AVERAGE LOW BID UNIT PRICE - MAINTENANCE - TYLER DISTRICT

Last Update: Monday, June 20, 2016
ITEMS 500 2001 TO 560 6006
Items Items Bid Code Range
0100 - 0169
0247 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0636 - 0690
0700 - 0780
3268 - 3268
5445 - 5445
6000 - 6834
7039 - 7185
8020 - 8852
9054 - 9054
500 2001 - 560 6006
Item No Description Units May 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS     2.000 150,050.00000 2
500 2006 MOBILIZATION EA     18.000 350.00000 1
500 6001 MOBILIZATION LS 1.000 34,700.00000 32.000 33,979.81688 32
500 6033 MOBILIZATION (CALLOUT) EA 6.000 2,250.00000 104.000 566.82692 8
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO     14.000 5,144.28571 2
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 4,164.75000 52.000 4,794.02635 15
502 6002 BARR, SIGNS, TRAFFIC HANDLING ADD ALT1 MO     12.000 2,038.13000 1
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 40.000 54.00000 2,686.000 23.70346 17
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     25.000 45.10000 1
506 6011 ROCK FILTER DAMS (REMOVE) LF     2,671.000 10.62898 16
506 6027 EXCAV (EROSN & SEDMT CONT, IN VEH) CY     400.000 69.30000 1
506 6029 EARTHWORK (EROSN & SEDMT CONT, IN VEH) CY     20.000 40.00000 1
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR     6.000 110.00000 1
506 6033 BULLDOZER WORK (EROSION & SEDMT CONT) HR     5.000 119.90000 1
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 40.000 1.60000 12,206.000 2.71448 19
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 40.000 0.75000 11,206.000 1.47439 18
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF     1,109.000 12.00000 1
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF     112.000 8.00000 1
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF     1,221.000 4.00000 2
514 2005 PERM CONC TRF BARR (SGL SLP) (TY 2) (42" LF     15.000 400.00000 1
514 6002 PERM CTB (SGL SLOPE) (TY 2) (42 ) LF     5.000 118.80000 1
529 6005 CONC CURB (MONO) (TY II) LF     582.000 25.00000 1
529 6008 CONC CURB & GUTTER (TY II) LF     534.000 38.36704 2
530 6004 DRIVEWAYS (CONC) SY     98.200 95.78411 2
530 6005 DRIVEWAYS (ACP) SY     182.500 120.95890 2
531 6001 CONC SIDEWALKS (4") SY     10.000 100.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     15,840.000 4.00000 1
533 6001 RUMBLE STRIPS (SHOULDER) LF     105,600.000 0.20000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF     100.000 15.00000 1
540 2003 MTL THRIE - BEAM GD FEN (TIM POST) LF     100.000 15.00000 1
540 2007 MTL W - BEAM GD FEN ADJUSTMENT LF     100.000 1.00000 1
540 2008 MTL THRIE - BEAM GD FEN ADJUSTMENT LF     100.000 1.00000 1
540 2010 TRANSITION ADJUSTMENT EA     1.000 1.00000 1
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     1.000 2,000.00000 1
540 2013 MTL BEAM GD FEN TRANS (T101) EA     1.000 2,000.00000 1
540 2031 MTL BM GD FN (REMOVE & RESET) LF     200.000 5.00000 1
540 2032 MTL BM GD FN TRANSITION (REMOVE & RESET) EA     1.000 50.00000 1
540 2037 MTL W - BEAM GD FEN (CRT POST) (SHRT RAD LF     110.000 10.00000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     5.000 600.00000 1
540 6001 MTL W - BEAM GD FEN (TIM POST) LF     825.000 19.01939 3
540 6003 MTL THRIE - BEAM GD FEN (TIM POST) LF     100.000 17.91000 2
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     5.000 1,524.74000 3
540 6008 MTL BEAM GD FEN TRANS (T101) EA     3.000 1,181.56667 2
540 6010 MTL W - BEAM GD FEN ADJUSTMENT LF     175.000 1.09429 2
540 6011 MTL THRIE - BEAM GD FEN ADJUSTMENT LF     100.000 1.16500 2
540 6013 TRANSITION ADJUSTMENT EA     3.000 36.97333 2
540 6014 SHORT RADIUS LF     35.000 29.93000 1
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA     3.000 313.97333 2
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF     50.000 10.00000 1
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     25.000 10.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF     250.000 5.00000 1
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     1.000 600.00000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF     925.000 4.83622 4
542 6002 REMOVE TERMINAL ANCHOR SECTION EA     7.000 70.52857 2
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL LF     1.000 330.00000 1
542 6004 RM MTL BM GD FENCE TRANS (THRIE - BEAM) EA     2.000 440.00000 1
544 2004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     2.000 3,000.00000 1
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA     1.000 2,585.00000 1
544 6002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     2.000 875.00000 2
544 6004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     17.000 1,979.04118 4
545 2003 CRASH CUSH ATTEN (REMOVE) EA     1.000 2,000.00000 1
545 2004 CRASH CUSH ATTEN (INSTL) (FASTRACC) EA     1.000 10,000.00000 1
545 6005 CRASH CUSH ATTEN (REMOVE) EA     4.000 916.25000 3
550 6001 CHAIN LINK FENCE (INSTALL) (6') LF     100.000 24.00000 1
552 6001 WIRE FENCE (TY A) LF     60.000 10.00000 1
560 6006 MAILBOX INSTALL - M (TWG - POST) TY 2 EA     1.000 400.00000 1