.000 8.87495 4
104 2017 REMOVING CONC (DRIVEWAYS) SY 2,374.000 10.86672 29,314.550 7.40100 16
104 2021 REMOVING CONC (CURB) LF 695.000 2.71942 18,269.000 4.54513 11
104 2022 REMOVING CONC (CURB AND GUTTER) LF 662.000 7.00000 3,167.000 4.35763 4
104 2023 REMOVING CONC (CTB) LF     139,423.520 6.51073 3
104 2024 REMOVING CONC (RETAINING WALLS) SY     1,277.200 29.73027 3
104 2028 REMOVING CONC (MISC) SY 20.000 20.00000 964.000 9.22822 2
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF 20.000 20.00000 20.000 20.00000 1
104 2034 REMOVING CONC (COPING) LF     486.000 25.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     1,557.000 11.01162 2
104 2037 REMOVE CONC (RAIL) LF     20.000 18.05000 1
104 2044 REMOVING CONC (FLUME) SY     1,417.850 11.73769 2
104 2052 REMOVE HOV TRAFFIC GATE EA     5.000 825.17000 1
104 2053 REMOVE DRAGNET EA     1.000 3,300.00000 1
105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY     7,355.000 1.00000 1
105 2005 REMOVING STAB BASE AND ASPH PAV (3") SY     618.000 9.47000 1
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     24,343.000 1.93304 2
105 2014 REMOVING STAB BASE & ASPH PAV (7" - 12") SY     103,714.270 2.00000 1
105 2018 REMOVING STAB BASE AND ASPH PAV (7") SY     23,287.000 3.76373 2
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     1,830.000 9.50273 2
105 2021 REMOVING STAB BASE AND ASPH PAV (0 - 4") SY     84.000 19.00000 1
105 2023 REMOVING STAB BASE AND ASPH PAV (5") SY     6,479.000 3.15000 1
105 2030 REMOVING STAB BASE & ASPH PAV (8" - 14") SY     7,398.000 4.35000 1
105 2035 REMOVING STAB BASE & ASPH PAV (0 - 2") SY     1,088.000 9.00000 1
105 2037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     66,084.000 1.50000 1
105 2039 REMOVE STAB BASE AND ASPH PAV (6" - 20") SY     104,831.000 3.96027 2
105 2041 REMOVING STAB BASE AND ASPH PAV (8") SY     102,906.000 2.00000 1
105 2044 REMOVING STAB BASE AND ASPH PAV (10") SY     13,738.000 6.00000 1
105 2046 REMOVING STAB BASE & ASPH PAV (0" - 10") SY     14,225.000 2.00000 1
105 2049 REMOVING STAB BASE & ASPH PAV (4" - 22") SY     11,533.000 7.79000 1
105 2052 REMOVE STAB BASE & ASPH PAV (4" - 5") SY     521.000 7.00000 1
105 2060 REMOVING STAB BASE & ASPH PAV (15" - 20" SY     675.000 12.50000 1
105 2061 REMOV STAB BASE & ASPH PAV (8" - 20") SY     2,102.000 4.35000 1
105 2070 REMOVING STAB BASE & ASPH PAV (6" - 8" SY     112,165.000 2.25000 1
105 2075 REMOV STAB BASE AND ASPH PAV (10" - 18") SY     130,028.000 2.00000 1
105 2079 REMOVING STAB BASE & ASPH PAV (4" - 12") SY     958.300 3.84999 1
105 2081 REMOV STAB BASE & ASPH PAV (4" - 14") SY     75,653.000 3.00000 1
106 2001 OBLITERATING ABANDONED ROAD STA 13.000 670.00000 37.900 477.96834 4
110 2001 EXCAVATION (ROADWAY) CY 7,439.620 2.89160 2,415,146.720 4.30349 24
110 2002 EXCAVATION (CHANNEL) CY     7,021.000 7.78365 6
110 2003 EXCAVATION (SPECIAL) CY     34,218.000 5.67411 2
110 2004 EXCAVATION (ROADWAY AND CHANNEL) CY 8,726.000 8.30000 12,744.000 8.83599 2
112 2001 SUBGRADE WIDENING (ORD COMP) STA     552.000 116.00000 1
112 2002 SUBGRADE WIDENING (DENS CONT) STA     9.000 958.10000 1
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     30,918.000 8.75000 1
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY 191.780 25.00000 2,348.780 13.95610 4
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 20,844.000 8.63943 660,087.330 4.20953 15
