| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | BOWIE |
| Highway |
US 67 |
| From |
ANDERSON CREEK |
| To |
ELLIOT CREEK |
| CSJ |
0010-12-064 |
| Proj ID |
STP 2008(655)HES |
| Work Type |
SAFETY TREAT FIXED OBJECTS, ETC. |
| |
|
24.058 |
989668.00 |
307018.78 |
450683.98 |
45.5 |
| Work Order |
07-14-08 |
| Work Began |
08-04-08 |
| Work Completed |
|
| Time Computed |
07-30-08 |
| Contract Working Days |
166 |
| Addl Days Granted |
0 |
| Working Days Charged |
46 |
| Percent Time Used |
27 |
| Contractor(s) |
| A R BROTHERS CONSTRUCTION SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0010-12-064 PANOLA SIGN & BARRICADE, INC.(1.22%) STATEWIDE GUARDRAIL SERVICE( 12.50%)
|
| Contract # |
06083007 |
|
Totals |
989668.00 |
307018.78 |
450683.98 |
45.5 |
|
| County | BOWIE |
| Highway |
US 67 |
| From |
AT INTERSECTION OF ROBISON ROAD |
| To |
. |
| CSJ |
0010-13-081 |
| Proj ID |
STP 2008(273)SB |
| Work Type |
IMPROVE TRAFFIC SIGNAL |
| |
|
0.300 |
378506.45 |
34615.00 |
374113.30 |
99.7 |
| Work Order |
02-25-08 |
| Work Began |
07-01-08 |
| Work Completed |
|
| Time Computed |
06-24-08 |
| Contract Working Days |
54 |
| Addl Days Granted |
0 |
| Working Days Charged |
61 |
| Percent Time Used |
112 |
| Contractor(s) |
| STRIPING TECHNOLOGY, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 0010-13-081 CARTHAGE DRILLING, INC.( 10.89%) USA BORING (4.89%) BANNER SIGN & BARRICADE, INC. (TYLER)(3.96%)
|
| Contract # |
01083014 |
|
Totals |
378506.45 |
34615.00 |
374113.30 |
99.7 |
|
| County | BOWIE |
| Highway |
FM 991 ETC |
| From |
US 67 |
| To |
1.8 MI S OF US 67 |
| CSJ |
0010-19-008 |
| Proj ID |
SFT 10-19-8 |
| Work Type |
SUBGRADE WIDENING & SURFACING |
| |
|
61.082 |
5963878.59 |
0.00 |
4105946.21 |
71.7 |
| Work Order |
02-07-06 |
| Work Began |
06-13-07 |
| Work Completed |
|
| Time Computed |
02-07-07 |
| Contract Working Days |
480 |
| Addl Days Granted |
0 |
| Working Days Charged |
266 |
| Percent Time Used |
55 |
| Contractor(s) |
| J-W PAYNE CONSTRUCTION COMPANY, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0010-19-008 TEXAS HIGHWAY MARKINGS, LLC(2.41%)
|
| Contract # |
01063220 |
|
Totals |
5963878.59 |
0.00 |
4105946.21 |
71.7 |
|
| County | BOWIE |
| Highway |
US 82 |
| From |
AT US 259 UNDERPASS |
| To |
. |
| CSJ |
0046-03-034 |
| Proj ID |
BR 2008(804) |
| Work Type |
REHABILITATE BRIDGE AND APPROACHES |
| |
|
0.214 |
1772382.20 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
208 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HODGES AND SON CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0046-03-034 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11083209 |
|
Totals |
1772382.20 |
0.00 |
0.00 |
0.0 |
|
| County | BOWIE |
| Highway |
