Detail Letting Schedule for Freestone County (FY 2020)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Freestone County (FY 2020) |
CCSJ: 0166-02-044 |
|||
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | SH 75 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0166-02-044 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | NAVARRO COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 84 | ESTIMATE: | $1,438,845 |
Length: | 14.9 | Actual | $849,595 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | SH 75 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0166-06-030 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 7 | Fund Cat: | 1 |
Limits To: | MADISON COUNTY LINE | ESTIMATE: | $420,918 |
Length: | 12.1 | Actual | $358,406 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1712 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0210-03-028 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | US 77 | Fund Cat: | 1 |
Limits To: | FM 487 | ESTIMATE: | $171,905 |
Length: | 5.0 | Actual | $147,249 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 485 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0262-01-029 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 979 | Fund Cat: | 1 |
Limits To: | 4 MI E OF FM 979 | ESTIMATE: | $173,980 |
Length: | 0.0 | Actual | $148,329 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 485 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0262-02-028 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 4 MI E OF FM 979 | Fund Cat: | 1 |
Limits To: | ROBERTSON COUNTY LINE | ESTIMATE: | $492,786 |
Length: | 0.0 | Actual | $420,155 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | SH 237 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0267-08-006 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 290 | Fund Cat: | 1 |
Limits To: | FAYETTE COUNTY LINE | ESTIMATE: | $91,435 |
Length: | 0.0 | Actual | $76,505 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | SH 164 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0413-05-033 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | LIMESTONE COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 80 W | ESTIMATE: | $184,814 |
Length: | 0.0 | Actual | $155,676 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 489 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0426-02-021 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 75 | Fund Cat: | 1 |
Limits To: | FM 1848 | ESTIMATE: | $191,345 |
Length: | 5.0 | Actual | $160,253 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | SH OSR | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0475-01-057 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 21 | Fund Cat: | 1 |
Limits To: | FM 1687 | ESTIMATE: | $158,417 |
Length: | 4.2 | Actual | $136,852 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 2155 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0506-04-025 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 60 | Fund Cat: | 1 |
Limits To: | FM 1361 | ESTIMATE: | $174,592 |
Length: | 5.2 | Actual | $145,710 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 978 | Let Status: | Actual |
Project ID: | C 552-2-30 | CSJ: | 0552-02-030 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 39 | Fund Cat: | 1 |
Limits To: | FM 2289 | ESTIMATE: | $246,605 |
Length: | 7.7 | Actual | $211,542 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 3060 | Let Status: | Actual |
Project ID: | C 578-4-6 | CSJ: | 0578-04-006 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | 2.08 MI N OF SH 21 | Fund Cat: | 1 |
Limits To: | SH 21 | ESTIMATE: | $66,357 |
Length: | 2.1 | Actual | $56,786 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 80 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0612-01-050 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 164 | Fund Cat: | 1 |
Limits To: | THE LIMESTONE COUNTY LINE | ESTIMATE: | $175,551 |
Length: | 0.0 | Actual | $153,269 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 3090 | Let Status: | Actual |
Project ID: | C 643-5-57 | CSJ: | 0643-05-057 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 244 | Fund Cat: | 1 |
Limits To: | FM 3455 | ESTIMATE: | $588,093 |
Length: | 14.4 | Actual | $504,448 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | NH 2020(082) | CSJ: | 0675-01-073 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 833 | Fund Cat: | 1 |
Limits To: | END OF STATE MAINTENANCE | ESTIMATE: | $90,164 |
Length: | 0.0 | Actual | $76,750 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | NH 2020(082) | CSJ: | 0675-02-088 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 179 | Fund Cat: | 1 |
Limits To: | 2.25 MI N OF SH 179 | ESTIMATE: | $66,774 |
Length: | 1.0 | Actual | $57,368 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | NH 2020(082) | CSJ: | 0675-05-092 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 21 | Fund Cat: | 1 |
