Item No Description Units May 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 6001 MOBILIZATION LS 3.000 576,666.66667 14.000 304,022.49786 14
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 48.000 4,000.00000 136.000 4,014.03449 12
502 6025 BARR, SIGNS, TRAFFIC HANDLING EA     14.000 7,285.71429 2
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 210.000 35.00000 280.000 33.03571 4
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 160.000 33.75000 337.000 31.78042 3
506 6006 ROCK FILTER DAMS (INSTALL) (TY 1) CY     24.000 75.00000 2
506 6011 ROCK FILTER DAMS (REMOVE) LF 370.000 16.86486 567.000 15.97002 5
506 6012 ROCK FILTER DAMS (REMOVE) CY     24.000 14.58333 2
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     500.000 20.00000 1
506 6024 CONSTRUCTION EXITS (REMOVE) SY     500.000 6.00000 1
506 6035 SANDBAGS FOR EROSION CONTROL EA 970.000 15.00000 970.000 15.00000 1
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 4,710.000 3.97505 37,208.000 3.15417 11
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 4,710.000 1.56582 37,208.000 .83493 11
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 2,280.000 6.50000 9,060.000 6.53549 7
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 445.000 6.50000 605.000 8.74793 2
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 2,725.000 3.00000 9,665.000 1.60838 9
508 6001 CONSTRUCTING DETOURS SY     2,337.000 53.97047 2
512 6063 PORT CTB (MOVE) (SAFETY SH) (TY 2) LF     4,630.000 5.64795 2
512 6065 PORT CTB (DES SOURCE) (SAFETY SH) (TY 2 LF     7,020.000 8.83761 2
512 6079 PORT CTB (STKPL) (SAFETY SH) LF     7,020.000 8.29915 2
529 6008 CONC CURB & GUTTER (TY II) LF 9,075.000 30.80000 9,075.000 30.80000 1
529 6014 CONC CURB (MOD) (TYPE I) LF 561.000 48.00000 561.000 48.00000 1
530 6001 INTERSECTIONS (CONC) SY 181.000 137.50000 181.000 137.50000 1
530 6002 INTERSECTIONS (ACP) SY 4,314.000 45.00000 5,157.000 46.63467 2
530 6003 INTERSECTIONS (SURF TREAT) SY 1,707.000 22.00000 2,565.000 24.34152 2
530 6004 DRIVEWAYS (CONC) SY 6,837.000 110.00000 7,580.000 107.54947 2
530 6005 DRIVEWAYS (ACP) SY 4,878.000 45.00000 5,204.000 45.31322 2
530 6006 DRIVEWAYS (SURF TREAT) SY 1,617.000 22.00000 7,929.000 20.80388 4
530 6007 TURNOUTS (CONC) SY 278.000 143.00000 278.000 143.00000 1
530 6008 TURNOUTS (ACP) SY 53.300 45.00000 53.300 45.00000 1
530 6009 TURNOUTS (SURF TREAT) SY     384.000 26.30729 2
531 6001 CONC SIDEWALKS (4") SY 5,668.000 77.00000 5,668.000 77.00000 1
531 6003 CONC SIDEWALKS (6") SY 24.000 110.00000 24.000 110.00000 1
531 6013 CURB RAMPS (TY 10) EA 50.000 3,300.00000 50.000 3,300.00000 1
540 6001 MTL W - BEAM GD FEN (TIM POST) LF 450.000 23.55556 8,088.500 22.11247 9
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF     650.000 70.00000 1
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     15.000 1,668.00000 2
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 4.000 1,400.00000 24.000 995.83333 3
540 6014 SHORT RADIUS LF     49.400 25.54251 2
540 6015 DRIVEWAY TERMINAL ANCHOR SECTION EA     3.000 920.00000 2
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 2,000.00000 5.000 1,360.00000 2
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF 200.000 27.00000 1,000.000 26.90000 4
540 6023 MTL BEAM GD FEN TRANS (THRIE BEAM) 28" EA     1.000 1,500.00000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF     2,375.000 4.71579 3
542 6002 REMOVE TERMINAL ANCHOR SECTION EA     16.000 150.00000 1
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 11.000 2,900.00000 103.000 2,319.41748 8
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA     4.000 270.00000 1
544 6004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     19.000 2,500.00000 2
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA     13.000 2,046.15385 2
545 6005 CRASH CUSH ATTEN (REMOVE) EA     10.000 1,340.00000 2
545 6019 CRASH CUSH ATTEN (INSTL) (S) (N) (TL3) EA     10.000 8,700.00000 2
550 6003 CHAIN LINK FENCE (REMOVE) LF 64.000 25.00000 64.000 25.00000 1
552 6003 WIRE FENCE (TY C) LF 949.000 20.00000 6,884.000 15.47995 5
552 6008 WIRE FENCE (WATER GAP) LF     214.000 25.00000 2
556 6008 PIPE UNDERDRAINS (TY 8) (6") LF     1,040.000 27.00000 1
560 6004 MAILBOX INSTALL - S (TWG - POST) TY 2 EA 38.000 225.00000 38.000 225.00000 1
560 6005 MAILBOX INSTALL - D (TWG - POST) TY 2 EA 2.000 250.00000 2.000 250.00000 1
560 6006 MAILBOX INSTALL - M (TWG - POST) TY 2 EA     1.000 300.00000 1
560 6007 MAILBOX INSTALL - S (WC - POST) TY 3 EA 7.000 250.00000 33.000 262.53030 5
560 6008 MAILBOX INSTALL - D (WC - POST) TY 3 EA     2.000 315.00000 2
560 6018 MAILBOX INSTALL - M (TWW - POST) TY 7 EA 1.000 450.00000 1.000 450.00000 1