ITEMS 500 2001 TO 560 2025
Items Items Bid Code Range
0100 - 0193
0247 - 0275
0310 - 0354
0400 - 0496
0500 - 0560
0610 - 0688
0712 - 0752
1012 - 1012
3224 - 3235
4574 - 4586
5049 - 5522
6007 - 6834
7611 - 7612
8020 - 8809
9011 - 9065
500 2001 - 560 2025
Item No Description Units January 31, 2012 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 2.000 67,500.00000 40.000 395,395.96200 40
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 2,434.00000 235.000 4,282.72468 39
502 2047 OFF - DUTY POLICE OFFICER HR     900.000 62.62778 6
502 2124 BARRICADES, SIGNS AND TRAFFIC HANDLING EA     32.000 .01000 1
502 2125 BARR, SIGNS & TRF HANDLING ALT 1X EA     1.000 4,428.00000 1
502 2126 BARR, SIGNS & TRF HANDLING ALT 2X EA     1.000 3,345.00000 1
502 2127 BARR, SIGNS & TRF HANDLING ALT 3X EA     1.000 3,883.00000 1
502 2128 BARR, SIGNS & TRF HANDLING ALT 4X EA     1.000 5,517.00000 1
506 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     11.000 155.00000 1
506 2003 ROCK FILTER DAMS (INSTALL) (TY 3) LF     40.000 76.00000 1
506 2005 ROCK FILTER DAMS (INSTALL) (TY 1) CY     16.000 30.00000 1
506 2006 ROCK FILTER DAMS (INSTALL) (TY 2) CY     19.000 114.12000 1
506 2009 ROCK FILTER DAMS (REMOVE) LF     40.000 23.00000 1
506 2010 ROCK FILTER DAMS (REMOVE) CY     46.000 50.76804 3
506 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     546.000 21.26429 6
506 2017 CONSTRUCTION EXITS (INSTALL) (TY 2) SY     472.000 22.66949 4
506 2019 CONSTRUCTION EXITS (REMOVE) SY     1,018.000 9.64409 10
506 2024 BACKHOE WORK (EROSION & SEDM CONT) HR     268.000 56.43903 6
506 2027 BLADING WORK (EROSION & SEDM CONT) HR     25.000 100.00000 1
506 2034 TEMPORARY SEDIMENT CONTROL FENCE LF     8,376.000 2.36449 10
506 2038 BIODEGRADABLE EROSION CONTROL LOGS (18" LF     1,200.000 6.00000 1
508 2002 CONSTRUCTING DETOURS SY     10,073.000 40.87785 3
512 2004 PORT CTB (FUR & INST) (SNGL SLP) (TY 1) LF     15,420.000 26.52607 2
512 2005 PORT CTB (FUR & INST) (SNGL SLP) (TY 2) LF     8,970.000 9.00000 1
512 2008 PORT CTB (FUR & INST) (LOW PROF) (TY 1) LF     2,760.000 10.55000 1
512 2009 PORT CTB (FUR & INST) (LOW PROF) (TY 2) LF     640.000 10.55000 1
512 2010 PORT CTB (DES SOURCE) (SAFETY SH) (TY 1) LF     360.000 15.41000 1
512 2013 PORT CTB (DES SOURCE) (SNGL SLP) (TY 1) LF     7,200.000 5.52000 1
512 2014 PORT CTB (DES SOURCE) (SNGL SLP) (TY 2) LF     4,680.000 6.80000 1
512 2019 PORT CTB (MOVE) (SAFETY SH) (TY 1) LF     900.000 4.30000 1
512 2022 PORT CTB (MOVE) (SNGL SLP) (TY 1) LF     16,080.000 3.67493 2
512 2023 PORT CTB (MOVE) (SNGL SLP) (TY 2) LF     11,670.000 4.50000 1
512 2026 PORT CTB (MOVE) (LOW PROF) (TY 1) LF     2,740.000 4.55000 1
