| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | SUTTON |
| Highway |
US0277 |
| From |
PICNIC AREAS IN THE SUTTON, SCHLEICHER |
| To |
CROCKETT, IRION AND REAGAN COUNTIES |
| CSJ |
6023-58-001 |
| Proj ID |
RMC - 602358001 |
| Work Type |
PICNIC AREA MAINTENANCE |
| |
|
563.000 |
37095.00 |
0.00 |
36705.00 |
98.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
04-23-98 |
| Work Began |
05-01-98 |
| Work Completed |
|
| Time Computed |
05-01-98 |
| Contract Working Days |
175 |
| Addl Days Granted |
0 |
| Working Days Charged |
175 |
| Percent Time Used |
100 |
| Contractor(s) |
| PAXTON'S CONTRACT SERVICES |
SUBCONTRACTOR(S) FOR CCSJ: 6023-58-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03980701 |
|
Totals |
37095.00 |
0.00 |
36705.00 |
98.9 |
|
| County | RUNNELS |
| Highway |
SH0153 |
| From |
VARIOUS LOCATIONS IN RUNNELS COUNTY |
| To |
VARIOUS LOCATIONS IN RUNNELS COUNTY |
| CSJ |
6042-59-001 |
| Proj ID |
RMC - 604259001 |
| Work Type |
MOWING OF THE RIGHT - OF - WAY |
| |
|
0.001 |
95169.36 |
0.00 |
60378.84 |
64.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-05-99 |
| Work Began |
11-01-99 |
| Work Completed |
|
| Time Computed |
11-01-99 |
| Contract Working Days |
84 |
| Addl Days Granted |
0 |
| Working Days Charged |
15 |
| Percent Time Used |
17 |
| Contractor(s) |
| M AND D CONTRACTORS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6042-59-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05990709 |
|
Totals |
95169.36 |
0.00 |
60378.84 |
64.0 |
|
| County | COKE |
| Highway |
SH0158 |
| From |
LOCATIONS IN TOM GREEN & COKE CO. |
| To |
LOCATIONS IN STERLING/RUNNELS CO. |
| CSJ |
6044-53-001 |
| Proj ID |
RMC - 604453001 |
| Work Type |
METAL BEAM GUARD FENCE REPAIR ETC. |
| |
|
1.000 |
215780.00 |
0.00 |
245721.50 |
99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
01-04-00 |
| Work Began |
01-04-00 |
| Work Completed |
|
| Time Computed |
01-04-00 |
| Contract Working Days |
180 |
| Addl Days Granted |
4 |
| Working Days Charged |
142 |
| Percent Time Used |
77 |
| Contractor(s) |
| ROCKS-R-US LUXURY LANDSCAPE |
SUBCONTRACTOR(S) FOR CCSJ: 6044-53-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10990701 |
|
Totals |
215780.00 |
0.00 |
245721.50 |
99.9 |
|
| County | SUTTON |
| Highway |
US0277 |
| From |
SITES LOCATED IN SUTTON, SCHLEICHER, |
| To |
CROCKETT, IRION, & REAGAN |
| CSJ |
6044-57-001 |
| Proj ID |
RMC - 604457001 |
| Work Type |
MAINTENANCE WORK AT PICNIC AREA SITES |
| |
|
0.010 |
24599.84 |
0.00 |
23444.55 |
95.3 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
08-26-99 |
| Work Began |
09-01-99 |
| Work Completed |
|
| Time Computed |
09-01-99 |
| Contract Working Days |
126 |
| Addl Days Granted |
0 |
| Working Days Charged |
126 |
| Percent Time Used |
100 |
| Contractor(s) |
| SHAW'S GENERAL REPAIR |
SUBCONTRACTOR(S) FOR CCSJ: 6044-57-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06990709 |
|
Totals |
24599.84 |
0.00 |
23444.55 |
95.3 |
|
| County | SUTTON |
| Highway |
IH0010 |
| From |
EASTBOUND AND WESTBOUND |
| To |
COMFORT STATIONS ON IH-10 |
| CSJ |
6044-85-001 |
| Proj ID |
RMC - 604485001 |
| Work Type |
REMOVE AND INSTALL CONCRETE C & G |
| |
|
0.565 |
97689.80 |
0.00 |
109995.20 |
99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
07-26-99 |
| Work Began |
07-26-99 |
| Work Completed |
|
| Time Computed |
07-26-99 |
| Contract Working Days |
20 |
| Addl Days Granted |
7 |
| Working Days Charged |
27 |
| Percent Time Used |
100 |
| Contractor(s) |
| TEJAS INTERNATIONAL GROUP, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6044-85-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06990702 |
|
Totals |
97689.80 |
0.00 |
109995.20 |
99.9 |
|
| County | REAL |
| Highway |
FM2631 |
| From |
VARIOUS LOCATIONS |
| To |
. |
| CSJ |
6052-10-001 |
| Proj ID |
RMC - 605210001 |
| Work Type |
TREE AND BRUSH CONTROL |
| |
|
23.320 |
85997.05 |
0.00 |
77489.86 |
93.8 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
02-10-00 |
| Work Began |
02-14-00 |
| Work Completed |
|
| Time Computed |
02-14-00 |
| Contract Working Days |
60 |
| Addl Days Granted |
30 |
| Working Days Charged |
106 |
| Percent Time Used |
117 |
| Contractor(s) |
| KENNETH SNOW CONTRACTING |
SUBCONTRACTOR(S) FOR CCSJ: 6052-10-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01000701 |
