AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - SAN ANGELO DISTRICT

Last Update: Friday, June 26, 2015
ITEMS 100 2002 TO 164 6043
Items Items Bid Code Range
0100 - 0164
0216 - 0275
0310 - 0356
0400 - 0499
0500 - 0560
0610 - 0688
1122 - 1122
3004 - 3270
4001 - 4680
5369 - 5369
6055 - 6834
8020 - 8251
9023 - 9023
100 2002 - 164 6043
Item No Description Units June 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA     381.280 1,190.24470 3
100 6002 PREPARING ROW STA 3.500 2,330.00000 9.090 1,512.10121 2
100 6006 PREP ROW (TREE) (LESS THAN 24" DIA) EA 2.000 766.00000 17.000 531.29412 2
103 2001 DISPOSAL OF WATER WELLS EA     4.000 3,000.00000 1
104 2009 REMOVING CONC (RIPRAP) SY     4,510.000 8.68576 2
104 2011 REMOVING CONC (MEDIANS) SY     1,112.000 12.00000 1
104 2015 REMOVING CONC (SIDEWALKS) SY     424.000 8.00000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY     328.000 11.00000 1
104 2027 REMOVING CONC (APPR SLAB) SY     461.000 12.00000 1
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     400.000 8.00000 1
104 6011 REMOVING CONC (MEDIANS) SY 14.000 100.00000 14.000 100.00000 1
104 6022 REMOVING CONC (CURB AND GUTTER) LF 52.000 40.00000 52.000 40.00000 1
105 2064 REMOV STAB BASE AND ASPH PAV (3" - 9") SY     7,780.000 6.00000 1
105 6011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY 457.000 5.90000 457.000 5.90000 1
110 2001 EXCAVATION (ROADWAY) CY     33,186.000 19.18606 3
110 2002 EXCAVATION (CHANNEL) CY     126.000 50.00000 1
110 6001 EXCAVATION (ROADWAY) CY 154.000 23.50000 364.000 27.25000 2
112 6001 SUBGRADE WIDENING (ORD COMP) STA     581.000 321.86000 1
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     6,342.000 17.00000 1
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     8,136.000 16.12000 1
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     2,552.000 20.00000 1
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 229.000 29.00000 265.000 38.64528 2
134 6002 BACKFILL (TY B) STA     114.650 456.17000 1
150 2002 BLADING HR     20.000 175.00000 1
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 1,702.000 3.45000 4,318.000 3.99525 2
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     47,578.000 .41000 1
164 2027 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) SY     17,298.000 .27000 1
164 2028 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) AC     4.910 2,550.00000 1
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY     8,649.000 .22000 1
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY     8,649.000 .22000 1
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 1,702.000 1.92000 4,318.000 1.39292 2
164 6041 DRILL SEEDING (TEMP) (WARM) SY 851.000 1.92000 2,159.000 1.39292 2
164 6043 DRILL SEEDING (TEMP) (COOL) SY 851.000 1.92000 2,159.000 1.39292 2