US 82 ETC |
| From |
AT SH 98/FM 3378 IN NEW BOSTON |
| To |
. |
| CSJ |
0046-04-056 |
| Proj ID |
NH 2008(002) |
| Work Type |
INSTALL NEW TRAFFIC SIGNALS |
| |
|
1.200 |
769577.50 |
36388.27 |
794974.47 |
99.9 |
| Work Order |
10-10-07 |
| Work Began |
01-30-08 |
| Work Completed |
|
| Time Computed |
01-30-08 |
| Contract Working Days |
187 |
| Addl Days Granted |
2 |
| Working Days Charged |
181 |
| Percent Time Used |
95 |
| Contractor(s) |
| TEXAS TRAFFIC CONTROL SYSTEMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0046-04-056 C/T UNDERGROUND, LLC (2.86%) CARTHAGE DRILLING, INC.(0.40%) COWBELL TRAFFIC SERVICES, INC. (0.25%) LUCKETT CRANE SERVICE(0.08%)
|
| Contract # |
09073213 |
|
Totals |
769577.50 |
36388.27 |
794974.47 |
99.9 |
|
| County | BOWIE |
| Highway |
US 82 |
| From |
AT SH 8 UNDERPASS |
| To |
. |
| CSJ |
0046-05-036 |
| Proj ID |
BR 2007(574) |
| Work Type |
REPLACE BRIDGE & APPROACHES |
| |
|
0.001 |
2784908.34 |
51725.00 |
300292.19 |
10.7 |
| Work Order |
09-25-08 |
| Work Began |
10-13-08 |
| Work Completed |
|
| Time Computed |
10-11-08 |
| Contract Working Days |
161 |
| Addl Days Granted |
0 |
| Working Days Charged |
14 |
| Percent Time Used |
8 |
| Contractor(s) |
| J-W PAYNE CONSTRUCTION COMPANY, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0046-05-036 S & S BRIDGE PAINTING(0.21%) PRIMATE CONSTRUCTION, INC. (0.31%) BANNER SIGN & BARRICADE, INC. (HOOKS)(0.35%) R. K. HALL CONSTRUCTION, LTD.( 10.32%) STRIPING TECHNOLOGY, L.P.(2.17%) NE-TEX CONSTRUCTION, LTD.( 20.86%) SOUTHWEST ENVIRONMENT SERVICES, INC. (0.79%) ODUM SERVICES, L.P.(4.37%) LAWNS ETC., L.L.C. (3.63%) M & D FOUNDATION DRILLING INDUSTRIES, INC. (2.37%) STOMPER DEMOLITION (1.89%)
|
| Contract # |
12073016 |
|
Totals |
2784908.34 |
51725.00 |
300292.19 |
10.7 |
|
| County | BOWIE |
| Highway |
US 82 ETC |
| From |
SS 86 |
| To |
FM 1398 W |
| CSJ |
0046-05-045 |
| Proj ID |
STP 2009(127) |
| Work Type |
SEAL COAT |
| |
|
112.174 |
5891203.67 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
95 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| CLARK CONSTRUCTION OF TEXAS, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0046-05-045 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11083016 |
|
Totals |
5891203.67 |
0.00 |
0.00 |
0.0 |
|
| County | BOWIE |
| Highway |
SH 8 |
| From |
AT US 67 INTERSECTION |
| To |
. |
| CSJ |
0062-01-032 |
| Proj ID |
STP 2006(415) |
| Work Type |
GR, STR, BS, & SURF |
| |
|
0.146 |
954803.33 |
76299.95 |
751547.95 |
78.7 |
| Work Order |
03-18-08 |
| Work Began |
05-06-08 |
| Work Completed |
|
| Time Computed |
04-03-08 |
| Contract Working Days |
151 |
| Addl Days Granted |
0 |
| Working Days Charged |
98 |
| Percent Time Used |
64 |
| Contractor(s) |
