| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | GRIMES |
| Highway |
SH 90 |
| From |
1.5 MILES NORTH OF SH 30 |
| To |
SH 30 |
| CSJ |
0315-03-054 |
| Proj ID |
STP 2012(561) |
| Work Type |
REHABILITATE EXISTING ROAD |
| |
|
1.486 |
1534029.40 |
0.00 |
1364349.20 |
88.9 |
| Work Order |
07-12-12 |
| Work Began |
08-07-12 |
| Work Completed |
|
| Time Computed |
08-07-12 |
| Contract Working Days |
65 |
| Addl Days Granted |
0 |
| Working Days Charged |
57 |
| Percent Time Used |
87 |
| Contractor(s) |
| BIG CREEK CONSTRUCTION, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0315-03-054 AMERICAN REMEDIATION OPTIONS, INC. (3.12%) ROADSAFE TRAFFIC SYSTEMS, INC. (1.92%)
|
| Contract # |
05123023 |
|
Totals |
1534029.40 |
0.00 |
1364349.20 |
88.9 |
|
| County | GRIMES |
| Highway |
SH 105 |
| From |
THE NAVASOTA CITY LIMITS |
| To |
0.355 MILE W. OF THE MONTGOMERY CL |
| CSJ |
0338-01-054 |
| Proj ID |
STP 2013(058)SB |
| Work Type |
REHABILITATION OF EXISTING ROAD |
| |
|
16.487 |
6821958.57 |
2750.00 |
2750.00 |
0.0 |
| Work Order |
12-14-12 |
| Work Began |
04-22-13 |
| Work Completed |
|
| Time Computed |
04-22-13 |
| Contract Working Days |
141 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| KNIFE RIVER CORPORATION - SOUTH |
SUBCONTRACTOR(S) FOR CCSJ: 0338-01-054 N-LINE TRAFFIC MAINTENANCE, L.P. (0.10%) CEN TEX HYDROSEED, INC.(0.49%) PEDRO CARLOS CONSTRUCTION CO.(1.51%) ROADWAY SPECIALTIES, INC.(1.66%) JEFFERY BAILEY TRUCKING, INC.(0.00%) D. I. J. CONSTRUCTION, INC.(1.94%) SCR CONSTRUCTION CO., INC. (0.50%) WEST TEXAS RUMBLE STRIP(0.52%) ROADSAFE TRAFFIC SYSTEMS, INC. (0.19%) LONE STAR HIGHWAY PRODUCTS, INC. (0.00%)
|
| Contract # |
09123215 |
|
Totals |
6821958.57 |
2750.00 |
2750.00 |
0.0 |
|
| County | FREESTONE |
| Highway |
FM 27 |
| From |
AT TEHUACANA CREEK |
| To |
AND RELIEF STRUCTURE |
| CSJ |
0456-01-044 |
| Proj ID |
BR 2013(526) |
| Work Type |
GRADING, STRUCTURE, BASE AND SURF |
| |
|
0.459 |
2127943.49 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
135 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ELLIS-MCGINNIS CONSTRUCTION CO. |
SUBCONTRACTOR(S) FOR CCSJ: 0456-01-044 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133215 |
|
Totals |
2127943.49 |
0.00 |
0.00 |
0.0 |
|
| County | FREESTONE |
| Highway |
FM 488 |
| From |
AT COTTONWOOD CREEK |
| To |
(TEHUACANA CREEK RELIEF) |
| CSJ |
0459-01-040 |
| Proj ID |
BR 2012(675) |
| Work Type |
REPLACE EXISTING BRIDGE FACILITY |
| |
|
0.318 |
2246127.80 |
155322.15 |
1426440.19 |
63.5 |
| Work Order |
09-17-12 |
| Work Began |
10-23-12 |
| Work Completed |
|
| Time Computed |
10-23-12 |
| Contract Working Days |
150 |
| Addl Days Granted |
2 |
| Working Days Charged |
100 |
| Percent Time Used |
65 |
| Contractor(s) |