512 2027 PORT CTB (MOVE) (LOW PROF) (TY 2) LF     400.000 4.55000 1
512 2032 PORT CTB (STKPL) (SNGL SLP) (TY 2) LF     4,680.000 6.50000 1
512 2037 PORT CTB (REMOVE) (SAFETY SH) (TY 1) LF     360.000 10.22000 1
512 2040 PORT CTB (REMOVE) (SNGL SLP) (TY 1) LF     22,620.000 3.82493 2
512 2041 PORT CTB (REMOVE) (SNGL SLP) (TY 2) LF     8,760.000 6.35000 1
512 2044 PORT CTB (REMOVE) (LOW PROF) (TY 1) LF     2,760.000 5.50000 1
512 2045 PORT CTB (REMOVE) (LOW PROF) (TY 2) LF     640.000 5.50000 1
514 2004 PERM CONC TRF BARR (SGL SLP) (TY 1) (42" LF     10,655.000 40.00000 1
514 2022 PERM CONC TRF BARR (SGL SLP) (TY 4) (42" LF     510.000 90.00000 1
528 2001 COLORED TEXTURED CONC (4") SY     35.000 100.00000 1
529 2001 CONC CURB (TY I) LF     3,416.000 11.35000 1
529 2002 CONC CURB (TY II) LF     18.000 24.00000 1
529 2004 CONC CURB & GUTTER (TY II) LF     5,165.000 15.72836 2
529 2010 CONC CURB AND GUTTER (TY II) (REINF) LF     9,697.000 13.20000 1
529 2016 CONC CURB (TY F) LF     42.000 26.00000 1
529 2018 CONC CURB (MONO) (TY II) (SPECIAL) LF     526.000 10.70000 1
529 2023 CONC CURB (MONO) LF     188.000 21.00000 1
530 2003 INTERSECTIONS (SURF TREAT) EA     32.000 505.46875 2
530 2005 INTERSECTIONS (ACP) SY     1,964.000 8.36000 1
530 2006 INTERSECTIONS (SURF TREAT) SY     2,037.000 24.30633 3
530 2008 DRIVEWAYS (ACP) EA     2.000 65,000.00000 1
530 2010 DRIVEWAYS (CONC) SY     6,294.000 49.52884 7
530 2011 DRIVEWAYS (ACP) SY     9,170.000 26.98102 5
530 2012 DRIVEWAYS (SURF TREAT) SY     8,296.000 24.59591 7
530 2015 TURNOUTS (SURF TREAT) EA     77.000 1,614.93506 2
530 2017 TURNOUTS (ACP) SY 6,630.000 13.65000 22,455.000 22.88136 10
530 2018 TURNOUTS (SURF TREAT) SY     2,827.000 24.36994 5
531 2005 CURB RAMPS (TY 1) EA     7.000 2,035.71429 2
531 2006 CURB RAMPS (TY 2) EA     3.000 1,966.66667 2
531 2009 CURB RAMPS (TY 6) EA     4.000 990.00000 1
531 2011 CURB RAMPS (TY 8) EA     9.000 1,009.00000 1
531 2015 CONC SIDEWALKS (4") SY     3,538.000 35.83861 3
531 2024 CONC SIDEWALK (5") SY     4,658.000 43.01760 3
531 2034 CONC SIDEWALK (DRAIN) LF     33.000 408.78788 2
531 2035 CONCRETE SIDEWALKS (5') (4") LF     90.000 30.00000 1
531 2040 CURB RAMPS (TY 5) EA     2.000 2,230.00000 1
531 2041 CURB RAMPS (TY 10) EA     8.000 1,500.00000 1
531 2048 CURB RAMPS (TY 11) MOD EA     2.000 1,500.00000 1
531 2054 CURB RAMPS SY     14.000 115.00000 1
531 2067 CURB RAMPS (TY 1) SY     13.000 115.00000 1
531 2068 CURB RAMPS (TY 2) SY     117.000 115.00000 1
531 2069 CURB RAMPS (TY 4) SY     16.000 115.00000 1
531 2070 CURB RAMPS (TY 5) SY     18.000 115.00000 1
531 2071 CURB RAMPS (TY 7) SY     11.000 340.00000 1