| EAST TEXAS BRIDGE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0062-01-032 D. B. INDUSTRIES, INC. (0.13%) R. K. HALL CONSTRUCTION, LTD.( 45.57%) COWBELL TRAFFIC SERVICES, INC. (1.15%) ODUM SERVICES, L.P.(1.39%) SOUTHWEST ENVIRONMENT SERVICES, INC. (2.93%) STRIPING TECHNOLOGY, L.P.(5.23%) TEX OP CONSTRUCTION, LP(0.39%)
|
| Contract # |
01083235 |
|
Totals |
954803.33 |
76299.95 |
751547.95 |
78.7 |
|
| County | CASS |
| Highway |
US 59 |
| From |
0.3 MI N OF JIM'S BAYOU |
| To |
MARION C/L |
| CSJ |
0062-04-035 |
| Proj ID |
C 62-4-35 |
| Work Type |
GR, STRS & SURF |
| |
|
13.440 |
80437941.27 |
2323462.40 |
40775594.63 |
52.8 |
| Work Order |
07-19-06 |
| Work Began |
09-12-06 |
| Work Completed |
|
| Time Computed |
08-01-06 |
| Contract Working Days |
1,310 |
| Addl Days Granted |
0 |
| Working Days Charged |
595 |
| Percent Time Used |
45 |
| Contractor(s) |
| INTERSTATE HIGHWAY CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0062-04-035 UNITED RENTALS HIGHWAY TECHNOLOGIES (NEWELL RD-FTWORTH)(0.30%) T. J. LAMBRECHT CONSTRUCTION, INC. ( 19.27%) WS CONSTRUCTION CO.(3.62%) MIDWEST ASPHALT CORPORATION(0.85%) TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.32%) DUSTROL, INC. (ROANOKE)(0.11%) EAST TEXAS BRIDGE, INC.(1.51%) EAST TEXAS SIGN & SUPPLY, INC. (0.24%) JONA CONTRACTING, INC. (0.24%) STRIPING TECHNOLOGY, L.P.(1.22%) CAPROCK SPECIALITY CONTRACTORS (0.60%) INDUS CONSTRUCTION, L.P. (1.23%) R. K. HALL CONSTRUCTION, LTD.( 11.92%) CHOCTAW WATER WELLS(0.05%) HOUSTON SAWING & DRILLING(0.00%) TEXAS SHAFTS, INC. (0.16%) LONE STAR EQUIPMENT CO. INC. (INACTIVE--SEE 12687) (2.08%) COLUMBIA ENVIRONMENTAL SERVICES, INC.(0.57%) LIL DAN TRUCKING ( 17.49%) APARICIO & APARICIO(1.40%)
|
| Contract # |
06063202 |
|
Totals |
80437941.27 |
2323462.40 |
40775594.63 |
52.8 |
|
| County | CAMP |
| Highway |
SH 11 ETC |
| From |
AT INTERSECTION OF FM 1399 |
| To |
. |
| CSJ |
0083-07-035 |
| Proj ID |
SFT 83-7-35 |
| Work Type |
INSTALL LEFT TURN LANE |
| |
|
2.559 |
2919371.37 |
156087.82 |
3507396.77 |
99.9 |
| Work Order |
08-08-06 |
| Work Began |
08-23-06 |
| Work Completed |
|
| Time Computed |
08-24-06 |
| Contract Working Days |
272 |
| Addl Days Granted |
10 |
| Working Days Charged |
252 |
| Percent Time Used |
89 |
| Contractor(s) |
| LONGVIEW BRIDGE AND ROAD, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0083-07-035 PANOLA LIGHT & SIGN(0.82%) ODUM SERVICES, L.P.(2.00%) DUSTROL, INC. (ROANOKE)(0.27%) D. B. INDUSTRIES, INC. (0.39%) SOUTHWEST ENVIRONMENT SERVICES, INC. (0.15%) EAST TEXAS SIGN & SUPPLY, INC. (0.19%) STRIPING TECHNOLOGY, L.P.(4.98%)
|
| Contract # |
07063050 |
|
Totals |
2919371.37 |
156087.82 |
3507396.77 |
99.9 |
|
| County | CAMP |
| Highway |
SH 11 ETC |
