AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - LAREDO DISTRICT

Last Update: Friday, May 3, 2013
ITEMS 100 2002 TO 168 2001
Items Items Bid Code Range
0100 - 0168
0216 - 0247
0310 - 0368
0400 - 0496
0500 - 0560
0610 - 0690
0740 - 0740
1109 - 1127
3224 - 3263
5165 - 5926
6006 - 6834
8089 - 8930
100 2002 - 168 2001
Item No Description Units April 30, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA     1,801.560 546.60183 6
100 2014 PREPARING ROW (TREE) (20" TO 42" DIA) EA     4.000 500.00000 1
104 2001 REMOVING CONC (PAV) SY     290.000 12.00000 1
104 2009 REMOVING CONC (RIPRAP) SY     1,802.000 12.75314 5
104 2014 REMOVING CONC (FOUNDATIONS) CY     2.000 150.00000 1
104 2015 REMOVING CONC (SIDEWALKS) SY     589.000 10.86587 2
104 2017 REMOVING CONC (DRIVEWAYS) SY     1,417.000 10.18137 3
104 2021 REMOVING CONC (CURB) LF     402.000 1.50000 1
104 2022 REMOVING CONC (CURB AND GUTTER) LF     5,460.000 5.00000 1
104 2024 REMOVING CONC (RETAINING WALLS) SY     23.000 40.00000 1
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     3,357.000 7.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     384.000 10.00000 1
104 2040 REMOVING CONC (PAVERS) SY     250.000 11.56800 2
104 2044 REMOVING CONC (FLUME) SY     221.000 10.20000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     15,858.000 2.00000 1
105 2033 REMOVING STB BASE AND ASPH PAV (10 - 14") SY     532.000 15.30000 1
105 2037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     56.000 30.00000 1
105 2046 REMOVING STAB BASE & ASPH PAV (0" - 10") SY     97.000 30.00000 1
105 2074 REMOVING STAB BASE AND ASPH PAV (4") SY     5,999.340 4.00000 1
110 2001 EXCAVATION (ROADWAY) CY     129,645.400 7.61167 5
110 2002 EXCAVATION (CHANNEL) CY     431.000 12.61949 3
110 2007 EXCAVATION (ROADWAY) (OPT1) CY     5,360.000 5.20000 1
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     65,770.440 8.00769 3
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     301,738.000 17.01258 2
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     60,524.000 7.02844 2
134 2001 BACKFILL (TY A) STA     3,470.160 75.63743 5
150 2002 BLADING HR     110.000 142.98636 2
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY     9,673.000 3.00000 1
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY     5,091.000 6.00000 1
162 2002 BLOCK SODDING SY     5,091.000 2.25000 1
164 2027 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) SY     9,673.000 .40000 1
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     122,923.000 .26720 2
164 2036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC     147.000 1,020.40816 2
164 2039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY     49,752.000 .20000 1
164 2041 DRILL SEEDING (TEMP) (WARM) SY     122,154.000 .20000 1
164 2042 DRILL SEEDING (TEMP) (WARM) AC     147.000 842.85714 2
164 2043 DRILL SEEDING (TEMP) (COOL) SY     122,154.000 .20000 1
168 2001 VEGETATIVE WATERING MG     1,807.000 17.27172 3