Item No Description Units May 31, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
5049 2003 BIODGRD EROSION CONTROL LOGS (12" DIA) LF     106.000 5.00000 1
5049 2004 BIOGRD EROSN CONT LOGS (12" OR 18" DIA LF     16,468.000 4.16553 7
5367 2001 CABLE BARRIER SYSTEM (TL - 3) LF     76,862.000 5.43000 1
5367 2005 CABLE BARRIER SYSTEM (TL - 3) (10' - 0") LF     6,750.000 7.04000 1
5367 2007 CABLE BARRIER TERMINAL SECTION (TL - 3) EA     36.000 2,000.00000 1
5561 2001 SAFETY REST AREA LS     1.000 8,250,000.00000 1