AVERAGE LOW BID UNIT PRICE - MAINTENANCE - TYLER DISTRICT

Last Update: Wednesday, April 3, 2013
ITEMS 730 2002 TO 776 2044
Items Items Bid Code Range
0100 - 0168
0247 - 0247
0305 - 0354
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0776
1122 - 1122
3224 - 3268
5049 - 5049
6006 - 6834
7573 - 7573
730 2002 - 776 2044
Item No Description Units March 31, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
730 2002 FULL - WIDTH MOWING AC     128,182.320 24.54830 21
734 2001 LITTER REMOVAL AC     39,235.930 8.11729 20
735 2001 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES CYC     76.000 1,975.00000 1
735 2003 DEBRIS REMOVAL (FRONTAGE ROADS) CYC     12.000 975.00000 1
735 2005 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) CYC     12.000 975.00000 1
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI     6.000 100.00000 1
738 2001 CLEANING / SWEEPING (CENTER MEDIAN) CYC     5.000 8,500.00000 1
738 2003 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC     5.000 8,500.00000 1
738 2013 CLEANING / SWEEPING (DIRECT CONNECTOR) CYC     5.000 3,000.00000 1
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     1,231.290 1,518.12674 12
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     5.000 2,000.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA     8,983.000 30.89391 7
752 2023 TREE REMOVAL (12" - 18" DIA) EA     4,918.000 55.06913 7
752 2024 TREE REMOVAL (18" - 24" DIA) EA     3,160.000 70.96519 7
752 2025 TREE REMOVAL (24" - 30" DIA) EA     1,182.000 110.23689 6
752 2026 TREE REMOVAL (30" - 36" DIA) EA     541.000 150.74861 7
752 2027 TREE REMOVAL (36" - 42" DIA) EA     240.000 189.16667 7
752 2028 TREE REMOVAL (42" - 48" DIA) EA     110.000 234.09091 6
752 2029 TREE REMOVAL (48" - 60" DIA) EA     73.000 321.23288 7
752 2030 TREE REMOVAL (60" - 72" DIA) EA     44.000 402.27273 7
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF 100.000 15.00000 100.000 15.00000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     4,000.000 20.00000 1
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     50.000 30.00000 1
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     50.000 15.00000 1
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     50.000 20.00000 1
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     15.000 10.00000 1
770 2006 REALIGN POSTS EA     350.000 70.00000 1
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     1.000 1.00000 1
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     15.000 1,717.00000 1
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     12.000 1,000.00000 1
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     1,500.000 20.00000 1
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     100.000 50.00000 1
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     12.000 1.00000 1
770 2018 REM / REPL TIMBER POST W / O CONC FND EA     350.000 40.00000 1
770 2022 REM & RESET SGT IMPACT HEAD EA     15.000 400.00000 1
770 2023 REPLACE SGT OBJECT MARKER EA     15.000 100.00000 1
770 2024 REPLACE SGT CABLE ANCHOR EA     5.000 100.00000 1
770 2025 REPLACE SGT CABLE ASSEMBLY EA     12.000 100.00000 1
770 2026 REPLACE SGT STRUT EA     2.000 50.00000 1
770 2027 REMOVE & REPLACE BLOCKOUT EA     30.000 5.00000 1
770 2031 INSTALL BLOCKOUT EA     25.000 20.00000 1
774 2006 REPAIR (TRACC) EA     1.000 1,000.00000 1
774 2015 REPAIR (NARROW QUAD) EA     1.000 2,000.00000 1
774 2028 REPAIR (QUAD) (N) (BAY) EA     10.000 850.00000 1
774 2038 REMOVE AND REPLACE (FASTRACC) EA     2.000 2,500.00000 1
774 2052 REPAIR (FASTRACC) LF     50.000 100.00000 1
774 2055 REPAIR (FASTRACC) (BAY) EA     12.000 300.00000 1
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF     50.000 50.00000 1
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     50.000 20.00000 1
776 2032 REPAIR (STEEL POST W / CHANNEL IRON RAIL LF     100.000 20.00000 1
776 2044 REPAIR (TY II) LF     80.000 50.00000 1