Item No Description Units March 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS     14.000 501,602.00357 14
500 6001 MOBILIZATION LS 4.000 406,954.15250 6.000 621,934.28500 6
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO     114.000 10,083.60623 14
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 26.000 19,634.61538 60.000 18,818.33333 6
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 300.000 43.00000 3,398.000 17.36021 5
506 6024 CONSTRUCTION EXITS (REMOVE) SY 300.000 19.50000 3,398.000 11.49794 5
506 6035 SANDBAGS FOR EROSION CONTROL EA 3,240.000 12.70062 7,930.000 9.60593 5
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,035.000 3.04914 3,155.000 3.74168 3
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,035.000 1.50000 3,155.000 1.67750 3
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF     1,020.000 5.50000 1
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF     1,020.000 1.65000 1
508 2002 CONSTRUCTING DETOURS SY     27,816.000 46.47555 3
508 2003 CONSTRUCTING DETOURS EA     4.000 260,000.00000 1
512 2008 PORT CTB (FUR & INST) (LOW PROF) (TY 1) LF     620.000 55.00000 1
512 2009 PORT CTB (FUR & INST) (LOW PROF) (TY 2) LF     40.000 55.00000 1
512 2026 PORT CTB (MOVE) (LOW PROF) (TY 1) LF     980.000 4.50000 1
512 2027 PORT CTB (MOVE) (LOW PROF) (TY 2) LF     80.000 4.60000 1
512 2035 PORT CTB (STKPL) (LOW PROF) (TY 1) LF     620.000 12.20000 1
512 2036 PORT CTB (STKPL) (LOW PROF) (TY 2) LF     40.000 10.80000 1
512 2048 PORT CTB (FUR & INST) (F - SHAPE) (TY 1) LF     16,710.000 55.00000 1
512 2050 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF     32,190.000 4.55000 1
512 2051 PORT CTB (STOCKPILE) (F - SHAPE) (TY 1) LF     16,710.000 8.35000 1
514 2015 PERM CONC TRF BARR (F - SHAPE) (TY 1) LF     4,349.000 67.75000 1
514 2016 PERM CONC TRF BARR (F - SHAPE) (TY 2) LF     240.000 81.75000 1
514 2017 PERM CONC TRF BARR (F - SHAPE) (TY 3) LF     472.000 91.75000 1
528 2004 LANDSCAPE PAVERS SY     274.000 60.00000 1
529 2003 CONC CURB & GUTTER (TY I) LF     837.100 25.00000 1
529 2004 CONC CURB & GUTTER (TY II) LF     29,199.200 15.42461 4
529 2009 CONCRETE CURB (SPECIAL) LF     1,670.000 41.75000 1
529 2011 CONC CURB & GUTTER (SAWTOOTH) LF     10.000 31.50000 1
529 2017 CONC CURB & GUTTER (VALLEY GUTTER) LF     92.000 58.60000 1
529 2076 CONC GUTTER (2') LF     169.900 33.00000 1
530 2004 INTERSECTIONS (CONC) SY     132.000 129.00000 1
530 2010 DRIVEWAYS (CONC) SY     6,909.100 87.95044 5
530 2012 DRIVEWAYS (SURF TREAT) SY     2,945.000 65.50000 1
530 2020 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY     4,124.700 52.00000 1
530 6003 INTERSECTIONS (SURF TREAT) SY 1,603.000 55.00000 4,800.000 33.98113 3
530 6005 DRIVEWAYS (ACP) SY 1,665.000 51.04234 2,277.000 64.20092 3
530 6006 DRIVEWAYS (SURF TREAT) SY 1,205.000 55.00000 4,703.000 37.08163 3
530 6008 TURNOUTS (ACP) SY 413.000 84.77845 413.000 84.77845 2
530 6009 TURNOUTS (SURF TREAT) SY 230.000 57.08696 454.000 42.39780 4
531 2005 CURB RAMPS (TY 1) EA     2.000 1,600.00000 1
531 2015 CONC SIDEWALKS (4") SY     12,450.200 55.31624 3
531 2054 CURB RAMPS SY     302.000 152.98013 2
531 2073 CURB RAMPS (TY 10) SY     22.000 183.90000 1
531 2085 CURB RAMPS (SPECIAL) SY     214.500 131.94545 2
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     216,300.000 .15000 1
533 6001 RUMBLE STRIPS (SHOULDER) LF     475,558.000 .20000 2
533 6002 RUMBLE STRIPS (CENTERLINE) LF     316,544.000 .22714 2
536 2002 CONC MEDIAN SY     1,128.580 69.15150 3
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     2,905.000 20.42680 2
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     14.000 1,550.00000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     12.000 995.50667 2
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF 815.000 20.00000 815.000 20.00000 1
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 1.000 1,700.00000 1.000 1,700.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF     2,867.000 2.25270 2
542 6001 REMOVE METAL BEAM GUARD FENCE LF 815.000 1.20000 815.000 1.20000 1
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 10.000 120.00000 10.000 120.00000 1
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     21.000 2,170.87619 2
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     10.000 310.00000 2
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 10.000 190.00000 10.000 190.00000 1
544 6007 GDRAIL END TRT (INSTALL) (HBA POST) EA 20.000 1,900.00000 20.000 1,900.00000 1
545 2084 CRASH CUSH ATTEN (INSTL) (L) (N) (70) EA     2.000 22,000.00000 1
545 2089 CRASH CUSH ATTEN (INSTL) (R) (N) (TL3) EA     1.000 15,650.00000 1
545 2095 CRASH CUSH ATTEN (INSTL) (S) (N) (TL3) EA     13.000 6,500.00000 1
545 2100 CRASH CUSHION ATTENUATOR (MOVE & RESET EA     17.000 2,000.00000 1
545 2101 CRASH CUSHION ATTENUATOR (REMOVE) EA     15.000 933.33333 2
560 2011 MAILBOX INSTALL - S (TWG - POST) TY 2 FND EA     22.000 227.04545 2
560 2013 MAILBOX INSTALL - D (TWG - POST) TY 2 FND EA     2.000 325.00000 1
560 2024 MAILBOX INSTALL - M (TWG - POST) TY 2 FND EA     4.000 435.00000 1
560 2028 MAILBOX INSTALL - S (TWG - POST) TY 7 FND EA     11.000 355.00000 1
560 2034 MAILBOX INSTLTION (MULTIPLE) INSTALL ONL EA     7.000 315.00000 1
560 6001 MAILBOX INSTALL - S (TWG - POST) TY 1 EA 2.000 300.00000 2.000 300.00000 1
560 6003 MAILBOX INSTALL - M (TWG - POST) TY 1 EA 1.000 500.00000 1.000 500.00000 1
560 6007 MAILBOX INSTALL - S (WC - POST) TY 3 EA 4.000 272.50000 18.000 234.40000 4
560 6008 MAILBOX INSTALL - D (WC - POST) TY 3 EA     1.000 269.50000 1