AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - LAREDO DISTRICT
| ITEMS 100 2002 TO 168 2001 |
| Items | Items | Bid Code Range |
|---|---|---|
| 0100 - 0168 0216 - 0247 0310 - 0368 0400 - 0496 0500 - 0560 0610 - 0690 0740 - 0740 |
1109 - 1127 3224 - 3263 5165 - 5926 6006 - 6834 8089 - 8930 |
100 2002 - 168 2001 |
| Item No | Description | Units | April 30, 2013 | Twelve Month Moving | Usage | ||
|---|---|---|---|---|---|---|---|
| Quantity | Avg Bid | Quantity | Avg Bid | ||||
| 100 2002 | PREPARING ROW | STA | 1,801.560 | 546.60183 | 6 | ||
| 100 2014 | PREPARING ROW (TREE) (20" TO 42" DIA) | EA | 4.000 | 500.00000 | 1 | ||
| 104 2001 | REMOVING CONC (PAV) | SY | 290.000 | 12.00000 | 1 | ||
| 104 2009 | REMOVING CONC (RIPRAP) | SY | 1,802.000 | 12.75314 | 5 | ||
| 104 2014 | REMOVING CONC (FOUNDATIONS) | CY | 2.000 | 150.00000 | 1 | ||
| 104 2015 | REMOVING CONC (SIDEWALKS) | SY | 589.000 | 10.86587 | 2 | ||
| 104 2017 | REMOVING CONC (DRIVEWAYS) | SY | 1,417.000 | 10.18137 | 3 | ||
| 104 2021 | REMOVING CONC (CURB) | LF | 402.000 | 1.50000 | 1 | ||
| 104 2022 | REMOVING CONC (CURB AND GUTTER) | LF | 5,460.000 | 5.00000 | 1 | ||
| 104 2024 | REMOVING CONC (RETAINING WALLS) | SY | 23.000 | 40.00000 | 1 | ||
| 104 2029 | REMOVING CONC (CURB OR CURB & GUTTER) | LF | 3,357.000 | 7.00000 | 1 | ||
| 104 2036 | REMOVING CONC (SIDEWALK OR RAMP) | SY | 384.000 | 10.00000 | 1 | ||
| 104 2040 | REMOVING CONC (PAVERS) | SY | 250.000 | 11.56800 | 2 | ||
| 104 2044 | REMOVING CONC (FLUME) | SY | 221.000 | 10.20000 | 1 | ||
| 105 2008 | REMOVING STAB BASE AND ASPH PAV (6") | SY | 15,858.000 | 2.00000 | 1 | ||
| 105 2033 | REMOVING STB BASE AND ASPH PAV (10 - 14") | SY | 532.000 | 15.30000 | 1 | ||
| 105 2037 | REMOVING STAB BASE AND ASPH PAV (0" - 16" | SY | 56.000 | 30.00000 | 1 | ||
| 105 2046 | REMOVING STAB BASE & ASPH PAV (0" - 10") | SY | 97.000 | 30.00000 | 1 | ||
| 105 2074 | REMOVING STAB BASE AND ASPH PAV (4") | SY | 5,999.340 | 4.00000 | 1 | ||
| 110 2001 | EXCAVATION (ROADWAY) | CY | 129,645.400 | 7.61167 | 5 | ||
| 110 2002 | EXCAVATION (CHANNEL) | CY | 431.000 | 12.61949 | 3 | ||
| 110 2007 | EXCAVATION (ROADWAY) (OPT1) | CY | 5,360.000 | 5.20000 | 1 | ||
| 132 2001 | EMBANKMENT (FINAL) (ORD COMP) (TY A) | CY | 65,770.440 | 8.00769 | 3 | ||
| 132 2002 | EMBANKMENT (FINAL) (DENS CONT) (TY A) | CY | 301,738.000 | 17.01258 | 2 | ||
| 132 2006 | EMBANKMENT (FINAL) (DENS CONT) (TY C) | CY | 60,524.000 | 7.02844 | 2 | ||
| 134 2001 | BACKFILL (TY A) | STA | 3,470.160 | 75.63743 | 5 | ||
| 150 2002 | BLADING | HR | 110.000 | 142.98636 | 2 | ||
| 160 2004 | FURNISHING AND PLACING TOPSOIL (6") | SY | 9,673.000 | 3.00000 | 1 | ||
| 161 2005 | COMPOST MANUF TOPSOIL (PB) (4") | SY | 5,091.000 | 6.00000 | 1 | ||
| 162 2002 | BLOCK SODDING | SY | 5,091.000 | 2.25000 | 1 | ||
| 164 2027 | CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) | SY | 9,673.000 | .40000 | 1 | ||
| 164 2035 | DRILL SEEDING (PERM) (RURAL) (CLAY) | SY | 122,923.000 | .26720 | 2 | ||
| 164 2036 | DRILL SEEDING (PERM) (RURAL) (CLAY) | AC | 147.000 | 1,020.40816 | 2 | ||
| 164 2039 | DRILL SEEDING (PERM) (URBAN) (CLAY) | SY | 49,752.000 | .20000 | 1 | ||
| 164 2041 | DRILL SEEDING (TEMP) (WARM) | SY | 122,154.000 | .20000 | 1 | ||
| 164 2042 | DRILL SEEDING (TEMP) (WARM) | AC | 147.000 | 842.85714 | 2 | ||
| 164 2043 | DRILL SEEDING (TEMP) (COOL) | SY | 122,154.000 | .20000 | 1 | ||
| 168 2001 | VEGETATIVE WATERING | MG | 1,807.000 | 17.27172 | 3 | ||