132 2019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     390.000 21.76923 2
132 2025 EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY     1,143,697.990 3.64332 7
132 2026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY     102,814.250 14.22978 11
132 2031 EMBANKMENT (FINAL) (DENS CONT) (TY C3) CY     33,805.420 39.95824 2
134 2001 BACKFILL (TY A) STA 60.000 275.00000 1,937.840 194.38269 6
134 2002 BACKFILL (TY B) STA     3.000 1,000.00000 1
134 2004 BACKFILL (TY A OR B) STA 391.160 106.21229 1,889.670 108.39928 7
150 2001 BLADING STA 310.160 50.00000 813.010 58.76902 4
152 2001 ROAD GRADER WORK (ORD COMP) STA     995.660 158.98865 2
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     25,588.000 2.01266 2
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY     18,129.000 4.50000 1
160 2005 FURNISHING AND PLACING TOPSOIL CY     1,353.000 18.00000 1
160 2006 FURNISHING AND PLACING TOPSOIL (3") SY     4,742.800 3.00000 1
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY 144,309.760 1.41417 1,717,143.380 1.12497 15
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY 21,958.550 3.23771 21,958.550 3.23771 2
161 2006 COMPOST MANUF TOPSOIL (PB) CY     575.000 34.25000 1
161 2008 EROSION CONTROL COMPOST (2") SY 68,924.760 .50000 400,810.760 .68171 3
161 2014 COMPOST MANUF TOPSOIL (BOS OR PB) (4") SY 15,342.670 .75000 534,689.670 .92022 7
162 2001 SPOT SODDING SY     7.000 100.00000 1
162 2002 BLOCK SODDING SY 78,732.400 2.19949 659,464.500 2.26153 23
162 2006 BLOCK SODDING (OPT1) SY     260,187.000 1.68000 1
162 2007 BLOCK SODDING (OPT2) SY     38,892.000 4.35000 1
164 2015 STRAW / HAY MLCH SEED (PERM) (RURAL) (CLAY) SY     43,426.000 .46269 2
164 2019 STRAW / HAY MLCH SEED (PERM) (URBAN) (CLAY) SY     3,626.000 1.00000 1
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     259,133.000 .25973 3
164 2027 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) SY     494,011.000 .17924 4
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY     506,098.000 .17833 6
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY     461,098.000 .17984 5
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 68,924.760 .12000 509,085.760 .11679 5
164 2036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC 7.570 580.79921 7.570 580.79921 1
164 2039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY     377,886.000 .16725 4
164 2041 DRILL SEEDING (TEMP) (WARM) SY 75,385.000 .12000 446,289.000 .09801 12
164 2043 DRILL SEEDING (TEMP) (COOL) SY 75,835.000 .12000 443,810.000 .12330 11
164 2051 DRILL SEED (TEMP) (WARM OR COOL) SY 81,444.760 .10154 881,581.380 .09897 11
164 2057 CELL FBR MLCH SEED (PERM) (SPECIAL MIX) SY     493.200 .60000 1
164 2066 DRILL SEEDING (PERM) (WARM OR COOL) SY     685,598.000 .15000 1
166 2001 FERTILIZER AC     31.760 345.19647 2
168 2001 VEGETATIVE WATERING MG 18,010.200 6.90241 176,814.370 10.44776 39
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     64,026.000 .77449 6
169 2003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     4,919.000 2.61689 2
169 2008 SOIL RETENTION BLANKETS (CL 2) (TY H) SY     4,000.000 2.64000 1
170 2001 IRRIGATION SYSTEM LS     4.000 107,249.37500 4
170 2002 IRRIGATION SYSTEM (TY I) LS     1.000 45,000.00000 1
192 2001 PLANT MATERIAL (4" CNTR) EA     1,191.000 1.80000 1