| From |
FM 1521 |
| To |
0.1 MI W OF FM 1520 |
| CSJ |
0083-07-037 |
| Proj ID |
STP 2008(327) |
| Work Type |
SEAL COAT |
| |
|
63.821 |
1655437.63 |
144101.28 |
1424327.27 |
86.0 |
| Work Order |
02-13-08 |
| Work Began |
06-28-08 |
| Work Completed |
|
| Time Computed |
02-29-08 |
| Contract Working Days |
130 |
| Addl Days Granted |
0 |
| Working Days Charged |
60 |
| Percent Time Used |
46 |
| Contractor(s) |
| CLARK CONSTRUCTION OF TEXAS, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0083-07-037 INTERSTATE BARRICADES & MARKINGS, INC. ( 19.86%)
|
| Contract # |
01083021 |
|
Totals |
1655437.63 |
144101.28 |
1424327.27 |
86.0 |
|
| County | CAMP |
| Highway |
SH 11 |
| From |
AT KCS RAILWAY OVERPASS |
| To |
. |
| CSJ |
0083-08-043 |
| Proj ID |
BR 2006(788) |
| Work Type |
WIDEN BRIDGE AND APPROACHES |
| |
|
0.750 |
3366536.67 |
142019.95 |
1259076.84 |
37.3 |
| Work Order |
04-11-07 |
| Work Began |
05-07-07 |
| Work Completed |
|
| Time Computed |
04-27-07 |
| Contract Working Days |
275 |
| Addl Days Granted |
0 |
| Working Days Charged |
167 |
| Percent Time Used |
60 |
| Contractor(s) |
| EAST TEXAS BRIDGE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0083-08-043 D. B. INDUSTRIES, INC. (0.38%) EAST TEXAS SIGN & SUPPLY, INC. (0.12%) JAVELINA CONSTRUCTION SOUTH, INC.(0.17%) WEBBER-BALKE FOUNDATION COMPANY, INC.(2.66%) CARTHAGE DRILLING, INC.(2.41%) R.K. HALL CONSTRUCTION,(APAC -SULPHER SPRINGS) ( 14.98%) STRIPING TECHNOLOGY, L.P.(0.65%) STATEWIDE GUARDRAIL SERVICE(1.50%) L.S. EQUIPMENT CO., INC. (0.66%) PANOLA LIGHT & SIGN(0.50%) SOUTHWEST ENVIRONMENT SERVICES, INC. (0.16%)
|
| Contract # |
02073009 |
|
Totals |
3366536.67 |
142019.95 |
1259076.84 |
37.3 |
|
| County | CASS |
| Highway |
FM 248 |
| From |
SH 43 |
| To |
MARION COUNTY LINE |
| CSJ |
0138-10-026 |
| Proj ID |
STP 2008(805)HES |
| Work Type |
SUBGRADE WIDENING AND SURFACING |
| |
|
41.344 |
3535272.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-16-08 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
11-01-08 |
| Contract Working Days |
140 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| KNIFE RIVER CORPORATION - SOUTH |
SUBCONTRACTOR(S) FOR CCSJ: 0138-10-026 BANNER SIGN & BARRICADE, INC. (HOOKS)(0.39%)
|
| Contract # |
09083004 |
|
Totals |
3535272.00 |
0.00 |
0.00 |
0.0 |
|
| County | CASS |
| Highway |
US 59 ETC |
| From |
BOWIE C/L |
| To |
0.2 MI N OF SL 236 |
| CSJ |
0218-03-080 |
| Proj ID |
NH 2008(064) |
| Work Type |
SEAL COAT |
| |
|
160.108 |
6212837.52 |
458304.14 |
4764787.71 |
76.6 |
| Work Order |
11-08-07 |
| Work Began |
06-16-08 |
| Work Completed |
|
| Time Computed |
06-02-08 |
| Contract Working Days |
130 |
| Addl Days Granted |
0 |
| Working Days Charged |
89 |
| Percent Time Used |
