AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - SAN ANGELO DISTRICT

Last Update: Thursday, July 14, 2016
ITEMS 500 6001 TO 560 6003
Items Items Bid Code Range
0100 - 0164
0216 - 0260
0310 - 0360
0400 - 0480
0500 - 0560
0610 - 0690
0730 - 0770
3004 - 3004
4040 - 4040
6001 - 6002
500 6001 - 560 6003
Item No Description Units June 30, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 6001 MOBILIZATION LS     14.000 373,051.47286 14
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO     102.000 17,017.18294 14
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     3,583.000 11.83045 3
506 6024 CONSTRUCTION EXITS (REMOVE) SY     3,583.000 1.63894 3
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF     8,014.000 5.90709 4
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF     8,014.000 2.69717 4
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF     1,252.000 8.19652 3
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF     4,767.000 7.06028 3
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF     6,019.000 1.58865 6
512 6017 PORT CTB (DES SOURCE) (F - SHAPE) (TY 1) LF     720.000 21.43000 1
512 6029 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF     720.000 11.16000 1
512 6041 PORT CTB (STKPL) (F - SHAPE) (TY 1) LF     720.000 21.43000 1
512 6072 PTB (FRN & INSTL) (SGL SLP) (TY 1) OR (STL LF     324.000 41.28000 1
512 6074 PTB (MOVE) (SGL SLP) (TY 1) OR (STL) LF     972.000 5.66000 1
512 6076 PTB (REMOVE) (SGL SLP) (TY 1) OR (STL) LF     324.000 20.43000 1
529 6002 CONC CURB (TY II) LF     883.000 20.52000 1
529 6007 CONC CURB & GUTTER (TY I) LF     131.000 50.00000 1
529 6008 CONC CURB & GUTTER (TY II) LF     3,321.000 30.90334 2
530 6002 INTERSECTIONS (ACP) SY     1,874.000 15.65000 1
530 6005 DRIVEWAYS (ACP) SY     5,793.000 23.74498 2
530 6006 DRIVEWAYS (SURF TREAT) SY     3,479.000 30.75000 1
530 6008 TURNOUTS (ACP) SY     97.000 61.24000 1
530 6009 TURNOUTS (SURF TREAT) SY     405.000 40.81000 1
531 6002 CONC SIDEWALKS (5") SY     960.000 75.53438 2
531 6018 CURB RAMPS (TY 1) SY     411.000 200.00000 2
531 6019 CURB RAMPS (TY 2) SY     221.000 200.00000 1
531 6022 CURB RAMPS (TY 5) SY     73.000 200.00000 1
531 6024 CURB RAMPS (TY 7) SY     101.000 200.00000 1
531 6027 CURB RAMPS (TY 10) SY     68.000 225.00000 1
531 6030 CURB RAMPS (TY 21) SY     47.000 200.00000 1
533 6001 RUMBLE STRIPS (SHOULDER) LF     1,187,972.200 .12878 6
533 6002 RUMBLE STRIPS (CENTERLINE) LF     362,261.000 .24863 3
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF     26,950.000 22.87595 5
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     68.000 2,134.88353 5
540 6008 MTL BEAM GD FEN TRANS (T101) EA     4.000 1,296.82000 1
540 6010 MTL W - BEAM GD FEN ADJUSTMENT LF     750.000 13.20000 1
540 6013 TRANSITION ADJUSTMENT EA     5.000 825.00000 1
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA     55.000 1,213.32218 3
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF     50.000 17.74000 1
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA     11.000 958.07273 3
540 6031 DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT EA     5.000 660.00000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF     23,705.000 3.66877 6
542 6002 REMOVE TERMINAL ANCHOR SECTION EA     13.000 334.57077 3
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA     145.000 2,692.77462 5
544 6002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     5.000 1,650.00000 1
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA     64.000 373.62031 5
545 6001 CRASH CUSH ATTEN (INSTL) EA     2.000 10,581.87000 1
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA     5.000 591.15000 2
545 6005 CRASH CUSH ATTEN (REMOVE) EA     3.000 559.01667 2
545 6019 CRASH CUSH ATTEN (INSTL) (S) (N) (TL3) EA     1.000 9,413.97000 1
560 6001 MAILBOX INSTALL - S (TWG - POST) TY 1 EA     5.000 217.92000 1
560 6002 MAILBOX INSTALL - D (TWG - POST) TY 1 EA     1.000 249.05000 1
560 6003 MAILBOX INSTALL - M (TWG - POST) TY 1 EA     4.000 373.57000 1