AVERAGE LOW BID UNIT PRICE - MAINTENANCE - SAN ANTONIO DISTRICT
Last Update: Wednesday, April 3, 2013
| ITEMS 400 2005 TO 496 2042 |
| Item No |
Description |
Units |
March 31, 2013 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 400 2005 |
CEM STABIL BKFL |
CY |
|
|
126.000 |
70.00000 |
2 |
| 400 2006 |
CUT & RESTORING PAV |
SY |
|
|
1,243.410 |
50.87346 |
5 |
| 401 2001 |
FLOWABLE BACKFILL |
CY |
4.000 |
200.00000 |
192.000 |
99.89583 |
5 |
| 402 2001 |
TRENCH EXCAVATION PROTECTION |
LF |
|
|
31.000 |
9.00000 |
1 |
| 416 2002 |
DRILL SHAFT (24 IN) |
LF |
435.000 |
148.00000 |
435.000 |
148.00000 |
1 |
| 416 2015 |
DRILL SHAFT (NON - REINFORCED) (12 IN) |
LF |
|
|
12.000 |
75.00000 |
1 |
| 416 2018 |
DRILL SHAFT (SIGN MTS) (24 IN) |
LF |
|
|
388.000 |
100.00000 |
1 |
| 416 2022 |
DRILL SHAFT (SIGN MTS) (48 IN) |
LF |
|
|
50.000 |
325.00000 |
1 |
| 416 2023 |
DRILL SHAFT (SIGN MTS) (54 IN) |
LF |
|
|
26.000 |
345.00000 |
1 |
| 416 2029 |
DRILL SHAFT (RDWY ILL POLE) (30 IN) |
LF |
|
|
24.000 |
120.00000 |
1 |
| 420 2001 |
CL A CONC (MISC) |
CY |
|
|
8.800 |
520.00000 |
1 |
| 420 2006 |
CL C CONC (RAIL FOUNDATION) |
CY |
|
|
9.000 |
500.00000 |
1 |
| 420 2013 |
CL C CONC (MISC) |
CY |
|
|
14.000 |
350.00000 |
1 |
| 420 2052 |
CL C CONC (PILASTER) |
CY |
57.400 |
1,210.00000 |
57.400 |
1,210.00000 |
1 |
| 423 2001 |
RETAINING WALL (MSE) |
SF |
|
|
2,971.900 |
73.90000 |
1 |
| 427 2009 |
CONCRETE PAINT (EXISTING CONCRETE) |
SF |
|
|
700.000 |
6.00000 |
2 |
| 427 2010 |
CONCRETE PAINT (NEW CONCRETE) |
SF |
|
|
1,036.000 |
6.00000 |
2 |
| 429 2007 |
CNC STR REP (HORIZONTAL) |
SF |
|
|
20.000 |
250.00000 |
1 |
| 431 2001 |
PNEUM PLAC CONC (ENCASE) |
SF |
4,260.000 |
18.00000 |
4,260.000 |
18.00000 |
1 |
| 432 2001 |
RIPRAP (CONC) (4 IN) |
CY |
|
|
54.200 |
366.60517 |
7 |
| 432 2002 |
RIPRAP (CONC) (5 IN) |
CY |
|
|
274.000 |
314.00000 |
1 |
| 432 2016 |
RIPRAP (STONE COMMON) (DRY) (8 IN) |
CY |
|
|
824.900 |
71.71999 |
1 |
| 432 2023 |
RIPRAP (STONE PROTECTION) (24 IN) |
CY |
|
|
61.000 |
140.00000 |
1 |
| 432 2039 |
RIPRAP (MOW STRIP) (4 IN) |
CY |
|
|
224.200 |
442.56441 |
5 |
| 438 2009 |
CLEAN AND SEAL EXIST JOINTS (CL - 7) |
LF |
|
|
470.000 |
25.00000 |
2 |
| 442 2048 |
STRUCTURAL STEEL (MISC NON - BRIDGE) |
LB |
43,056.000 |
1.22000 |
44,006.000 |
1.40954 |
2 |
| 450 2039 |
RAIL (TY SSTR) (MOD) |
LF |
|
|
120.000 |
120.00000 |
2 |
| 450 2072 |
RAIL (HANDRAIL) (TY A) |
LF |
|
|
763.000 |
65.00000 |
1 |
| 450 2080 |
RAIL (TY T221) |
LF |
|
|
25.000 |
75.00000 |
1 |
| 452 2008 |
REMOV RAIL (CTB) |
LF |
|
|
212.000 |
40.00000 |
2 |
| 454 2007 |
HEADER TYPE EXPANSION JOINT |
CF |
|
|
520.100 |
339.75985 |
2 |
| 454 2008 |
JOINT SEALANT |
LF |
|
|
2,052.000 |
5.26511 |
2 |
| 459 2001 |
GABIONS (PVC) |
CY |
|
|
166.000 |
200.00000 |
2 |
| 459 2002 |
GABIONS (GALV) |
CY |
|
|
116.000 |
200.00000 |
1 |
| 459 2007 |
GABION MATTRESSES (PVC) (12 IN) |
SY |
|
|
1,184.000 |
50.00000 |
2 |
| 459 2011 |
GABION MATTRESSES (GALV) (12 IN) |
SY |
|
|
848.000 |
40.00000 |
1 |
| 459 2014 |
GABIONS (3' X 3') (GALV) |
CY |
|
|
29.000 |
200.00000 |
1 |
| 460 2017 |
CMP AR (GAL STL DES 5) |
LF |
|
|
22.000 |
200.00000 |
1 |
| 464 2005 |
RC PIPE (CL III) (24 IN) |
LF |
|
|
232.000 |
74.00000 |
1 |
| 464 2064 |
RC PIPE (ARCH) (CL III) (DES 3) |
LF |
|
|
104.000 |
150.00000 |
1 |
| 467 2224 |
SET (TY II) (24 IN) (RCP) (4: 1) (C) |
EA |
|
|
8.000 |
1,800.00000 |
1 |
| 467 2353 |
SET (TY II) (DES 3) (RCP) (4: 1) (C) |
EA |
|
|
4.000 |
1,500.00000 |
1 |
| 467 2364 |
SET (TY I) (S=8 FT) (HW=4 FT) (4: 1) (C) |
EA |
|
|
2.000 |
750.00000 |
1 |
| 496 2004 |
REMOV STR (SET) |
EA |
|
|
3.000 |
2,166.66667 |
2 |
| 496 2006 |
REMOV STR (HEADWALL) |
EA |
|
|
2.000 |
355.00000 |
1 |
| 496 2007 |
REMOV STR (PIPE) |
LF |
|
|
104.000 |
17.00000 |
1 |
| 496 2040 |
REMOV STR (RET WALL) |
LF |
|
|
92.000 |
30.00000 |
2 |
| 496 2042 |
REMOV STR (SMALL) |
EA |
|
|
1.000 |
4,000.00000 |
1 |