68 |
| Contractor(s) |
| J-W PAYNE CONSTRUCTION COMPANY, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0218-03-080 STRIPING TECHNOLOGY, L.P.( 19.10%)
|
| Contract # |
10073205 |
|
Totals |
6212837.52 |
458304.14 |
4764787.71 |
76.6 |
|
| County | CASS |
| Highway |
SH 49 ETC |
| From |
MARION COUNTY LINE |
| To |
SH 155 |
| CSJ |
0222-04-051 |
| Proj ID |
STP 2007(171)SB |
| Work Type |
SAFETY TREAT FIXED OBJECTS, ETC. |
| |
|
62.756 |
3983115.90 |
263547.99 |
3538500.94 |
88.8 |
| Work Order |
02-16-07 |
| Work Began |
03-05-07 |
| Work Completed |
|
| Time Computed |
03-04-07 |
| Contract Working Days |
465 |
| Addl Days Granted |
0 |
| Working Days Charged |
359 |
| Percent Time Used |
77 |
| Contractor(s) |
| LONGVIEW BRIDGE AND ROAD, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0222-04-051 PANOLA LIGHT & SIGN(0.79%) D. B. INDUSTRIES, INC. (4.69%) EAST TEXAS SIGN & SUPPLY, INC. (4.09%) SOUTHWEST ENVIRONMENT SERVICES, INC. (0.58%) ODUM SERVICES, L.P.(7.71%)
|
| Contract # |
01073228 |
|
Totals |
3983115.90 |
263547.99 |
3538500.94 |
88.8 |
|
| County | PANOLA |
| Highway |
US 79 |
| From |
AT IRONS BAYOU |
| To |
. |
| CSJ |
0246-02-043 |
| Proj ID |
BR 2008(274) |
| Work Type |
REHABILITATE BRIDGE AND APPROACHES |
| |
|
0.183 |
972548.30 |
245280.91 |
974385.12 |
99.9 |
| Work Order |
03-07-08 |
| Work Began |
03-25-08 |
| Work Completed |
|
| Time Computed |
03-23-08 |
| Contract Working Days |
103 |
| Addl Days Granted |
13 |
| Working Days Charged |
117 |
| Percent Time Used |
100 |
| Contractor(s) |
| LONGVIEW BRIDGE AND ROAD, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0246-02-043 SOUTHWEST ENVIRONMENT SERVICES, INC. (0.40%) D. B. INDUSTRIES, INC. (0.72%) ODUM SERVICES, L.P.(5.09%) COWBELL TRAFFIC SERVICES, INC. (0.46%) STRIPING TECHNOLOGY, L.P.( 11.23%)
|
| Contract # |
01083039 |
|
Totals |
972548.30 |
245280.91 |
974385.12 |
99.9 |
|
| County | CAMP |
| Highway |
US 271 |
| From |
LP 179 IN PITTSBURG |
| To |
TITUS COUNTY LINE (BIG CYPRESS CREE |
| CSJ |
0248-02-053 |
| Proj ID |
SFT 248-2-53 |
| Work Type |
GR, STR, BASE, SURF, PAV MK & SIGN |
| |
|
4.235 |
14554144.65 |
32735.14 |
10709392.32 |
76.6 |
| Work Order |
06-08-06 |
| Work Began |
07-10-06 |
| Work Completed |
|
| Time Computed |
06-24-06 |
| Contract Working Days |
387 |
| Addl Days Granted |
51 |
| Working Days Charged |
351 |
| Percent Time Used |
80 |
| Contractor(s) |
| LONGVIEW BRIDGE AND ROAD, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0248-02-053 STRIPING TECHNOLOGY, L.P.(2.01%) PANOLA LIGHT & SIGN(0.66%) TEXAS SHAFTS, INC. (0.69%) ODUM SERVICES, L.P.(1.23%) D. B. INDUSTRIES, INC. (0.29%) SOUTHWEST ENVIRONMENT SERVICES, INC. (0.70%) MIDWEST ASPHALT CORPORATION (GAINESVILLE)(1.32%)
