AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - CHILDRESS DISTRICT

Last Update: Wednesday, July 2, 2014
ITEMS 500 2001 TO 560 2018
Items Items Bid Code Range
0100 - 0169
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0678
0760 - 0760
1122 - 1122
2197 - 2198
3165 - 3268
5369 - 5369
6834 - 6834
8251 - 8251
500 2001 - 560 2018
Item No Description Units June 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 4.000 228,750.00000 16.000 167,955.92938 16
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 31.000 4,671.29032 88.000 4,425.61818 16
508 2001 CONSTRUCTING DETOURS STA 7.900 25,000.00000 7.900 25,000.00000 1
510 2001 ONE - WAY TRAFFIC CONTROL HR 250.000 145.00000 770.000 101.61922 3
512 2002 PORT CTB (FUR & INST) (SAFETY SH) (TY 2) LF 180.000 40.00000 180.000 40.00000 1
512 2038 PORT CTB (REMOVE) (SAFETY SH) (TY 2) LF 180.000 40.00000 180.000 40.00000 1
512 2040 PORT CTB (REMOVE) (SNGL SLP) (TY 1) LF 2,235.000 6.00000 2,235.000 6.00000 1
528 2001 COLORED TEXTURED CONC (4") SY     696.000 104.50000 1
529 2004 CONC CURB & GUTTER (TY II) LF     6,154.000 26.20000 1
529 2006 CONC CURB (MONO) (TY II) LF     150.000 20.90000 1
530 2010 DRIVEWAYS (CONC) SY     1,135.000 84.25000 1
531 2010 CURB RAMPS (TY 7) EA     17.000 1,625.00000 1
531 2015 CONC SIDEWALKS (4") SY     2,118.000 93.35000 1
531 2018 CURB RAMPS (SPECIAL) EA     4.000 4,950.00000 1
531 2038 CONC SIDEWALKS (STEPS) SY     29.800 245.00000 1
531 2041 CURB RAMPS (TY 10) EA     1.000 1,705.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     283,782.000 .16408 3
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF 3,650.000 19.17808 4,013.000 19.62995 6
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 16.000 1,750.00000 20.000 1,700.00000 4
540 2012 MTL BEAM GD FEN TRANS (TL2) EA     16.000 1,078.12500 2
540 2014 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     1,737.000 55.66753 2
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     6.000 1,155.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF 4,550.000 2.39560 6,300.000 2.63452 4
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     6.000 262.50000 1
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA 4.000 200.00000 4.000 200.00000 1
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA 12.000 316.66667 18.000 298.61111 3
544 2013 GDRAIL END TRT (INSTALL) (HBA POST) EA 20.000 2,380.00000 50.000 2,476.60000 8
552 2003 WIRE FENCE (TY C) LF 2,050.000 12.00000 6,507.000 10.69832 5
552 2007 GATE (TY 3) EA 2.000 2,000.00000 2.000 2,000.00000 1
552 2008 WIRE FENCE (WATER GAP) LF 50.000 20.00000 100.000 30.00000 2
560 2018 MAILBOX INSTALL - S (TWG - POST) TY 4 FND EA     10.000 275.97500 2