| Item No |
Description |
Units |
December 31, 2008 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 100 2008 |
PREPARING ROW (TREE) (0" TO 6" DIA) |
EA |
|
|
6.000 |
645.00000 |
1 |
| 100 2009 |
PREPARING ROW (TREE) (6" TO 24" DIA) |
EA |
|
|
15.000 |
770.00000 |
1 |
| 104 2001 |
REMOVING CONC (PAV) |
SY |
|
|
130.000 |
32.00000 |
1 |
| 104 2011 |
REMOVING CONC (MEDIANS) |
SY |
|
|
438.000 |
13.50000 |
1 |
| 104 2017 |
REMOVING CONC (DRIVEWAYS) |
SY |
|
|
609.000 |
20.50000 |
1 |
| 104 2022 |
REMOVING CONC (CURB AND GUTTER) |
LF |
|
|
1,690.000 |
6.65000 |
1 |
| 104 2025 |
REMOVE CONC (WINGWALL) |
CY |
|
|
.500 |
900.00000 |
1 |
| 104 2028 |
REMOVING CONC (MISC) |
SY |
|
|
150.000 |
20.50000 |
1 |
| 104 2031 |
REMOVING CONC (HEADWALL) |
CY |
|
|
.300 |
900.00000 |
1 |
| 104 2032 |
REMOVING CONC (WHEELCHAIR RAMP) |
SY |
|
|
7.000 |
33.50000 |
1 |
| 106 2001 |
OBLITERATING ABANDONED ROAD |
STA |
|
|
59.000 |
2,000.00000 |
1 |
| 110 2001 |
EXCAVATION (ROADWAY) |
CY |
|
|
22,527.000 |
12.60521 |
2 |
| 110 2002 |
EXCAVATION (CHANNEL) |
CY |
|
|
2,679.000 |
11.50000 |
1 |
| 110 2003 |
EXCAVATION (SPECIAL) |
CY |
|
|
200.000 |
33.50000 |
1 |
| 110 2004 |
EXCAVATION (ROADWAY AND CHANNEL) |
CY |
|
|
1,619.000 |
11.65000 |
1 |
| 132 2006 |
EMBANKMENT (FINAL) (DENS CONT) (TY C) |
CY |
|
|
3,867.000 |
17.02471 |
3 |
| 134 2004 |
BACKFILL (TY A OR B) |
STA |
|
|
3.200 |
1,500.00000 |
1 |
| 150 2002 |
BLADING |
HR |
|
|
10.000 |
235.00000 |
1 |
| 160 2006 |
FURNISHING AND PLACING TOPSOIL (3") |
SY |
|
|
17,174.000 |
1.45000 |
1 |
| 161 2008 |
EROSION CONTROL COMPOST (2") |
SY |
|
|
17,174.000 |
1.55000 |
1 |
| 162 2002 |
BLOCK SODDING |
SY |
|
|
4,286.000 |
3.35000 |
1 |
| 164 2015 |
STRAW / HAY MLCH SEED (PERM) (RURAL) (CLAY) |
SY |
|
|
11,650.000 |
.32000 |
1 |
| 164 2035 |
DRILL SEEDING (PERM) (RURAL) (CLAY) |
SY |
|
|
17,174.000 |
.17000 |
1 |
| 168 2001 |
VEGETATIVE WATERING |
MG |
|
|
74.100 |
40.48988 |
2 |