Limits To: | SH 75 | ESTIMATE: | $127,785 |
Length: | 0.0 | Actual | $110,430 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 60 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0713-01-044 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 111 | Fund Cat: | 1 |
Limits To: | PR 4 | ESTIMATE: | $424,957 |
Length: | 11.5 | Actual | $370,762 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 362 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0944-01-025 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 2988 | Fund Cat: | 1 |
Limits To: | WALLER COUNTY LINE | ESTIMATE: | $180,199 |
Length: | 0.0 | Actual | $151,708 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 416 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0998-04-007 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | NAVARRO COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 75 | ESTIMATE: | $6,994 |
Length: | 0.0 | Actual | $6,037 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 416 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 0998-05-011 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | NAVARRO COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 488 | ESTIMATE: | $228,992 |
Length: | 1.0 | Actual | $193,652 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 975 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 1129-01-030 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | RRX BRIDGE | Fund Cat: | 1 |
Limits To: | END OF STATE MAINTENANCE | ESTIMATE: | $175,299 |
Length: | 0.0 | Actual | $149,651 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 976 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 1130-01-019 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 60 | Fund Cat: | 1 |
Limits To: | SH 36 | ESTIMATE: | $129,025 |
Length: | 3.9 | Actual | $108,229 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1511 | Let Status: | Actual |
Project ID: | C 1145-3-9 | CSJ: | 1145-03-009 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 3178 | Fund Cat: | 1 |
Limits To: | SH 7 | ESTIMATE: | $114,990 |
Length: | 3.5 | Actual | $97,896 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1146 | Let Status: | Actual |
Project ID: | C 1148-2-18 | CSJ: | 1148-02-018 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 1469 | Fund Cat: | 1 |
Limits To: | US 79 | ESTIMATE: | $260,518 |
Length: | 7.0 | Actual | $224,324 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1119 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 1223-01-042 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 579 | Fund Cat: | 1 |
Limits To: | MADISON COUNTY LINE | ESTIMATE: | $79,660 |
Length: | 2.2 | Actual | $69,659 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1451 | Let Status: | Actual |
Project ID: | C 1327-2-24 | CSJ: | 1327-02-024 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | BU 84-R | Fund Cat: | 1 |
Limits To: | FM 489 | ESTIMATE: | $205,064 |
Length: | 6.4 | Actual | $175,595 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1375 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 1402-02-018 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | MONTGOMERY COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 75 | ESTIMATE: | $354,764 |
Length: | 8.9 | Actual | $302,352 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1155 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 1405-04-025 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 290 | Fund Cat: | 1 |
Limits To: | FM 1371 | ESTIMATE: | $4,620 |
Length: | 0.1 | Actual | $4,039 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 696 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 1507-02-017 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | THE LEE COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 21 | ESTIMATE: | $190,891 |
Length: | 0.0 | Actual | $160,158 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1644 | Let Status: | Actual |
Project ID: | C 1563-1-17 | CSJ: | 1563-01-017 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 6 | Fund Cat: | 1 |
Limits To: | FM 485 | ESTIMATE: | $283,874 |
Length: | 8.3 | Actual | $243,462 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1644 | Let Status: | Actual |
Project ID: | C 1563-2-20 | CSJ: | 1563-02-020 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 485 | Fund Cat: | 1 |
Limits To: | US 9 | ESTIMATE: | $100,725 |
Length: | 2.9 | Actual | $86,823 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1428 | Let Status: | Actual |
Project ID: | C 1722-1-18 | CSJ: | 1722-01-018 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 21 | Fund Cat: | 1 |
Limits To: | FM 247 | ESTIMATE: | $318,473 |
Length: | 9.2 | Actual | $272,929 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 111 | Let Status: | Actual |
Project ID: | C 1922-1-21 | CSJ: | 1922-01-021 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | 3.4 MI E OF FM 60 | Fund Cat: | 1 |
