AVERAGE LOW BID UNIT PRICE - MAINTENANCE - SAN ANGELO DISTRICT

Last Update: Friday, October 3, 2014
ITEMS 712 2005 TO 776 2048
Items Items Bid Code Range
0100 - 0164
0216 - 0247
0310 - 0360
0401 - 0496
0500 - 0552
0618 - 0681
0712 - 0776
1122 - 1122
5369 - 5953
6834 - 6834
8251 - 8251
712 2005 - 776 2048
Item No Description Units Septembe 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI 342.510 527.00000 1,493.210 455.61055 5
730 2001 STRIP MOWING AC     42,166.000 28.00998 24
730 2002 FULL - WIDTH MOWING AC     67,292.000 31.79804 27
735 2001 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES CYC     24.000 518.62500 2
735 2003 DEBRIS REMOVAL (FRONTAGE ROADS) CYC     24.000 182.65000 2
735 2005 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) CYC     24.000 143.71000 2
738 2001 CLEANING / SWEEPING (CENTER MEDIAN) CYC     24.000 2,377.37500 2
738 2003 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC     24.000 3,679.00000 2
738 2005 CLEANING / SWEEPING (FRONTAGE ROAD) CYC     24.000 1,965.75000 2
738 2007 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) CYC     24.000 1,771.06000 2
738 2011 CLEANING / SWEEPING (HANDWORK) SY     151,712.000 0.26000 2
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     17,250.000 11.99420 6
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     300.000 15.26667 7
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     350.000 22.80000 7
770 2006 REALIGN POSTS EA     560.000 15.67857 7
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     29.000 5.41379 7
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     29.000 13.62069 7
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     71.000 1,787.32394 5
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     47.000 805.53191 7
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     1,950.000 19.20513 7
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     100.000 74.00000 6
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA     15.000 10.00000 1
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     175.000 54.28571 7
770 2018 REM / REPL TIMBER POST W / O CONC FND EA     300.000 47.86667 6
770 2019 REM / REPL STEEL POST W / O CONC FND EA     350.000 56.42857 5
770 2020 REM / REPL TIMBER POST W / CONC FND EA     80.000 47.50000 5
770 2021 REM / REPL STEEL POST W / CONC FND EA     540.000 93.29630 7
770 2022 REM & RESET SGT IMPACT HEAD EA     87.000 111.49425 7
770 2023 REPLACE SGT OBJECT MARKER EA     56.000 8.71429 6
770 2024 REPLACE SGT CABLE ANCHOR EA     20.000 20.40000 6
770 2025 REPLACE SGT CABLE ASSEMBLY EA     20.000 25.00000 6
770 2026 REPLACE SGT STRUT EA     20.000 18.50000 6
770 2027 REMOVE & REPLACE BLOCKOUT EA     460.000 10.95652 7
770 2028 REPLACE HINGED TOP SGT STEEL POST EA     98.000 70.05102 7
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     1,600.000 14.00000 7
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF     3,200.000 5.50000 2
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA     40.000 60.00000 2
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA     10.000 62.50000 2
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF     800.000 2.75000 2
774 2007 REPAIR (TRACC) LF     30.000 290.00000 2
774 2009 REPAIR (WIDE TRACC) LF     30.000 310.00000 2
774 2028 REPAIR (QUAD) (N) (BAY) EA     8.000 750.00000 2
774 2029 REPAIR (QUAD) (W) (BAY) EA     8.000 750.00000 2
774 2033 REPAIR (GREAT SYS) (BAY) EA     12.000 750.00000 2
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF     190.000 39.21053 5
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     215.000 40.93023 6
776 2011 REP METAL POST W / BASE PLATE (T101 RAIL EA     125.000 122.40000 6
776 2014 REP METAL POST W / BASE PLATE (T6 RAIL) EA     130.000 52.30769 7
776 2035 REPAIR (W - BEAM - T101 RAIL) LF     75.000 13.00000 2
776 2048 REP METAL POST W / BASE PLATE (TYPE T1) EA     25.000 66.00000 2