Item No Description Units November 30, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 6001 MOBILIZATION LS 1.000 750,000.00000 15.000 596,634.71333 15
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 5,000.00000 98.000 14,050.65980 15
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF     20.000 49.00000 1
506 6011 ROCK FILTER DAMS (REMOVE) LF     20.000 37.00000 1
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     624.000 37.00000 1
506 6024 CONSTRUCTION EXITS (REMOVE) SY     624.000 15.00000 1
506 6035 SANDBAGS FOR EROSION CONTROL EA     80.000 1.00000 1
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF     2,517.000 4.14009 3
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF     2,517.000 1.46242 3
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF     4,654.000 5.33416 4
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF     610.000 9.60000 1
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF     5,200.000 1.20177 4
508 6001 CONSTRUCTING DETOURS SY     22,799.000 74.37212 2
512 6005 PORT CTB (FUR & INST) (F - SHAPE) (TY 1) LF     18,200.000 60.00000 1
512 6013 PORT CTB (DES SOURCE) (SGL SLP) (TY 1) LF     240.000 36.00000 1
512 6025 PORT CTB (MOVE) (SGL SLP) (TY 1) LF     240.000 21.00000 1
512 6029 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF     11,400.000 5.60000 1
512 6037 PORT CTB (STKPL) (SGL SLP) (TY 1) LF     240.000 36.00000 1
512 6053 PORT CTB (REMOVE) (F - SHAPE) (TY 1) LF     18,200.000 5.25000 1
514 6009 PERM CTB (SGL SLOPE) (TY 1) (54 ) LF     5,975.000 75.00000 1
514 6011 PERM CTB (SGL SLOPE) (TY 3) (54 ) LF     240.000 260.00000 1
514 6032 PERM CTB (SGL SLOPE) (TY 1) (42) (HPC) (MOD LF     101.300 130.00000 1
528 6004 LANDSCAPE PAVERS SY     1,309.000 125.00000 1
529 6005 CONC CURB (MONO) (TY II) LF     1,443.000 2.00000 1
529 6007 CONC CURB & GUTTER (TY I) LF     835.000 13.00000 1
529 6008 CONC CURB & GUTTER (TY II) LF     14,313.000 13.10829 2
529 6012 CONC CURB (SLOTTED) LF     34.000 50.00000 1
529 6013 CONC CURB (SPECIAL) (TYPE II) LF     2,461.000 30.00000 1
529 6015 CONC CURB (TY C1) LF     302.000 35.00000 1
530 6002 INTERSECTIONS (ACP) SY     20,795.000 17.70240 3
530 6003 INTERSECTIONS (SURF TREAT) SY     566.000 27.50000 1
530 6004 DRIVEWAYS (CONC) SY     3,339.000 60.18119 2
530 6006 DRIVEWAYS (SURF TREAT) SY     1,196.000 11.08000 1
531 6001 CONC SIDEWALKS (4") SY     2,394.000 115.00000 1
531 6003 CONC SIDEWALKS (6") SY     2,092.000 51.73996 2
531 6004 CURB RAMPS (TY 1) EA     9.000 1,188.88889 2
531 6005 CURB RAMPS (TY 2) EA     5.000 1,300.00000 1
531 6008 CURB RAMPS (TY 5) EA     31.000 1,500.00000 1
531 6010 CURB RAMPS (TY 7) EA     2.000 1,700.00000 1
531 6013 CURB RAMPS (TY 10) EA     14.000 1,300.00000 1
531 6017 CURB RAMPS (TY 22) EA     2.000 1,900.00000 1
533 6001 RUMBLE STRIPS (SHOULDER) LF     84,434.000 .15000 1
533 6002 RUMBLE STRIPS (CENTERLINE) LF     1,264,264.000 .20079 6
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF     13,951.000 21.10956 5
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     36.000 2,155.44444 4
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA     8.000 1,200.00000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF     12,168.000 3.43109 5
542 6002 REMOVE TERMINAL ANCHOR SECTION EA     49.000 285.59184 4
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA     64.000 2,664.92188 5
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA     4.000 265.00000 1
545 6001 CRASH CUSH ATTEN (INSTL) EA     11.000 3,290.90909 2
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA     8.000 1,987.50000 2
545 6005 CRASH CUSH ATTEN (REMOVE) EA     11.000 1,100.00000 2