Limits To: | FM 60 | ESTIMATE: | $111,128 |
Length: | 3.4 | Actual | $94,904 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 111 | Let Status: | Actual |
Project ID: | C 1922-1-22 | CSJ: | 1922-01-022 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 60 | Fund Cat: | 1 |
Limits To: | 5.4 MI W OF FM 60 | ESTIMATE: | $173,802 |
Length: | 5.3 | Actual | $148,561 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1469 | Let Status: | Actual |
Project ID: | C 1971-1-14 | CSJ: | 1971-01-014 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 1146 | Fund Cat: | 1 |
Limits To: | FM 1512 | ESTIMATE: | $194,987 |
Length: | 0.0 | Actual | $166,942 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 2296 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 2135-01-023 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | US 190 | Fund Cat: | 1 |
Limits To: | SH 75 | ESTIMATE: | $323,057 |
Length: | 7.4 | Actual | $271,963 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1948 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 2238-01-013 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 290 | Fund Cat: | 1 |
Limits To: | FM 390 | ESTIMATE: | $59,462 |
Length: | 0.0 | Actual | $50,925 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1948 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 2238-02-024 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 390 | Fund Cat: | 1 |
Limits To: | FM 594 | ESTIMATE: | $87,340 |
Length: | 0.0 | Actual | $74,210 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FS 2296 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 2269-01-008 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 2296 | Fund Cat: | 1 |
Limits To: | END OF STATE MAINTENANCE | ESTIMATE: | $8,495 |
Length: | 0.0 | Actual | $7,178 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1644 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 2337-01-023 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 46 | Fund Cat: | 1 |
Limits To: | SH 6 | ESTIMATE: | $368,585 |
Length: | 12.0 | Actual | $309,245 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 979 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 2400-01-013 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 2293 | Fund Cat: | 1 |
Limits To: | SH 7 | ESTIMATE: | $335,290 |
Length: | 0.0 | Actual | $286,823 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 980 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 2443-01-023 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 19 | Fund Cat: | 1 |
Limits To: | POLK COUNTY LINE | ESTIMATE: | $230,191 |
Length: | 5.4 | Actual | $197,172 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | SS 104 | Let Status: | Actual |
Project ID: | C 2648-1-8 | CSJ: | 2648-01-008 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | IH 45 EFR | Fund Cat: | 1 |
Limits To: | SH 75 | ESTIMATE: | $32,111 |
Length: | 0.0 | Actual | $27,554 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 2679 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 2673-02-012 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 390 | Fund Cat: | 1 |
Limits To: | US 290 | ESTIMATE: | $171,697 |
Length: | 5.2 | Actual | $143,750 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 2774 | Let Status: | Actual |
Project ID: | C 2825-1-10 | CSJ: | 2825-01-010 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 976 | Fund Cat: | 1 |
Limits To: | END OF STATE MAINT | ESTIMATE: | $47,177 |
Length: | 1.5 | Actual | $40,239 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 2819 | Let Status: | Actual |
Project ID: | C 2849-1-12 | CSJ: | 2849-01-012 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 1774 | Fund Cat: | 1 |
Limits To: | FM 1486 | ESTIMATE: | $350,650 |
Length: | 8.8 | Actual | $306,465 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1848 | Let Status: | Actual |
Project ID: | C 2948-2-13 | CSJ: | 2948-02-013 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 489 | Fund Cat: | 1 |
Limits To: | LEON COUNTY LINE | ESTIMATE: | $236,696 |
Length: | 7.5 | Actual | $203,030 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 362 | Let Status: | Actual |
Project ID: | STP 2020(092) | CSJ: | 3033-02-011 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 105 | Fund Cat: | 1 |
Limits To: | FM 2988 | ESTIMATE: | $151,907 |
Length: | 0.0 | Actual | $129,515 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 579 | Let Status: | Actual |
Project ID: | C 3178-1-8 | CSJ: | 3178-01-008 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 1119 | Fund Cat: | 1 |
Limits To: | MADISON COUNTY LINE | ESTIMATE: | $79,394 |
Length: | 2.5 | Actual | $68,026 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 579 | Let Status: | Actual |
Project ID: | C 3178-2-7 | CSJ: | 3178-02-007 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | LEON COUNTY LINE | Fund Cat: | 1 |