| COPPELL CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0459-01-040 A. L. HELMCAMP, INC. ( 16.88%) TOTAL HIGHWAY MAINTENANCE, LLC (0.93%) SOUTHWEST ENVIRONMENT SERVICES LLC (1.08%) HOUSTON SAWING & DRILLING(0.14%) FORTSON CONTRACTING, INC.(1.68%) N-LINE TRAFFIC MAINTENANCE, L.P. (0.27%) M & D FOUNDATION DRILLING INDUSTRIES, INC. (6.09%) MESA ROD BUSTERS, INC. (0.28%)
|
| Contract # |
08123016 |
|
Totals |
2246127.80 |
155322.15 |
1426440.19 |
63.5 |
|
| County | BRAZOS |
| Highway |
FM 60 |
| From |
SH 6 |
| To |
FM 158 |
| CSJ |
0506-01-082 |
| Proj ID |
STP 2004(74) |
| Work Type |
GRADING, STRUCTURES, BASE AND SURFA |
| |
|
1.747 |
7633962.49 |
145111.79 |
2658776.09 |
34.8 |
| Work Order |
07-23-12 |
| Work Began |
08-04-12 |
| Work Completed |
|
| Time Computed |
08-04-12 |
| Contract Working Days |
296 |
| Addl Days Granted |
0 |
| Working Days Charged |
133 |
| Percent Time Used |
44 |
| Contractor(s) |
| KNIFE RIVER CORPORATION - SOUTH |
SUBCONTRACTOR(S) FOR CCSJ: 0506-01-082 JEFFERY BAILEY TRUCKING, INC.(1.17%) BAYER CONSTRUCTION ELECTRICAL CONTRACTORS, INC.(3.69%) FLASHER EQUIPMENT COMPANY(0.73%) KELLYSTONE, INC(1.12%) TEX OP CONSTRUCTION, LP(0.39%) N-LINE TRAFFIC MAINTENANCE, L.P. (0.36%) HEMPHILL PILE DRIVING CO., A CORP. (0.96%) ROADWAY SPECIALTIES, INC.(0.38%) CEN TEX HYDROSEED, INC.(0.95%) WEBBER-BALKE FOUNDATION COMPANY, INC.(0.97%) MESA ROD BUSTERS, INC. (0.73%)
|
| Contract # |
05123205 |
|
Totals |
7633962.49 |
145111.79 |
2658776.09 |
34.8 |
|
| County | BRAZOS |
| Highway |
FM 60 |
| From |
WELLBORN ROAD |
| To |
TAUBER STREET |
| CSJ |
0506-01-091 |
| Proj ID |
NH 1102(429) |
| Work Type |
REHABILITATION OF EXISTING ROAD |
| |
|
0.327 |
3692019.96 |
1467.00 |
4236758.55 |
99.9 |
| Work Order |
10-07-11 |
| Work Began |
11-07-11 |
| Work Completed |
|
| Time Computed |
10-23-11 |
| Contract Working Days |
120 |
| Addl Days Granted |
50 |
| Working Days Charged |
159 |
| Percent Time Used |
93 |
| Contractor(s) |
| KNIFE RIVER CORPORATION - SOUTH |
SUBCONTRACTOR(S) FOR CCSJ: 0506-01-091 HIGHWAY TECHNOLOGIES, INC. (1.77%) CEN TEX HYDROSEED, INC.(1.67%) N-LINE TRAFFIC MAINTENANCE, L.P. (1.07%) KELLYSTONE, INC(1.57%) WILLOW CITY SIGN & RAIL, INC.(0.54%) S & S BRIDGE PAINTING, INC.(0.11%) DUSTROL, INC.(1.41%) BAYER CONSTRUCTION ELECTRICAL CONTRACTORS, INC.( 13.20%) EROSION PREVENTION PRODUCTS(0.31%) M & D FOUNDATION DRILLING INDUSTRIES, INC. (0.31%) MESA ROD BUSTERS, INC. (0.02%) BOENIGK MASONRY(0.88%) MASTERS IRON WORKS (1.13%)
|
| Contract # |
08113016 |
|
Totals |
3692019.96 |
1467.00 |
4236758.55 |
99.9 |
|
| County | ROBERTSON |
| Highway |
FM 46 |
| From |
COLORADO STREET |
| To |
FM 979 (EAST) |
| CSJ |
0540-01-044 |
| Proj ID |
STP 2013(059)HRR |
| Work Type |
PROVIDE ADDITIONAL PAVEMENT WIDTH |
| |
|
12.537 |
3105423.29 |
482427.21 |
1839445.15 |
59.2 |
| Work Order |
11-01-12 |
| Work Began |
11-12-12 |
| Work Completed |
|
| Time Computed |
11-17-12 |
| Contract Working Days |
