| 100 2002 | PREPARING ROW | STA | 284.800 | 3,818.29003 | 3 | ||
| 100 2006 | PREP ROW (TREE) (LESS THAN 24" DIA) | EA | 92.000 | 1,500.00000 | 1 | ||
| 100 2008 | PREPARING ROW (TREE) (0" TO 6" DIA) | EA | 11.000 | 90.91000 | 1 | ||
| 103 2001 | DISPOSAL OF WATER WELLS | EA | 3.000 | 6,500.00000 | 1 | ||
| 104 2001 | REMOVING CONC (PAV) | SY | 31,987.000 | 10.95167 | 3 | ||
| 104 2009 | REMOVING CONC (RIPRAP) | SY | 40,662.000 | 7.67558 | 4 | ||
| 104 2011 | REMOVING CONC (MEDIANS) | SY | 2,141.000 | 10.10012 | 3 | ||
| 104 2013 | REMOVING CONC (FOUNDATIONS) | SY | 17.000 | 65.00000 | 1 | ||
| 104 2015 | REMOVING CONC (SIDEWALKS) | SY | 870.000 | 11.81161 | 3 | ||
| 104 2017 | REMOVING CONC (DRIVEWAYS) | SY | 3,797.000 | 8.89787 | 5 | ||
| 104 2021 | REMOVING CONC (CURB) | LF | 524.000 | 2.05000 | 1 | ||
| 104 2022 | REMOVING CONC (CURB AND GUTTER) | LF | 45,389.000 | 3.80178 | 5 | ||
| 104 2024 | REMOVING CONC (RETAINING WALLS) | SY | 184.000 | 41.00000 | 1 | ||
| 104 2026 | REMOVE CONC (GUTTER) | LF | 194.000 | 5.00000 | 1 | ||
| 104 2029 | REMOVING CONC (CURB OR CURB & GUTTER) | LF | 2,936.000 | 4.00000 | 1 | ||
| 104 2032 | REMOVING CONC (WHEELCHAIR RAMP) | SY | 61.000 | 18.73770 | 2 | ||
| 104 2036 | REMOVING CONC (SIDEWALK OR RAMP) | SY | 36.000 | 55.00000 | 1 | ||
| 104 2037 | REMOVE CONC (RAIL) | LF | 70.000 | 43.00000 | 1 | ||
| 104 2040 | REMOVING CONC (PAVERS) | SY | 136.000 | 15.85000 | 1 | ||
| 105 2002 | REMOVING STAB BASE AND ASPH PAV (2") | SY | 2,215.000 | 2.75000 | 1 | ||
| 105 2008 | REMOVING STAB BASE AND ASPH PAV (6") | SY | 2,731.000 | 4.50000 | 1 | ||
| 106 2001 | OBLITERATING ABANDONED ROAD | STA | 160.460 | 910.20697 | 1 | ||
| 106 2002 | OBLITERATING ABANDONED ROAD | SY | 8,440.000 | 2.65000 | 1 | ||
| 110 2001 | EXCAVATION (ROADWAY) | CY | 202,326.000 | 5.87317 | 5 | ||
| 110 2002 | EXCAVATION (CHANNEL) | CY | 23,438.000 | 7.35340 | 2 | ||
| 110 2003 | EXCAVATION (SPECIAL) | CY | 3,900.000 | 12.39744 | 3 | ||
| 112 2001 | SUBGRADE WIDENING (ORD COMP) | STA | 8.000 | 700.00000 | 1 | ||
| 112 2002 | SUBGRADE WIDENING (DENS CONT) | STA | 135.000 | 380.37037 | 2 | ||
| 132 2003 | EMBANKMENT (FINAL) (ORD COMP) (TY B) | CY | 11,532.000 | 14.00000 | 1 | ||
| 132 2006 | EMBANKMENT (FINAL) (DENS CONT) (TY C) | CY | 412,152.000 | 19.26591 | 5 | ||
