AVERAGE LOW BID UNIT PRICE - MAINTENANCE - TYLER DISTRICT

Last Update: Wednesday, November 9, 2016
ITEMS 500 6001 TO 560 6006
Items Items Bid Code Range
0100 - 0169
0247 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0636 - 0690
0700 - 0780
6000 - 6056
7052 - 7052
500 6001 - 560 6006
Item No Description Units October 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 6001 MOBILIZATION LS 2.000 5,000.50000 30.000 35,230.98067 30
500 6033 MOBILIZATION (CALLOUT) EA 48.000 130.00000 88.000 497.20455 10
500 6034 MOBILIZATION (EMERGENCY) EA     2.000 1,375.00000 2
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO     48.000 5,006.02854 14
502 6002 BARR, SIGNS, TRAFFIC HANDLING ADD ALT1 MO     12.000 2,038.13000 1
502 6024 FURNISH ADDITIONAL ARROW BOARD HR     32.000 15.65500 2
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     1,086.000 26.39733 11
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     25.000 45.10000 1
506 6011 ROCK FILTER DAMS (REMOVE) LF     1,071.000 14.36975 10
506 6027 EXCAV (EROSN & SEDMT CONT, IN VEH) CY     400.000 69.30000 1
506 6029 EARTHWORK (EROSN & SEDMT CONT, IN VEH) CY     20.000 40.00000 1
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR     6.000 110.00000 1
506 6033 BULLDOZER WORK (EROSION & SEDMT CONT) HR     5.000 119.90000 1
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF     7,706.000 2.85920 14
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF     6,706.000 1.21861 13
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF     1,109.000 12.00000 1
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF     112.000 8.00000 1
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF     1,221.000 4.00000 2
514 6002 PERM CTB (SGL SLOPE) (TY 2) (42 ) LF     5.000 118.80000 1
529 6005 CONC CURB (MONO) (TY II) LF     582.000 25.00000 1
529 6008 CONC CURB & GUTTER (TY II) LF     534.000 38.36704 2
530 6004 DRIVEWAYS (CONC) SY     98.200 95.78411 2
530 6005 DRIVEWAYS (ACP) SY     182.500 120.95890 2
531 6001 CONC SIDEWALKS (4") SY     10.000 100.00000 1
533 6001 RUMBLE STRIPS (SHOULDER) LF     105,600.000 0.20000 1
540 6001 MTL W - BEAM GD FEN (TIM POST) LF     725.000 20.26345 2
540 6003 MTL THRIE - BEAM GD FEN (TIM POST) LF     75.000 13.88000 1
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     4.000 1,655.92500 2
540 6008 MTL BEAM GD FEN TRANS (T101) EA     2.000 1,771.85000 1
540 6010 MTL W - BEAM GD FEN ADJUSTMENT LF     75.000 1.22000 1
540 6011 MTL THRIE - BEAM GD FEN ADJUSTMENT LF     75.000 1.22000 1
540 6013 TRANSITION ADJUSTMENT EA     2.000 30.46000 1
540 6014 SHORT RADIUS LF     35.000 29.93000 1
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA     2.000 470.46000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF     725.000 5.20483 2
542 6002 REMOVE TERMINAL ANCHOR SECTION EA     2.000 121.85000 1
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL LF     1.000 330.00000 1
542 6004 RM MTL BM GD FENCE TRANS (THRIE - BEAM) EA     2.000 440.00000 1
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA     1.000 2,585.00000 1
544 6002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     1.000 1,650.00000 1
544 6004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     2.000 2,321.85000 1
545 6005 CRASH CUSH ATTEN (REMOVE) EA     2.000 1,782.00000 1
550 6001 CHAIN LINK FENCE (INSTALL) (6') LF     100.000 24.00000 1
552 6001 WIRE FENCE (TY A) LF     60.000 10.00000 1
560 6006 MAILBOX INSTALL - M (TWG - POST) TY 2 EA     1.000 400.00000 1