Item No Description Units October 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS     2.000 52,100.50000 2
500 6001 MOBILIZATION LS 2.000 6,250.00000 9.000 32,888.88889 9
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO     7.000 0.43429 2
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 8,500.00000 25.000 7,856.00000 9
502 6002 BARR, SIGNS, TRAFFIC HANDLING ADD ALT1 MO     2.000 50.00000 1
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 20.000 30.00000 20.000 30.00000 1
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     78.000 20.00000 1
506 6024 CONSTRUCTION EXITS (REMOVE) SY     78.000 18.00000 1
506 6031 FRNT END LOADER WORK (ERSN & SEDM CONT HR     30.000 150.00000 1
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF     40.000 20.00000 1
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF     40.000 2.00000 1
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF     280.000 8.00000 1
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF     280.000 2.00000 1
512 6029 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF     320.000 60.00000 1
512 6044 PORT CTB (STKPL) (F - SHAPE) (TY 4) LF     160.000 100.00000 1
529 6008 CONC CURB & GUTTER (TY II) LF     175.000 35.00000 1
531 6003 CONC SIDEWALKS (6") SY     35.000 50.00000 1
540 6001 MTL W - BEAM GD FEN (TIM POST) LF     200.000 18.00000 1
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF     2,925.000 27.05128 3
540 6005 TERMINAL ANCHOR SECTION EA     1.000 300.00000 1
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     4.000 2,200.00000 1
540 6008 MTL BEAM GD FEN TRANS (T101) EA     2.000 650.00000 1
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA     10.000 525.00000 2
540 6029 MTL BM GD FEN TRANS (THRIE - BEAM) (OPT1) EA     4.000 1,200.00000 1
540 6030 MTL BM GD FEN TRANS (THRIE - BEAM) (OPT2) EA     4.000 1,400.00000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF     1,925.000 1.97403 3
542 6002 REMOVE TERMINAL ANCHOR SECTION EA     10.000 160.00000 2
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA     4.000 3,000.00000 1
544 6002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     2.000 750.00000 1
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA     2.000 250.00000 1
544 6007 GDRAIL END TRT (INSTALL) (HBA POST) EA     24.000 2,833.33333 2
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA     2.000 4,000.00000 1
545 6004 CRASH CUSH ATTEN (STKPL) EA     1.000 2,000.00000 1
560 6009 MAILBOX INSTALL - S (RR - POST) TY 4 EA     3.000 600.00000 1