169 |
| Addl Days Granted |
0 |
| Working Days Charged |
97 |
| Percent Time Used |
57 |
| Contractor(s) |
| GLENN FUQUA, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0540-01-044 CEN TEX HYDROSEED, INC.(1.75%) ROADSAFE TRAFFIC SYSTEMS, INC. (4.41%) J & M CONTRACTING, COMPANY (8.51%) N-LINE TRAFFIC MAINTENANCE, L.P. (0.00%) PLANTERSVILLE WATER SERVICES, INC. (1.33%)
|
| Contract # |
09123222 |
|
Totals |
3105423.29 |
482427.21 |
1839445.15 |
59.2 |
|
| County | MILAM |
| Highway |
FM 486 |
| From |
AT SAN GABRIEL RIVER |
| To |
. |
| CSJ |
0590-05-027 |
| Proj ID |
BR 2012(706) |
| Work Type |
GR, STRS, BASE AND SURFACE |
| |
|
0.176 |
1943618.46 |
188862.19 |
767525.00 |
39.4 |
| Work Order |
09-24-12 |
| Work Began |
10-31-12 |
| Work Completed |
|
| Time Computed |
10-10-12 |
| Contract Working Days |
263 |
| Addl Days Granted |
0 |
| Working Days Charged |
38 |
| Percent Time Used |
14 |
| Contractor(s) |
| JAMES CONSTRUCTION GROUP, L.L.C. |
SUBCONTRACTOR(S) FOR CCSJ: 0590-05-027 N-LINE TRAFFIC MAINTENANCE, L.P. (0.34%) RICE ENVIRONMENTAL SERVICES(0.49%) D. I. J. CONSTRUCTION, INC.(0.75%) PRIMATE CONSTRUCTION, INC. (0.34%) S & S BRIDGE PAINTING, INC.(0.17%) ENVIRONMENTAL SAFETY SERVICES, INC.(7.07%) WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.98%) GK CONSTRUCTION, LLC (1.08%) BEAIRD DRILLING(3.67%) JOY LATTIMER, LLC. (0.00%) PANTHER CREEK TRANSPORTATION, INC. (0.00%) PANTHER CREEK TRANSPORTATION, INC. (0.87%)
|
| Contract # |
08123227 |
|
Totals |
1943618.46 |
188862.19 |
767525.00 |
39.4 |
|
| County | FREESTONE |
| Highway |
IH 45 |
| From |
THE LEON COUNTY LINE |
| To |
US 84 |
| CSJ |
0675-02-070 |
| Proj ID |
IM 0452(139) |
| Work Type |
HMA OVERLAY |
| |
|
17.316 |
2217971.87 |
917815.93 |
917815.93 |
41.3 |
| County | FREESTONE |
| Highway |
IH 45 |
| From |
THE LEON COUNTY LINE |
| To |
US 84 |
| CSJ |
0675-02-074 |
| Proj ID |
IM 0452(139) |
| Work Type |
OVERLAY (REHABILITATION) |
| |
|
17.316 |
3011426.00 |
2667946.75 |
2667946.75 |
88.5 |
| Work Order |
03-19-13 |
| Work Began |
04-05-13 |
| Work Completed |
|
| Time Computed |
04-05-13 |
| Contract Working Days |
41 |
| Addl Days Granted |
0 |
| Working Days Charged |
15 |
| Percent Time Used |
36 |
| Contractor(s) |
| BIG CREEK CONSTRUCTION, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0675-02-070 COWBELL TRAFFIC SERVICES, INC. (0.61%) N-LINE TRAFFIC MAINTENANCE, L.P. (0.15%) PRIMATE CONSTRUCTION, INC. (0.80%) STRIPING TECHNOLOGY, L.P.(2.41%) FORTSON CONTRACTING, INC.(0.98%) POTTER TRUCKING(0.00%)
|
| Contract # |
01133011 |
|
Totals |
5229397.87 |
3585762.68 |
3585762.68 |
68.5 |
|
| County | WALKER |
| Highway |
IH 45 |
| From |
SH 75 (NORTH) |
| To |
SH 30 |
| CSJ |
0675-06-081 |
| Proj ID |
IM 0452(121) |
| Work Type |
CONVERT FRT RD TO ONE - WAY OPERATION |
| |
|
5.385 |
8711014.41 |
214315.99 |
6656398.42 |
76.4 |
