Item No Description Units July 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 2.000 309,500.00000 18.000 183,683.04833 18
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 21.000 2,214.28571 109.000 3,999.58165 18
508 2001 CONSTRUCTING DETOURS STA     7.900 25,000.00000 1
508 2005 CONSTRUCTING DETOURS (EBSS) SY 1,006.000 15.00000 1,006.000 15.00000 1
510 2001 ONE - WAY TRAFFIC CONTROL HR 288.000 105.00000 1,058.000 102.53951 4
512 2002 PORT CTB (FUR & INST) (SAFETY SH) (TY 2) LF     180.000 40.00000 1
512 2038 PORT CTB (REMOVE) (SAFETY SH) (TY 2) LF     180.000 40.00000 1
512 2040 PORT CTB (REMOVE) (SNGL SLP) (TY 1) LF     2,235.000 6.00000 1
528 2001 COLORED TEXTURED CONC (4") SY     696.000 104.50000 1
529 2004 CONC CURB & GUTTER (TY II) LF 1,248.000 22.00000 7,402.000 25.49187 2
529 2006 CONC CURB (MONO) (TY II) LF     150.000 20.90000 1
530 2010 DRIVEWAYS (CONC) SY 55.000 65.00000 1,190.000 83.36029 2
530 2011 DRIVEWAYS (ACP) SY 541.000 45.00000 541.000 45.00000 1
531 2006 CURB RAMPS (TY 2) EA 1.000 1,200.00000 1.000 1,200.00000 1
531 2008 CURB RAMPS (TY 4) EA 1.000 1,200.00000 1.000 1,200.00000 1
531 2010 CURB RAMPS (TY 7) EA     17.000 1,625.00000 1
531 2015 CONC SIDEWALKS (4") SY 40.000 60.00000 2,158.000 92.73184 2
531 2018 CURB RAMPS (SPECIAL) EA     4.000 4,950.00000 1
531 2038 CONC SIDEWALKS (STEPS) SY     29.800 245.00000 1
531 2041 CURB RAMPS (TY 10) EA 4.000 1,200.00000 5.000 1,301.00000 2
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     283,782.000 .16408 3
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF 25.000 25.00000 4,038.000 19.66320 7
540 2005 TERMINAL ANCHOR SECTION EA 1.000 2,500.00000 1.000 2,500.00000 1
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     20.000 1,700.00000 4
540 2012 MTL BEAM GD FEN TRANS (TL2) EA 1.000 1,500.00000 17.000 1,102.94118 3
540 2014 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     1,737.000 55.66753 2
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     6.000 1,155.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF     6,300.000 2.63452 4
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     6.000 262.50000 1
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA     4.000 200.00000 1
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     18.000 298.61111 3
544 2013 GDRAIL END TRT (INSTALL) (HBA POST) EA     50.000 2,476.60000 8
545 2081 CRASH CUSH ATT (INSTAL) (TAU - II) (N) (TL - 2 EA 4.000 12,000.00000 4.000 12,000.00000 1
552 2003 WIRE FENCE (TY C) LF 1,080.000 12.00000 7,587.000 10.88362 6
552 2007 GATE (TY 3) EA     2.000 2,000.00000 1
552 2008 WIRE FENCE (WATER GAP) LF     100.000 30.00000 2
560 2018 MAILBOX INSTALL - S (TWG - POST) TY 4 FND EA     10.000 275.97500 2