| AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - BROWNWOOD DISTRICT | ||||
| Last Update: Tuesday, November 24, 2009 |
| ITEMS 500 2001 TO 560 2012 |
| Items | Items | Bid Code Range |
|---|---|---|
| 0100 - 0169 0204 - 0260 0310 - 0368 0400 - 0496 0500 - 0560 0610 - 0685 0784 - 0784 |
3145 - 3145 4360 - 4457 5049 - 5612 6055 - 6834 8251 - 8251 |
500 2001 - 560 2012 |
| Item No | Description | Units | November 30, 2009 | Twelve Month Moving | Usage | ||
|---|---|---|---|---|---|---|---|
| Quantity | Avg Bid | Quantity | Avg Bid | ||||
| 500 2001 | MOBILIZATION | LS | 1.000 | .01000 | 8.000 | 182,324.72750 | 8 |
| 502 2001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 3.000 | .01000 | 75.000 | 2,653.45373 | 8 |
| 506 2002 | ROCK FILTER DAMS (INSTALL) (TY 2) | LF | 20.000 | 12.23000 | 1 | ||
| 506 2024 | BACKHOE WORK (EROSION & SEDM CONT) | HR | 178.000 | 49.17416 | 5 | ||
| 506 2026 | FRNT END LOADER WORK (ERSN & SEDM CONT | HR | 12.000 | 65.00000 | 1 | ||
| 506 2027 | BLADING WORK (EROSION & SEDM CONT) | HR | 39.000 | 46.67000 | 1 | ||
| 506 2032 | SANDBAGS FOR EROSION CONTROL (18") | LF | 2,400.000 | 3.36000 | 1 | ||
| 506 2033 | SANDBAGS FOR EROSION CONTROL (2') | LF | 56.000 | 20.00000 | 1 | ||
| 506 2034 | TEMPORARY SEDIMENT CONTROL FENCE | LF | 3,065.000 | 2.77388 | 3 | ||
| 506 2038 | BIODEGRADABLE EROSION CONTROL LOGS (18" | LF | 500.000 | 7.00000 | 1 | ||
| 506 2040 | TEMP SEDIMENT CONTROL FENCE (REMOVE) | LF | 1,000.000 | 1.00000 | 1 | ||
| 508 2001 | CONSTRUCTING DETOURS | STA | 15.600 | 12,000.00000 | 1 | ||
| 512 2011 | PORT CTB (DES SOURCE) (SAFETY SH) (TY 2) | LF | 16,860.000 | 2.00000 | 1 | ||
| 512 2020 | PORT CTB (MOVE) (SAFETY SH) (TY 2) | LF | 16,800.000 | 2.00000 | 1 | ||
| 512 2029 | PORT CTB (STKPL) (SAFETY SH) (TY 2) | LF | 16,860.000 | 2.00000 | 1 | ||
| 529 2027 | CONC CURB (MONO) (TY I) (MOD) | LF | 997.000 | 11.04000 | 1 | ||
| 529 2059 | CONC CURB & GUTTER (TY I) (MOD) | LF | 844.000 | 18.84716 | 2 | ||
| 529 2075 | CONC CURB (TY 1) (MOD) | LF | 687.000 | 21.00000 | 1 | ||
| 530 2012 | DRIVEWAYS (SURF TREAT) | SY | 9,583.000 | 11.25087 | 2 | ||
| 530 2018 | TURNOUTS (SURF TREAT) | SY | 114.000 | 15.69000 | 1 | ||
| 533 2001 | SHOULDER TEXTURING (MILLED) | STA | 657.400 | 8.00000 | 1 | ||
| 533 2003 | SHOULDER TEXTURING (MILLED) | LF | 60,328.000 | .20000 | 1 | ||
| 540 2001 | MTL W - BEAM GD FEN (TIM POST) | LF | 8,869.000 | 12.46481 | 3 | ||
| 540 2002 | MTL W - BEAM GD FEN (STEEL POST) | LF | 206.000 | 24.18000 | 1 | ||
| 540 2005 | TERMINAL ANCHOR SECTION | EA | 17.000 | 552.05882 | 3 | ||
| 540 2011 | MTL BEAM GD FEN TRANS (THRIE - BEAM) | EA | 16.000 | 1,331.53000 | 2 | ||
| 540 2012 | MTL BEAM GD FEN TRANS (TL2) | EA | 4.000 | 800.00000 | 1 | ||
| 540 2031 | MTL BM GD FN (REMOVE & RESET) | LF | 3,100.000 | 5.00000 | 1 | ||
| 540 2032 | MTL BM GD FN TRANSITION (REMOVE & RESET) | EA | 11.000 | 950.00000 | 1 | ||
| 542 2001 | REMOVING METAL BEAM GUARD FENCE | LF | 9,610.000 | 1.32646 | 3 | ||
| 542 2002 | REMOVING TERMINAL ANCHOR SECTION | EA | 33.000 | 123.01515 | 3 | ||
| 542 2003 | RM MTL BM GD FEN TRANS (THRIE - BEAM) | EA | 8.000 | 341.25000 | 1 | ||
| 544 2001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 24.000 | 2,004.58333 | 2 | ||
| 544 2002 | GUARDRAIL END TREATMENT (MOVE & RESET) | EA | 28.000 | 692.50000 | 2 | ||
| 544 2003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 18.000 | 89.44444 | 2 | ||
| 544 2006 | GDRAIL END TRT (INST) (WOOD POST) (TY III | EA | 14.000 | 2,050.00000 | 1 | ||
| 552 2003 | WIRE FENCE (TY C) | LF | 768.000 | 11.21094 | 2 | ||
| 556 2010 | PIPE UNDERDRAINS (TY 5, 6, 7 OR 8) (6") | LF | 2,250.000 | 12.07200 | 3 | ||
| 560 2006 | MAILBOX INSTALL - S (RR - POST) TY 4 FND - T | EA | 34.000 | 113.26559 | 2 | ||
| 560 2009 | MAILBOX INSTALL - M (TWG - POST) TY 1 FND | EA | 5.000 | 324.31000 | 1 | ||
| 560 2012 | MAILBOX INSTALL - D (TWG - POST) TY 1 FND | EA | 2.000 | 171.13000 | 1 | ||
| | ||||
|