AVERAGE LOW BID UNIT PRICE - MAINTENANCE - SAN ANTONIO DISTRICT

Last Update: Thursday, March 20, 2014
ITEMS 500 2001 TO 560 2015
Items Items Bid Code Range
0100 - 0169
0247 - 0275
0310 - 0354
0400 - 0496
0500 - 0560
0621 - 0690
0712 - 0780
1122 - 1122
3224 - 3279
4159 - 4601
5049 - 5369
6006 - 6834
7094 - 7610
8094 - 8604
9606 - 9606
500 2001 - 560 2015
Item No Description Units February 28, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 1.000 30,000.00000 15.000 100,354.34133 15
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 12,000.00000 52.000 3,682.24923 14
502 2045 LANE CLOSURES EA     128.000 2,195.00000 2
506 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     140.000 23.54000 1
506 2009 ROCK FILTER DAMS (REMOVE) LF     140.000 9.27000 1
506 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     750.000 13.44600 2
506 2019 CONSTRUCTION EXITS (REMOVE) SY     750.000 8.27200 2
506 2026 FRNT END LOADER WORK (ERSN & SEDM CONT HR     7.000 100.00000 1
506 2034 TEMPORARY SEDIMENT CONTROL FENCE LF     300.000 3.00000 1
510 2001 ONE - WAY TRAFFIC CONTROL HR     3,180.000 83.83547 5
512 2008 PORT CTB (FUR & INST) (LOW PROF) (TY 1) LF     1,140.000 16.39000 1
512 2009 PORT CTB (FUR & INST) (LOW PROF) (TY 2) LF     40.000 20.91000 1
512 2010 PORT CTB (DES SOURCE) (SAFETY SH) (TY 1) LF     840.000 7.00000 1
512 2037 PORT CTB (REMOVE) (SAFETY SH) (TY 1) LF     840.000 5.00000 1
512 2044 PORT CTB (REMOVE) (LOW PROF) (TY 1) LF     1,140.000 7.39000 1
512 2045 PORT CTB (REMOVE) (LOW PROF) (TY 2) LF     40.000 7.39000 1
529 2002 CONC CURB (TY II) LF     270.000 19.36000 1
530 2006 INTERSECTIONS (SURF TREAT) SY     370.000 28.69000 1
530 2011 DRIVEWAYS (ACP) SY     620.000 38.66000 1
530 2012 DRIVEWAYS (SURF TREAT) SY     4,616.000 19.87000 1
530 2018 TURNOUTS (SURF TREAT) SY     440.000 35.72000 1
531 2005 CURB RAMPS (TY 1) EA     8.000 1,843.21000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     358,752.000 0.15083 3
536 2002 CONC MEDIAN SY     187.000 62.76000 1
536 2004 CONC DIRECTIONAL ISLAND SY     200.000 73.63000 2
540 2001 MTL W - BEAM GD FEN (TIM POST) LF     1,540.000 31.17403 5
540 2005 TERMINAL ANCHOR SECTION EA     19.000 547.76105 4
540 2007 MTL W - BEAM GD FEN ADJUSTMENT LF     29,441.000 1.90000 1
540 2009 TERMINAL ANCHOR SECTION ADJUSTMENT EA     54.000 55.00000 1
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     1.000 1,700.00000 1
540 2013 MTL BEAM GD FEN TRANS (T101) EA     3.000 770.07000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF     100.000 8.05000 2
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     10.000 45.00000 1
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     10.000 2,100.35100 4
544 2002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     59.000 500.00000 1
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     1.000 800.00000 1
545 2052 CRASH CUSH ATTEN (INSTL) (SFPM - 17 BRL AS EA     1.000 18,000.00000 1
545 2053 CRASH CUSH ATTEN (REMOV) (SFPM - 17 BRL AS EA     1.000 2,000.00000 1
560 2007 MAILBOX INSTALL - D (TWW - POST) TY 4 FND - T EA     2.000 255.26000 1
560 2008 MAILBOX INSTALL - M (TWW - POST) TY 4 FND - T EA     2.000 486.26000 1
560 2015 MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB EA     9.000 192.64000 1