| Work Order |
10-24-11 |
| Work Began |
01-02-12 |
| Work Completed |
|
| Time Computed |
01-02-12 |
| Contract Working Days |
437 |
| Addl Days Granted |
7 |
| Working Days Charged |
335 |
| Percent Time Used |
75 |
| Contractor(s) |
| SMITH & COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0675-06-081 SOUTHWEST ENVIRONMENT SERVICES LLC (0.70%) INTERSTATE BARRICADES & MARKINGS, INC. (1.71%) J & M CONTRACTING, COMPANY ( 29.97%) STRIPES & STOPS COMPANY, INC.(0.28%) THIRD COAST SERVICES, LLC(5.49%) WATERS CONSTRUCTION CO., INC.(1.92%) WILLOW CITY SIGN & RAIL, INC.(0.88%)
|
| Contract # |
09113204 |
|
Totals |
8711014.41 |
214315.99 |
6656398.42 |
76.4 |
|
| County | WALKER |
| Highway |
IH 45 |
| From |
SH 30 |
| To |
SH 75 |
| CSJ |
0675-06-100 |
| Proj ID |
IM 0452(140) |
| Work Type |
HMA OVERLAY |
| |
|
6.488 |
3088239.90 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
80 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| SMITH & COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0675-06-100 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05133238 |
|
Totals |
3088239.90 |
0.00 |
0.00 |
0.0 |
|
| County | WALKER |
| Highway |
FM 980 |
| From |
0.067 MILE NORTH OF LEIGH ANNE |
| To |
SH 19 |
| CSJ |
0756-02-027 |
| Proj ID |
STP 2013(060)HES |
| Work Type |
PROVIDE ADDITIONAL PAVEMENT WIDTH |
| |
|
13.328 |
4394843.38 |
0.00 |
2016468.15 |
45.8 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-18-12 |
| Work Began |
10-26-12 |
| Work Completed |
|
| Time Computed |
10-26-12 |
| Contract Working Days |
264 |
| Addl Days Granted |
11 |
| Working Days Charged |
110 |
| Percent Time Used |
40 |
| Contractor(s) |
| GLENN FUQUA, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0756-02-027 ROADSAFE TRAFFIC SYSTEMS, INC. (2.72%) BORING & TUNNELING COMPANY OF AMERICA, INC.(0.27%) BWF FREIGHT(4.69%) W.D.F. HAULING (2.34%) CEN TEX HYDROSEED, INC.(1.57%) J & M CONTRACTING, COMPANY (5.67%) PLANTERSVILLE WATER SERVICES, INC. (1.95%)
|
| Contract # |
09123046 |
|
Totals |
4394843.38 |
0.00 |
2016468.15 |
45.8 |
|
| County | MILAM |
| Highway |
CR |
| From |
ON CR 284 (LOCAL CR 405) |
| To |
AT DONAHOE CREEK |
| CSJ |
0917-12-068 |
| Proj ID |
BR 2010(948) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.138 |
461057.03 |
60935.34 |
456056.95 |
99.9 |
| Work Order |
10-18-12 |
| Work Began |
12-03-12 |
| Work Completed |
|
| Time Computed |
12-03-12 |
| Contract Working Days |
55 |
| Addl Days Granted |
0 |
| Working Days Charged |
63 |
| Percent Time Used |
114 |
| Contractor(s) |
| KNIFE RIVER CORPORATION - SOUTH |
SUBCONTRACTOR(S) FOR CCSJ: 0917-12-068 N-LINE TRAFFIC MAINTENANCE, L.P. (1.20%) M & D FOUNDATION DRILLING INDUSTRIES, INC. (8.90%) TEXAS ALTERNATIVE GRASSER, INC.(0.43%) ENVIRONMENTAL SAFETY SERVICES, INC.(2.55%) CP REBAR AND PT INSTALLATION (0.59%)
|
| Contract # |
09123036 |
|
Totals |