Limits To: | OSR | ESTIMATE: | $44,060 |
Length: | 1.3 | Actual | $37,648 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 1073 | Let Status: | Actual |
Project ID: | C 3252-1-4 | CSJ: | 3252-01-004 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 75 | Fund Cat: | 1 |
Limits To: | END OF PAVEMENT | ESTIMATE: | $24,946 |
Length: | 0.9 | Actual | $21,394 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 2954 | Let Status: | Actual |
Project ID: | C 3301-1-19 | CSJ: | 3301-01-019 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 46 | Fund Cat: | 1 |
Limits To: | THE END OF STATE MAINTENANCE | ESTIMATE: | $306,461 |
Length: | 0.0 | Actual | $261,670 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 3456 | Let Status: | Actual |
Project ID: | C 3446-1-4 | CSJ: | 3446-01-004 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 332 | Fund Cat: | 1 |
Limits To: | FM 109 | ESTIMATE: | $56,753 |
Length: | 0.0 | Actual | $48,360 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0166-02-044 | ||
---|---|---|---|
Length: | 197.7 | ||
Estimate: | $11,313,596 | ||
Actual: | $9,282,174 | ||
CCSJ: 0166-03-033 |
|||
District: | BRYAN | Let Date: | Jul 2020 |
Highway: | SH 75 | Let Status: | Actual |
Project ID: | STP 2020(951)HES | CSJ: | 0166-03-033 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | CR 490 | Fund Cat: | 8 |
Limits To: | LEON CO. LINE | ESTIMATE: | $2,498,753 |
Length: | 0.0 | Actual | $2,277,381 |
District: | BRYAN | Let Date: | Jul 2020 |
Highway: | SH 90 | Let Status: | Actual |
Project ID: | STP 2020(951)HES | CSJ: | 0315-03-062 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.50 MILES N. OF FM 149 | Fund Cat: | 8 |
Limits To: | 0.15 MILES S OF CR 444 | ESTIMATE: | $783,614 |
Length: | 4.1 | Actual | $807,796 |
District: | BRYAN | Let Date: | Jul 2020 |
Highway: | FM 1687 | Let Status: | Actual |
Project ID: | STP 2020(951)HES | CSJ: | 1560-01-038 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 50 | Fund Cat: | 8 |
Limits To: | SH 21 | ESTIMATE: | $962,499 |
Length: | 10.7 | Actual | $1,006,628 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0166-03-033 | ||
Length: | 14.8 | ||
Estimate: | $4,244,866 | ||
Actual: | $4,091,805 | ||
CCSJ: 0456-01-047 |
|||
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 27 | Let Status: | Actual |
Project ID: | STP 1902(155) | CSJ: | 0456-01-047 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | LIMESTONE COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 80 | ESTIMATE: | $10,553,618 |
Length: | 9.9 | Actual | $9,173,729 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 27 | Let Status: | Actual |
Project ID: | STP 1902(155) | CSJ: | 0456-01-048 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | LIMESTONE CO LINE | Fund Cat: | 1 |
Limits To: | FM 80 | ESTIMATE: | $211,885 |
Length: | 9.9 | Actual | $172,369 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 27 | Let Status: | Actual |
Project ID: | STP 1902(155) | CSJ: | 0456-02-023 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 80 | Fund Cat: | 1 |
Limits To: | CANEY CREEK RELIEF BRIDGE | ESTIMATE: | $5,250,760 |
Length: | 4.6 | Actual | $4,209,232 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 27 | Let Status: | Actual |
Project ID: | STP 1902(155) | CSJ: | 0456-02-025 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | CANEY CREEK RELIEF BRIDGE | Fund Cat: | 1 |
Limits To: | CR 941 | ESTIMATE: | $1,187,730 |
Length: | 1.8 | Actual | $1,119,558 |
District: | BRYAN | Let Date: | Oct 2019 |
Highway: | FM 27 | Let Status: | Actual |
Project ID: | STP 1902(155) | CSJ: | 0456-02-027 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 80 | Fund Cat: | 1 |
Limits To: | US 84 | ESTIMATE: | $258,239 |
Length: | 10.0 | Actual | $217,958 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0456-01-047 | ||
Length: | 36.2 | ||
Estimate: | $17,462,231 | ||
Actual: | $14,892,846 | ||
CCSJ: 0459-01-079 |
|||
District: | BRYAN | Let Date: | Jul 2020 |
Highway: | FM 488 | Let Status: | Actual |
Project ID: | STP 2020(953)HES | CSJ: | 0459-01-079 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | US 287 | Fund Cat: | 8 |
Limits To: | US 84 | ESTIMATE: | $1,422,021 |
Length: | 18.2 | Actual | $1,492,224 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0459-01-079 | ||
Length: | 18.2 | ||
Estimate: | $1,422,021 | ||
Actual: | $1,492,224 | ||
CCSJ: 0917-20-039 |
|||
District: | BRYAN | Let Date: | Apr 2020 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2019(179) | CSJ: | 0917-20-039 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | ON CR 345 (LOCAL ROAD 1101) | Fund Cat: | 6 |
Limits To: | AT CANEY CREEK BRANCH | ESTIMATE: | $482,852 |
Length: | 0.0 | Actual | $479,341 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0917-20-039 | ||
Length: | 0 | ||
Estimate: | $482,852 | ||
Actual: | $479,341 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |