AVERAGE LOW BID UNIT PRICE - MAINTENANCE - TYLER DISTRICT

Last Update: Thursday, March 20, 2014
ITEMS 712 2005 TO 776 2032
Items Items Bid Code Range
0100 - 0168
0314 - 0354
0401 - 0496
0500 - 0560
0618 - 0690
0712 - 0776
1122 - 1122
3224 - 3268
5369 - 5369
6005 - 6834
8020 - 8852
9054 - 9054
712 2005 - 776 2032
Item No Description Units February 28, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     406.020 392.00000 1
730 2002 FULL - WIDTH MOWING AC     196,491.120 25.69517 30
734 2001 LITTER REMOVAL AC     53,775.590 9.10693 26
735 2001 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES CYC     152.000 1,975.00000 2
735 2003 DEBRIS REMOVAL (FRONTAGE ROADS) CYC     24.000 975.00000 2
735 2005 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) CYC     24.000 975.00000 2
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI     12.000 100.00000 2
738 2001 CLEANING / SWEEPING (CENTER MEDIAN) CYC     10.000 8,500.00000 2
738 2003 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC     10.000 8,500.00000 2
738 2013 CLEANING / SWEEPING (DIRECT CONNECTOR) CYC     10.000 3,000.00000 2
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     1,420.620 1,560.84957 19
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     5.000 2,000.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA     17,683.000 32.77272 13
752 2023 TREE REMOVAL (12" - 18" DIA) EA     8,918.000 54.14106 13
752 2024 TREE REMOVAL (18" - 24" DIA) EA     5,610.000 74.45633 13
752 2025 TREE REMOVAL (24" - 30" DIA) EA     2,807.000 111.60492 12
752 2026 TREE REMOVAL (30" - 36" DIA) EA     1,441.000 160.74254 13
752 2027 TREE REMOVAL (36" - 42" DIA) EA     605.000 212.47934 13
752 2028 TREE REMOVAL (42" - 48" DIA) EA     240.000 282.70833 11
752 2029 TREE REMOVAL (48" - 60" DIA) EA     118.000 395.33898 12
752 2030 TREE REMOVAL (60" - 72" DIA) EA     78.000 457.37179 13
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     917,929.000 1.15362 4
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     8,000.000 20.00000 2
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     100.000 30.00000 2
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     100.000 15.00000 2
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     100.000 20.00000 2
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     30.000 10.00000 2
770 2006 REALIGN POSTS EA     700.000 70.00000 2
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     2.000 1.00000 2
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     30.000 1,717.00000 2
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     24.000 1,000.00000 2
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     3,000.000 20.00000 2
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     200.000 50.00000 2
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     24.000 1.00000 2
770 2018 REM / REPL TIMBER POST W / O CONC FND EA     700.000 40.00000 2
770 2022 REM & RESET SGT IMPACT HEAD EA     30.000 400.00000 2
770 2023 REPLACE SGT OBJECT MARKER EA     30.000 100.00000 2
770 2024 REPLACE SGT CABLE ANCHOR EA     10.000 100.00000 2
770 2025 REPLACE SGT CABLE ASSEMBLY EA     24.000 100.00000 2
770 2026 REPLACE SGT STRUT EA     4.000 50.00000 2
770 2027 REMOVE & REPLACE BLOCKOUT EA     60.000 5.00000 2
770 2031 INSTALL BLOCKOUT EA     50.000 20.00000 2
774 2006 REPAIR (TRACC) EA     2.000 1,000.00000 2
774 2015 REPAIR (NARROW QUAD) EA     2.000 2,000.00000 2
774 2028 REPAIR (QUAD) (N) (BAY) EA     20.000 850.00000 2
774 2038 REMOVE AND REPLACE (FASTRACC) EA     4.000 2,500.00000 2
774 2052 REPAIR (FASTRACC) LF     100.000 100.00000 2
774 2055 REPAIR (FASTRACC) (BAY) EA     24.000 300.00000 2
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF     100.000 50.00000 2
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     100.000 20.00000 2
776 2032 REPAIR (STEEL POST W / CHANNEL IRON RAIL LF     200.000 20.00000 2