500 2001 - 544 2006
Item No Description Units March 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 2.000 118,946.62000 15.000 55,322.11467 12
500 2010 MOBILIZATION (PER CALL OUT) EA     78.000 1,711.53846 4
500 6033 MOBILIZATION (CALLOUT) EA 60.000 150.00000 120.000 150.00000 2
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 21.000 3,257.14286 133.000 2,003.00752 16
506 2034 TEMPORARY SEDIMENT CONTROL FENCE LF     944.000 3.00000 1
529 2002 CONC CURB (TY II) LF     18.000 29.00000 1
531 2005 CURB RAMPS (TY 1) EA     3.000 2,500.00000 1
531 2010 CURB RAMPS (TY 7) EA     4.000 1,500.00000 1
531 2015 CONC SIDEWALKS (4") SY     15.000 99.00000 1
531 2040 CURB RAMPS (TY 5) EA     4.000 3,000.00000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF 150.000 30.00000 994.000 20.93159 5
540 2005 TERMINAL ANCHOR SECTION EA 1.000 750.00000 6.000 375.50000 4
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     4.000 1,800.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF     400.000 3.00000 1
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 1.000 2,500.00000 3.000 2,500.00000 3
544 2004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     2.000 1.00000 1
544 2005 GDRAIL END TRT (INST) (WOOD POST) (TY II) EA     1.000 1.00000 1
544 2006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA     1.000 1.00000 1