461057.03 |
60935.34 |
456056.95 |
99.9 |
|
| County | MILAM |
| Highway |
CR |
| From |
ON CR 355 (LOCAL CR 428) |
| To |
AT SAN GABRIEL RIVER |
| CSJ |
0917-12-069 |
| Proj ID |
BR 1102(536) |
| Work Type |
REHABILITATE HISTORIC BRIDGE |
| |
|
0.152 |
1272327.40 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
115 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ELLIS-MCGINNIS CONSTRUCTION CO. |
SUBCONTRACTOR(S) FOR CCSJ: 0917-12-069 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05133026 |
|
Totals |
1272327.40 |
0.00 |
0.00 |
0.0 |
|
| County | ROBERTSON |
| Highway |
CR |
| From |
ON CR 120 (WILDCAT BRIDGE ROAD) |
| To |
AT LITTLE BRAZOS RIVER |
| CSJ |
0917-18-024 |
| Proj ID |
BR 96(427) |
| Work Type |
REHABILITATE HISTORIC BRIDGE |
| |
|
0.135 |
1922884.95 |
191097.83 |
789055.05 |
41.0 |
| Work Order |
09-17-12 |
| Work Began |
11-27-12 |
| Work Completed |
|
| Time Computed |
11-27-12 |
| Contract Working Days |
333 |
| Addl Days Granted |
140 |
| Working Days Charged |
97 |
| Percent Time Used |
50 |
| Contractor(s) |
| DCI CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0917-18-024 N-LINE TRAFFIC MAINTENANCE, L.P. (0.33%) S & S BRIDGE PAINTING, INC.( 21.45%)
|
| Contract # |
08123033 |
|
Totals |
1922884.95 |
191097.83 |
789055.05 |
41.0 |
|
| County | ROBERTSON |
| Highway |
CR |
| From |
ON CR 316 (DOGWOOD CREEK ROAD) |
| To |
AT DOGWOOD CREEK |
| CSJ |
0917-18-073 |
| Proj ID |
BR 2010(949) |
| Work Type |
REPLACE EXISTING BRIDGE FACILITY |
| |
|
0.176 |
596511.81 |
245004.76 |
506978.09 |
84.9 |
| Work Order |
10-12-12 |
| Work Began |
01-18-13 |
| Work Completed |
|
| Time Computed |
01-12-13 |
| Contract Working Days |
79 |
| Addl Days Granted |
0 |
| Working Days Charged |
74 |
| Percent Time Used |
93 |
| Contractor(s) |
| HODGES AND SON CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0917-18-073 ROADSAFE TRAFFIC SYSTEMS, INC. (0.65%) DUSTIN ALLEN, INC. (3.82%) SPECIALTY DRILLING, LTD. (4.82%)
|
| Contract # |
09123039 |
|
Totals |
596511.81 |
245004.76 |
506978.09 |
84.9 |
|
| County | BRAZOS |
| Highway |
FM 1179 |
| From |
0.3 MILES EAST OF SH 6 |
| To |
KENT STREET |
| CSJ |
1316-01-034 |
| Proj ID |
STP 2012(562) |
| Work Type |
GR, STRUCT, WIDEN PAV, SIDEWALKS |
| |
|
1.550 |
4274625.20 |
524852.55 |
2624129.10 |
61.3 |
| County | BRAZOS |
| Highway |
FM 1179 |
| From |
0.3 MILES EAST OF SH 6 |
| To |
KENT STREET |
| CSJ |
1316-01-047 |
| Proj ID |
RW 1316-1-47 |
| Work Type |
ROW ACQ., UTL. ADJ.; RELOC. ASSIST. |
| |
|
0.001 |
436933.00 |
0.00 |
356327.69 |
81.5 |
| Work Order |
07-23-12 |
| Work Began |
09-10-12 |
| Work Completed |
|
| Time Computed |
09-10-12 |
| Contract Working Days |
178 |
| Addl Days Granted |
0 |
| Working Days Charged |
108 |
| Percent Time Used |
60 |
| Contractor(s) |
| KNIFE RIVER CORPORATION - SOUTH |