|
Totals |
85997.05 |
0.00 |
77489.86 |
93.8 |
|
| County | REAGAN |
| Highway |
US0067 |
| From |
ALL ROADWAYS IN REAGAN & IRION |
| To |
COUNTIES |
| CSJ |
6056-89-001 |
| Proj ID |
RMC - 605689001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
288.946 |
90298.23 |
0.00 |
63191.62 |
69.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
02-08-01 |
| Work Began |
02-19-01 |
| Work Completed |
|
| Time Computed |
02-19-01 |
| Contract Working Days |
65 |
| Addl Days Granted |
0 |
| Working Days Charged |
39 |
| Percent Time Used |
60 |
| Contractor(s) |
| JEREMY SANDERS |
SUBCONTRACTOR(S) FOR CCSJ: 6056-89-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05000701 |
|
Totals |
90298.23 |
0.00 |
63191.62 |
69.9 |
|
| County | COKE |
| Highway |
US0277 |
| From |
VARIOUS LOCATIONS IN COKE COUNTY |
| To |
VARIOUS LOCATIONS IN COKE COUNTY |
| CSJ |
6056-97-001 |
| Proj ID |
RMC - 605697001 |
| Work Type |
PICNIC AREA MAINTENANCE |
| |
|
1.000 |
7920.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
157 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| STEVEN RAY WARREN |
SUBCONTRACTOR(S) FOR CCSJ: 6056-97-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06000703 |
|
Totals |
7920.00 |
0.00 |
0.00 |
0.0 |
|
| County | RUNNELS |
| Highway |
SH0153 |
| From |
VARIOUS ROADS IN RUNNELS COUNTY |
| To |
VARIOUS ROADS IN RUNNELS COUNTY |
| CSJ |
6057-35-001 |
| Proj ID |
RMC - 605735001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
312.000 |
88140.60 |
0.00 |
83204.00 |
95.1 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
11-17-00 |
| Work Began |
12-01-00 |
| Work Completed |
|
| Time Computed |
12-01-00 |
| Contract Working Days |
84 |
| Addl Days Granted |
0 |
| Working Days Charged |
64 |
| Percent Time Used |
76 |
| Contractor(s) |
| BILL PONDER GENERAL CONTRACTOR |
SUBCONTRACTOR(S) FOR CCSJ: 6057-35-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05000711 |
|
Totals |
88140.60 |
0.00 |
83204.00 |
95.1 |
|
| County | SUTTON |
| Highway |
US0277 |
| From |
SITES LOCATED IN SUTTON, SCHLEICHER, |
| To |
CROCKETT, IRION, & SUTTON |
| CSJ |
6058-65-001 |
| Proj ID |
RMC - 605865001 |
| Work Type |
MAINTENANCE WORK AT PICNIC AREA SITES |
| |
|
0.010 |
33926.00 |
0.00 |
30935.00 |
91.1 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
08-10-00 |
| Work Began |
09-01-00 |
| Work Completed |
|
| Time Computed |
09-01-00 |
| Contract Working Days |
126 |
| Addl Days Granted |
0 |
| Working Days Charged |
114 |
| Percent Time Used |
90 |
| Contractor(s) |
| CLEANER REST AREAS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6058-65-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06000702 |
|
Totals |
33926.00 |
0.00 |
30935.00 |
91.1 |
|
| County | TOM GREEN |
| Highway |
FM0584 |
| From |
SAN ANGELO DISTRICT HDQTS GROUNDS |
| To |
SAN ANGELO DISTRICT HDQTS GROUNDS |
| CSJ |
6058-82-001 |
| Proj ID |
RMC - 605882001 |
| Work Type |
LANDSCAPING AND IRRIGATION INSTALLATION |
| |
|
0.010 |
22787.70 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
07-19-00 |
| Work Began |
07-20-01 |
| Work Completed |
|
| Time Computed |
07-20-00 |
| Contract Working Days |
30 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| H & H CONSTRUCTION OF HONDO |
SUBCONTRACTOR(S) FOR CCSJ: 6058-82-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06000705 |
|
Totals |
22787.70 |
0.00 |
0.00 |
0.0 |
|
| County | SUTTON |
| Highway |
US0277 |
| From |
0.30 MILES NORTH OF LP 467, LP 467 |
| To |
0.48 MILES SOUTH OF LP 467 |
| CSJ |
6064-29-001 |
| Proj ID |
RMC - 606429001 |
| Work Type |
LANDSCAPE MAINTENANCE IN SONORA, TX |
| |
|
2.070 |
10420.00 |
0.00 |
10400.00 |
99.8 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-01-01 |
| Work Began |
05-01-01 |
| Work Completed |
|
| Time Computed |
05-01-01 |
| Contract Working Days |
192 |
| Addl Days Granted |
0 |
| Working Days Charged |
169 |
| Percent Time Used |
88 |
| Contractor(s) |
| TORRES LAWN AND TRIMMING SERVICE |
SUBCONTRACTOR(S) FOR CCSJ: 6064-29-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04010703 |
|
Totals |
10420.00 |
0.00 |
10400.00 |
99.8 |
|
| County | TOM GREEN |
| Highway |
FM0584 |
| From |
SAN ANGELO DISTRICT HDQTS GROUNDS |
| To |
SAN ANGELO DISTRICT HDQTS GROUNDS |
| CSJ |
6074-76-001 |
| Proj ID |
RMC - 607476001 |
| Work Type |
