AVERAGE LOW BID UNIT PRICE - MAINTENANCE - ATLANTA DISTRICT

Last Update: Monday, February 8, 2016
ITEMS 712 2005 TO 776 2035
Items Items Bid Code Range
0104 - 0169
0305 - 0361
0400 - 0496
0500 - 0545
0610 - 0690
0712 - 0776
3270 - 3270
4003 - 4003
5935 - 5935
6001 - 6834
7013 - 7013
8251 - 8942
712 2005 - 776 2035
Item No Description Units January 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     520.580 491.00000 1
712 6008 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     358.270 805.00000 1
712 6022 JT / CRCK SEAL (RUBBER ASPHALT) RAMPS LMI     22.500 805.00000 1
720 6003 SPALLING REPAIR (POLYMERIC) (SEMIRIGID GAL 5,000.000 50.00000 5,000.000 50.00000 1
730 6054 FULL - WIDTH MOWING - TRACT (1) AC     4,732.000 31.00000 1
730 6055 FULL - WIDTH MOWING - TRACT (2) AC     4,880.000 28.98000 1
730 6056 FULL - WIDTH MOWING - TRACT (3) AC     5,332.000 28.98000 1
730 6057 FULL - WIDTH MOWING - TRACT (4) AC     4,367.000 27.00000 1
730 6058 FULL - WIDTH MOWING - TRACT (5) AC     5,541.000 28.50000 1
730 6059 FULL - WIDTH MOWING - TRACT (6) AC     4,182.000 29.00000 1
730 6060 FULL - WIDTH MOWING - TRACT (7) AC     4,724.000 27.00000 1
730 6061 FULL - WIDTH MOWING - TRACT (8) AC     3,896.000 26.00000 1
730 6062 FULL - WIDTH MOWING - TRACT (9) AC     2,662.000 27.00000 1
730 6063 FULL - WIDTH MOWING - TRACT (10) AC     3,081.000 28.00000 1
730 6064 FULL - WIDTH MOWING - TRACT (11) AC     2,250.000 27.00000 1
730 6069 FULL - WIDTH MOWING - TRACT (16) AC     2,464.000 32.00000 1
730 6071 FULL - WIDTH MOWING - TRACT (18) AC     3,091.000 28.00000 1
735 6001 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES CYC     74.000 967.73500 2
751 6006 LITTER PICKUP CYC     24.000 1,819.00000 1
751 6008 MOWING, TRIMMING, AND EDGING CYC     24.000 1,719.00000 1
751 6011 PRUNING CYC     1.000 3,000.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA     4,520.000 49.53540 4
752 2023 TREE REMOVAL (12" - 18" DIA) EA     2,950.000 64.72881 4
752 2024 TREE REMOVAL (18" - 24" DIA) EA     2,430.000 92.44856 4
752 2025 TREE REMOVAL (24" - 30" DIA) EA     935.000 148.47594 4
752 2026 TREE REMOVAL (30" - 36" DIA) EA     516.000 282.99419 4
752 2027 TREE REMOVAL (36" - 42" DIA) EA     243.000 343.82716 4
752 2028 TREE REMOVAL (42" - 48" DIA) EA     172.000 445.05814 4
752 2029 TREE REMOVAL (48" - 60" DIA) EA     105.000 644.04762 4
752 2030 TREE REMOVAL (60" - 72" DIA) EA     66.000 827.27273 4
752 2045 STUMP REMOVAL EA     230.000 69.13043 4
752 2049 TREE TRIMMING (20' X 30') MI     175.200 1,763.41324 4
752 2057 TREE TRIMMING & BRUSH REMOVAL LF     6,000.000 4.00000 2
752 6005 TREE REMOVAL (4" - 12" DIA) EA 2,300.000 32.69565 2,300.000 32.69565 2
752 6006 TREE REMOVAL (12" - 18" DIA) EA 2,354.000 53.54376 2,354.000 53.54376 3
752 6007 TREE REMOVAL (18" - 24" DIA) EA 1,421.000 92.68121 1,421.000 92.68121 3
752 6008 TREE REMOVAL (24" - 30" DIA) EA 574.000 178.95470 574.000 178.95470 3
752 6009 TREE REMOVAL (30" - 36" DIA) EA 331.000 264.45619 331.000 264.45619 3
752 6010 TREE REMOVAL (36" - 42" DIA) EA 168.000 344.04762 168.000 344.04762 3
752 6011 TREE REMOVAL (42" - 48" DIA) EA 88.000 483.52273 88.000 483.52273 3
752 6012 TREE REMOVAL (48" - 60" DIA) EA 60.000 665.00000 60.000 665.00000 3
752 6013 TREE REMOVAL (60" - 72" DIA) EA 42.000 814.28571 42.000 814.28571 3
752 6014 STUMP REMOVAL EA 170.000 36.76471 170.000 36.76471 3
752 6021 TREE TRIMMING (20' X 30') MI 116.520 1,179.72022 116.520 1,179.72022 3
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     7,500.000 8.00000 1
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     25.000 1.00000 1
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     13.000 1.00000 1
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     700.000 14.00000 1
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     63.000 20.00000 1
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     5.000 1.00000 1
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     8.000 1.00000 1
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     90.000 100.00000 1
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     3,000.000 11.00000 1
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     300.000 38.00000 1
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     25.000 10.00000 1
771 6001 REPLACE POSTS (TL - 3) EA     3,200.000 69.55000 2
771 6003 CABLE SPLICE / TURNBUCKLE (TL - 3) EA     48.000 0.50000 2
771 6005 REPAIR CONCRETE FOUNDATION (TL - 3) EA     42.000 25.00000 2
771 6007 REPR OR REPLC CABLE BARR TERM SEC (TL - 3 EA     72.000 50.00000 2
771 6009 REPLACE CABLE (TL - 3) LF     8,000.000 0.50000 2
771 6011 CHECK / RE - TENSION CABLE EA     240.000 50.00000 2
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     150.000 4.00000 1
776 2011 REP METAL POST W / BASE PLATE (T101 RAIL EA     25.000 4.00000 1
776 2034 REPAIR (W - BEAM, TUBE & SPLICE - T101 RAIL) LF     300.000 6.00000 1
776 2035 REPAIR (W - BEAM - T101 RAIL) LF     1,500.000 3.00000 1