SUBCONTRACTOR(S) FOR CCSJ: 1316-01-034 BAYER CONSTRUCTION ELECTRICAL CONTRACTORS, INC.( 19.93%) WILLOW CITY SIGN & RAIL, INC.(0.27%) DUSTROL, INC.(0.65%) CEN TEX HYDROSEED, INC.(1.17%) N-LINE TRAFFIC MAINTENANCE, L.P. (3.31%) KELLYSTONE, INC(1.01%) ELLIOTT CONSTRUCTION, LLC(5.88%)
|
| Contract # |
05123214 |
|
Totals |
4711558.20 |
524852.55 |
2980456.79 |
63.2 |
|
| County | FREESTONE |
| Highway |
FM 1451 |
| From |
AT WASHBURN BRANCH |
| To |
. |
| CSJ |
1327-02-016 |
| Proj ID |
BR 2012(674) |
| Work Type |
REPLACEMENT OF EXISTING BRIDGE FACI |
| |
|
0.127 |
513444.27 |
97165.21 |
473254.31 |
92.1 |
| Work Order |
09-24-12 |
| Work Began |
01-21-13 |
| Work Completed |
|
| Time Computed |
12-23-12 |
| Contract Working Days |
75 |
| Addl Days Granted |
0 |
| Working Days Charged |
66 |
| Percent Time Used |
88 |
| Contractor(s) |
| KNIFE RIVER CORPORATION - SOUTH |
SUBCONTRACTOR(S) FOR CCSJ: 1327-02-016 SOUTHWEST ENVIRONMENT SERVICES LLC (1.12%) ROADSAFE TRAFFIC SYSTEMS, INC. (1.30%) WEBBER-BALKE FOUNDATION COMPANY, INC.(5.57%) FORTSON CONTRACTING, INC.(2.70%) HOUSTON SAWING & DRILLING(0.27%)
|
| Contract # |
08123219 |
|
Totals |
513444.27 |
97165.21 |
473254.31 |
92.1 |
|
| County | WALKER |
| Highway |
FM 1791 |
| From |
AT WEST SANDY CREEK |
| To |
. |
| CSJ |
1706-01-022 |
| Proj ID |
BR 1102(236) |
| Work Type |
GRADING, STRUCTURES, BASE AND SURF |
| |
|
0.431 |
1421556.83 |
7896.87 |
974190.60 |
68.5 |
| Work Order |
09-15-11 |
| Work Began |
08-06-12 |
| Work Completed |
|
| Time Computed |
12-14-11 |
| Contract Working Days |
128 |
| Addl Days Granted |
11 |
| Working Days Charged |
140 |
| Percent Time Used |
100 |
| Contractor(s) |
| FUQUA CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1706-01-022 HOUSTON SAWING & DRILLING(0.19%) BIG CREEK CONSTRUCTION, LTD. (4.92%) HEMPHILL PILE DRIVING CO., A CORP. (2.93%) HIGHWAY TECHNOLOGIES, INC. (0.99%) WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.72%)
|
| Contract # |
08113059 |
|
Totals |
1421556.83 |
7896.87 |
974190.60 |
68.5 |
|
| County | LEON |
| Highway |
FM 1469 |
| From |
AT STARRETT BRANCH |
| To |
. |
| CSJ |
1971-01-010 |
| Proj ID |
BR 2012(383) |
| Work Type |
GRADING, STRUCTURES, BASE AND SURFA |
| |
|
0.284 |
737617.60 |
18471.00 |
705860.20 |
95.6 |
| Work Order |
04-16-12 |
| Work Began |
08-06-12 |
| Work Completed |
|
| Time Computed |
07-15-12 |
| Contract Working Days |
134 |
| Addl Days Granted |
0 |
| Working Days Charged |
122 |
| Percent Time Used |
91 |
| Contractor(s) |
| BIG CREEK CONSTRUCTION, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 1971-01-010 CEN TEX HYDROSEED, INC.(0.14%) HEMPHILL PILE DRIVING CO., A CORP. (4.42%) PRIMATE CONSTRUCTION, INC. (0.89%) ROADSAFE TRAFFIC SYSTEMS, INC. (0.91%) SAN-ANN-CO., INC.(1.26%) FORTSON CONTRACTING, INC.(5.85%)
|
| Contract # |
03123015 |
|
Totals |
737617.60 |
18471.00 |
705860.20 |
95.6 |
|