| 134 2002 | BACKFILL (TY B) | STA | 224.500 | 73.74833 | 3 | ||
| 150 2001 | BLADING | STA | 113.000 | 75.00000 | 1 | ||
| 158 2002 | SPEC EXCAV WORK (BACKHOE) | HR | 40.000 | 140.00000 | 1 | ||
| 160 2002 | FURNISHING AND PLACING TOPSOIL (6") | STA | 72.750 | 980.00000 | 1 | ||
| 160 2004 | FURNISHING AND PLACING TOPSOIL (6") | SY | 10,100.000 | 5.75000 | 1 | ||
| 160 2005 | FURNISHING AND PLACING TOPSOIL | CY | 6,000.000 | 10.83900 | 1 | ||
| 161 2014 | COMPOST MANUF TOPSOIL (BOS OR PB) (4") | SY | 73,486.000 | 2.00000 | 1 | ||
| 161 2026 | COMPOST MANUF TOPSOIL (BOS OR PB) (6") | SY | 143,891.000 | 2.28658 | 2 | ||
| 162 2002 | BLOCK SODDING | SY | 18,422.000 | 4.64264 | 5 | ||
| 162 2003 | STRAW OR HAY MULCH | SY | 135.000 | 1.10000 | 1 | ||
| 164 2013 | STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY | SY | 24,800.000 | 1.07867 | 2 | ||
| 164 2025 | CELL FBR MLCH SEED (PERM) (URBAN) (SANDY) | SY | 242,760.000 | .22293 | 3 | ||
| 164 2037 | DRILL SEEDING (PERM) (URBAN) (SANDY) | SY | 165,845.000 | .11710 | 2 | ||
| 164 2038 | DRILL SEEDING (PERM) (URBAN) (SANDY) | AC | 18.240 | 520.00000 | 1 | ||
| 164 2041 | DRILL SEEDING (TEMP) (WARM) | SY | 19,676.000 | 1.20000 | 1 | ||
| 164 2042 | DRILL SEEDING (TEMP) (WARM) | AC | 8.020 | 520.00000 | 1 | ||
| 164 2043 | DRILL SEEDING (TEMP) (COOL) | SY | 19,676.000 | 1.20000 | 1 | ||
| 164 2044 | DRILL SEEDING (TEMP) (COOL) | AC | 8.020 | 520.00000 | 1 | ||
| 164 2051 | DRILL SEED (TEMP) (WARM OR COOL) | SY | 168,040.000 | .11688 | 2 | ||
| 164 2053 | DRILL SEEDING (TEMP) (WARM OR COOL) | AC | 8.300 | 369.97952 | 1 | ||
| 166 2001 | FERTILIZER | AC | 2.100 | 440.00000 | 1 | ||
| 168 2001 | VEGETATIVE WATERING | MG | 8,025.000 | 15.99942 | 6 | ||
| 169 2006 | SOIL RETENTION BLANKETS (CL 2) (TY F) | SY | 11,000.000 | 1.68000 | 1 | ||
| 170 2001 | IRRIGATION SYSTEM | LS | 14.000 | 9,821.42857 | 3 | ||
| 192 2015 | LANDSCAPE EDGE | LF | 2,160.000 | 6.45000 | 1 | ||
| 192 2017 | VEGETATION BARRIER | SY | 1,000.000 | 5.05000 | 1 | ||
| 192 2031 | PLANT MATERIAL (5 GAL) (SHRUB) | EA | 66.000 | 56.00000 | 1 | ||
| 192 2044 | PLANT MATERIAL (MIN 2" CAL) (B & B) | EA | 41.000 | 560.00000 | 2 | ||
| 192 2046 | PLANT MATERIAL (MIN 3" CAL) (B & B) | EA | 108.000 | 385.00000 | 1 | ||
| 193 2001 | PLANT MAINTENANCE | MO | 12.000 | 250.00000 | 1 | ||