531 2075 CURB RAMPS (TY 11) SY     75.000 115.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF 184,542.000 .12000 231,679.000 .14959 3
536 2002 CONC MEDIAN SY     95.000 109.00000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF 3,700.000 15.50000 12,650.000 17.61986 9
540 2005 TERMINAL ANCHOR SECTION EA 28.000 455.00000 28.000 455.00000 1
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 8.000 1,630.00000 32.000 1,432.96875 6
540 2013 MTL BEAM GD FEN TRANS (T101) EA 8.000 909.00000 52.000 802.61538 6
540 2025 TERMINAL ANCHOR SECTION (DRWY) (SPCL) EA     4.000 625.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF 3,700.000 1.35000 12,103.000 3.12646 9
542 2002 REMOVING TERMINAL ANCHOR SECTION EA 20.000 69.50000 62.000 144.48387 7
544 2002 GUARDRAIL END TREATMENT (MOVE & RESET) EA 2.000 562.00000 2.000 562.00000 1
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA 26.000 295.00000 41.000 294.53659 5
544 2005 GDRAIL END TRT (INST) (WOOD POST) (TY II) EA 26.000 2,273.00000 101.000 2,148.49980 10
545 2001 CRASH CUSH ATTEN (INSTL) EA     5.000 16,956.00000 2
545 2002 CRASH CUSH ATTEN (MOVE & RESET) EA     8.000 3,618.12500 2
545 2003 CRASH CUSH ATTEN (REMOVE) EA     1.000 1,067.00000 1
545 2046 CRASH CUSH ATTEN (INSTAL) (ABSORB 350) EA     4.000 800.82000 1
545 2047 CRASH CUSH ATTEN (MOV & RESET) (ABSORB 350 EA     7.000 841.68000 1
545 2048 CRASH CUSH ATTEN (REMOVE) (ABSORB 350) EA     7.000 471.37000 1
545 2049 CRASH CUSH ATTEN (INSTL) (WORK ZONE) EA     8.000 10,000.00000 1
545 2050 CRASH CUSH ATTEN (MOV & RESET) (WORK ZONE) EA     1.000 2,000.00000 1
545 2051 CRASH CUSH ATTEN (REMOVE) (WORK ZONE) EA     9.000 1,000.00000 1
545 2058 CRASH CUSH ATTEN (INSTL) (N) EA     4.000 15,000.00000 1
545 2059 CRASH CUSH ATTEN (MOVE & RESET) (N) EA     6.000 2,000.00000 1
545 2060 CRASH CUSH ATTEN (REMOVE) (N) EA     1.000 1,000.00000 1
552 2001 WIRE FENCE (TY A) LF     150.000 10.00000 1
552 2003 WIRE FENCE (TY C) LF     190.000 4.46000 1
552 2005 GATE (TY 1) EA     1.000 330.53000 1
560 2006 MAILBOX INSTALL - S (RR - POST) TY 4 FND - T EA     69.000 211.52174 4
560 2007 MAILBOX INSTALL - D (TWW - POST) TY 4 FND - T EA     3.000 225.00000 1
560 2008 MAILBOX INSTALL - M (TWW - POST) TY 4 FND - T EA     10.000 500.00000 1
560 2010 MAILBOX INSTALL - S (TWG - POST) TY 1 FND EA     1.000 405.00000 1
560 2015 MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB EA     1.000 160.00000 1
560 2022 MAILBOX INSTALL - D (TWG - POST) TY 2 FND - TB EA     1.000 195.00000 1
560 2023 MAILBOX INSTALL - M (TWG - POST) TY 2 FND - TB EA     1.000 345.00000 1
560 2025 MAILBOX INSTALL - D (RR - POST) TY 4 FND - T EA     15.000 295.00000 2
 