AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - CHILDRESS DISTRICT

Last Update: Friday, June 26, 2015
ITEMS 100 2002 TO 169 6004
Items Items Bid Code Range
0100 - 0169
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0686
0712 - 0712
1122 - 1122
3000 - 3287
5369 - 5369
8251 - 8251
100 2002 - 169 6004
Item No Description Units June 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA     126.800 2,083.79338 3
104 2009 REMOVING CONC (RIPRAP) SY     55.000 30.00000 1
104 6001 REMOVING CONC (PAV) SY 55,987.000 17.00000 55,987.000 17.00000 1
104 6009 REMOVING CONC (RIPRAP) SY     13.000 57.00000 1
104 6015 REMOVING CONC (SIDEWALKS) SY 1,791.000 27.00000 1,791.000 27.00000 1
104 6017 REMOVING CONC (DRIVEWAYS) SY 3,146.000 19.50000 3,146.000 19.50000 1
104 6021 REMOVING CONC (CURB) LF 12,333.000 2.60000 12,333.000 2.60000 1
104 6032 REMOVING CONC (WHEELCHAIR RAMP) SY 165.000 18.00000 165.000 18.00000 1
105 2018 REMOVING STAB BASE AND ASPH PAV (7") SY     6,839.000 5.00000 1
105 6002 REMOVING STAB BASE AND ASPH PAV (2") SY 5,592.000 2.90000 5,592.000 2.90000 1
110 2001 EXCAVATION (ROADWAY) CY     119,700.000 6.60822 3
110 2002 EXCAVATION (CHANNEL) CY     826.500 19.21960 2
110 6001 EXCAVATION (ROADWAY) CY 4,347.000 23.98769 4,347.000 23.98769 2
110 6002 EXCAVATION (CHANNEL) CY     250.000 42.25000 1
112 2001 SUBGRADE WIDENING (ORD COMP) STA     664.770 303.96603 2
112 6001 SUBGRADE WIDENING (ORD COMP) STA     210.790 270.00000 1
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     4,686.000 18.50000 1
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     9,050.000 20.00000 1
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     85,746.500 6.22242 2
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 602.000 25.00000 2,703.000 26.55457 2
134 2001 BACKFILL (TY A) STA     636.070 295.00000 1
134 2002 BACKFILL (TY B) STA     258.950 333.12416 2
134 6004 BACKFILL (TY A OR B) STA     439.300 336.63064 2
150 2002 BLADING HR     217.000 138.06452 4
150 6002 BLADING HR 4.000 150.00000 48.000 159.58333 3
164 2021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     8,000.000 .80000 1
164 2022 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) AC     .620 5,000.00000 1
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY     4,000.000 .80000 1
164 2030 CELL FBR MLCH SEED (TEMP) (WARM) AC     .620 5,000.00000 1
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY     4,000.000 .80000 1
164 2032 CELL FBR MLCH SEED (TEMP) (COOL) AC     .620 5,000.00000 1
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     13,338.000 .30000 1
164 2034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC     81.941 652.56953 3
164 2036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC     10.570 660.00000 1
164 2041 DRILL SEEDING (TEMP) (WARM) SY     6,669.000 .30000 1
164 2042 DRILL SEEDING (TEMP) (WARM) AC     46.260 586.60073 4
164 2044 DRILL SEEDING (TEMP) (COOL) AC     46.260 595.86684 4
164 6005 BROADCAST SEED (PERM) (URBAN) (SANDY) SY 500.000 6.50000 500.000 6.50000 1
164 6021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     4,000.000 .80000 1
164 6022 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) AC 1.250 5,000.00000 1.250 5,000.00000 1
164 6029 CELL FBR MLCH SEED (TEMP) (WARM) SY     2,000.000 1.40000 1
164 6030 CELL FBR MLCH SEED (TEMP) (WARM) AC .630 3,000.00000 .630 3,000.00000 1
164 6031 CELL FBR MLCH SEED (TEMP) (COOL) SY     2,000.000 1.45000 1
164 6032 CELL FBR MLCH SEED (TEMP) (COOL) AC .630 3,000.00000 .630 3,000.00000 1
164 6034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC     19.900 659.79899 2
164 6042 DRILL SEEDING (TEMP) (WARM) AC     9.960 701.05422 2
164 6044 DRILL SEEDING (TEMP) (COOL) AC     9.960 701.05422 2
168 2001 VEGETATIVE WATERING MG     3,456.160 29.47097 5
168 6001 VEGETATIVE WATERING MG 49.000 1.00000 825.000 22.13091 3
169 2004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY     6,365.000 4.87431 2
169 6004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY     1,600.000 4.60000 1