LANDSCAPING AND IRRIGATION INSTALLATION |
| |
|
0.010 |
29888.52 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
08-13-01 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
08-15-01 |
| Contract Working Days |
15 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HEYEN & HUTTO, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6074-76-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08010703 |
|
Totals |
29888.52 |
0.00 |
0.00 |
0.0 |
|
| County | TOM GREEN |
| Highway |
US0087 |
| From |
VARIOUS TOM GREEN COUNTY |
| To |
VARIOUS TOM GREEN COUNTY |
| CSJ |
6082-19-001 |
| Proj ID |
RMC - 608219001 |
| Work Type |
MOWING RIGHT OF WAY |
| |
|
0.001 |
38700.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
23 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ARBOR AIDE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6082-19-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05020701 |
|
Totals |
38700.00 |
0.00 |
0.00 |
0.0 |
|
| County | CONCHO |
| Highway |
US0087 |
| From |
VARIOUS LOCATIONS |
| To |
. |
| CSJ |
6082-62-001 |
| Proj ID |
RMC - 608262001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
102084.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
89 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ARBOR AIDE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6082-62-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05020705 |
|
Totals |
102084.00 |
0.00 |
0.00 |
0.0 |
|
| County | KIMBLE |
| Highway |
US0083 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6083-05-001 |
| Proj ID |
RMC - 608305001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
153072.50 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
164 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ARBOR AIDE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6083-05-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05020704 |
|
Totals |
153072.50 |
0.00 |
0.00 |
0.0 |
|
| County | EDWARDS |
| Highway |
SH0041 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6083-07-001 |
| Proj ID |
RMC - 608307001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
148200.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
109 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ARBOR AIDE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6083-07-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05020710 |
|
Totals |
148200.00 |
0.00 |
0.00 |
0.0 |
|
| County | CROCKETT |
| Highway |
IH0010 |
| From |
VARIOUS LOCATIONS IN CROCKETT COUNTY |
| To |
VARIOUS LOCATIONS IN CROCKETT COUNTY |
| CSJ |
6083-24-001 |
| Proj ID |
RMC - 608324001 |
| Work Type |
MAINTAINING PICNIC AREAS |
| |
|
0.001 |
8555.00 |
0.00 |
391.25 |
4.5 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
08-31-02 |
| Work Began |
09-01-02 |
| Work Completed |
|
| Time Computed |
09-01-02 |
| Contract Working Days |
131 |
| Addl Days Granted |
0 |
| Working Days Charged |
9 |
| Percent Time Used |
6 |
| Contractor(s) |
| BENNIE JOHNSON CO. |
SUBCONTRACTOR(S) FOR CCSJ: 6083-24-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06020704 |
|
Totals |
8555.00 |
0.00 |
391.25 |
4.5 |
|
| County | TOM GREEN |
| Highway |
US0087 |
| From |
VARIOUS TOM GREEN COUNTY |
| To |
VARIOUS TOM GREEN COUNTY |
| CSJ |
6088-97-001 |
| Proj ID |
RMC - 608897001 |
| Work Type |
MOWING RIGHT OF WAY |
| |
|
0.001 |
35834.04 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
23 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| W. D. LATHAM III CONSULTING |
SUBCONTRACTOR(S) FOR CCSJ: 6088-97-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
09020707 |
|
Totals |
35834.04 |
0.00 |
0.00 |
0.0 |
|
| County | SCHLEICHER |
| Highway |
US0277 |
| From |
ALL ROADWAYS IN SCHLEICHER |
| To |
COUNTY |
| CSJ |
6098-95-001 |
| Proj ID |
RMC - 609895001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
1.000 |
29402.88 |
0.00 |
29402.88 |
99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
11-26-03 |
| Work Began |
12-01-03 |
| Work Completed |
|
| Time Computed |
12-01-03 |
| Contract Working Days |
21 |
| Addl Days Granted |
0 |
| Working Days Charged |
23 |
| Percent Time Used |
109 |
| Contractor(s) |
| PEASE RIVER CO. |
SUBCONTRACTOR(S) FOR CCSJ: 6098-95-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06030703 |
|
Totals |
29402.88 |
0.00 |
29402.88 |
99.9 |
|