|
| Contract # |
05063004 |
|
Totals |
14554144.65 |
32735.14 |
10709392.32 |
76.6 |
|
| County | CAMP |
| Highway |
US 271 ETC |
| From |
UPSHUR COUNTY LINE |
| To |
FM 3384 (N) |
| CSJ |
0248-03-021 |
| Proj ID |
STP 2007(238)SB |
| Work Type |
SAFETY TREAT FIXED OBJECTS, ETC. |
| |
|
48.500 |
2269669.40 |
33873.95 |
2218769.85 |
97.8 |
| Work Order |
04-09-07 |
| Work Began |
04-18-07 |
| Work Completed |
|
| Time Computed |
04-25-07 |
| Contract Working Days |
300 |
| Addl Days Granted |
5 |
| Working Days Charged |
308 |
| Percent Time Used |
100 |
| Contractor(s) |
| EAST TEXAS BRIDGE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0248-03-021 PANOLA LIGHT & SIGN(1.65%) D. B. INDUSTRIES, INC. (2.20%) SOUTHWEST ENVIRONMENT SERVICES, INC. (0.72%) STATEWIDE GUARDRAIL SERVICE(5.31%)
|
| Contract # |
02073021 |
|
Totals |
2269669.40 |
33873.95 |
2218769.85 |
97.8 |
|
| County | CAMP |
| Highway |
FM 3384 |
| From |
AT DARBY CREEK TRIBUTARY |
| To |
. |
| CSJ |
0248-08-007 |
| Proj ID |
BR 2008(370) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.405 |
1363513.15 |
75928.97 |
512126.70 |
37.5 |
| Work Order |
04-01-08 |
| Work Began |
05-07-08 |
| Work Completed |
|
| Time Computed |
04-17-08 |
| Contract Working Days |
448 |
| Addl Days Granted |
0 |
| Working Days Charged |
114 |
| Percent Time Used |
25 |
| Contractor(s) |
| LONGVIEW BRIDGE AND ROAD, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0248-08-007 SOUTHWEST ENVIRONMENT SERVICES, INC. (0.35%) D. B. INDUSTRIES, INC. (5.35%) PANOLA LIGHT & SIGN(1.11%) EAST TEXAS SIGN & SUPPLY, INC. (0.78%) STRIPING TECHNOLOGY, L.P.(0.64%) JONA CONTRACTING, INC. (7.26%)
|
| Contract # |
02083209 |
|
Totals |
1363513.15 |
75928.97 |
512126.70 |
37.5 |
|
| County | UPSHUR |
| Highway |
US 259 |
| From |
AT INTERSECTION OF SH 155 |
| To |
. |
| CSJ |
0392-02-071 |
| Proj ID |
SFT 392-2-71 |
| Work Type |
GRADING, STRUCTURES, BASE & SURFACING |
| |
|
1.016 |
10058859.83 |
181951.35 |
7943596.70 |
83.1 |
| Work Order |
09-13-06 |
| Work Began |
04-02-07 |
| Work Completed |
|
| Time Computed |
04-01-07 |
| Contract Working Days |
236 |
| Addl Days Granted |
81 |
| Working Days Charged |
203 |
| Percent Time Used |
64 |
| Contractor(s) |
| H. H. HOWARD & SONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0392-02-071 BANNER SIGN & BARRICADE, INC. (TYLER)(0.39%) D. B. INDUSTRIES, INC. (0.58%) HODGES AND SON CONSTRUCTION COMPANY, INC.( 24.45%) ODUM SERVICES, L.P.(1.22%) R. K. HALL CONSTRUCTION, LTD.( 32.57%) SOUTHWEST ENVIRONMENT SERVICES, INC. (0.45%) STRIPING TECHNOLOGY, L.P.(3.73%) MIDWEST ASPHALT CORPORATION (GAINESVILLE)(0.18%) TEXAS SHAFTS, INC. (0.98%)
|
| Contract # |
08063208 |
|
Totals |
10058859.83 |
181951.35 |
7943596.70 |
83.1 |
|