AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - AMARILLO DISTRICT

Last Update: Thursday, May 30, 2013
ITEMS 100 2001 TO 192 2026
Items Items Bid Code Range
0100 - 0192
0247 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0618 - 0690
0712 - 0738
1122 - 1124
2031 - 2035
3224 - 3268
5248 - 5909
6055 - 6834
8251 - 8652
100 2001 - 192 2026
Item No Description Units May 31, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     4.500 7,500.00000 1
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     6.000 666.00000 2
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     1.000 884.00000 1
100 2008 PREPARING ROW (TREE) (0" TO 6" DIA) EA     183.000 226.12279 3
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     97.000 396.27835 2
100 2011 PREPARING ROW (TREE) (24" TO 36" DIA.) EA     13.000 322.20462 2
104 2001 REMOVING CONC (PAV) SY     43.000 7.00000 1
104 2009 REMOVING CONC (RIPRAP) SY     1,576.000 10.18579 3
104 2011 REMOVING CONC (MEDIANS) SY     14.000 15.00000 1
104 2014 REMOVING CONC (FOUNDATIONS) CY     .700 1,000.00000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY     610.000 10.76393 2
104 2022 REMOVING CONC (CURB AND GUTTER) LF     226.000 5.00000 1
104 2028 REMOVING CONC (MISC) SY     3,292.000 21.68894 2
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     2,543.000 6.52812 2
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     398.000 13.77387 3
105 2013 REMOVING STAB BASE & ASPH PAV (9") SY     4,121.000 6.17548 2
105 2037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     1,475.000 20.00000 1
105 2046 REMOVING STAB BASE & ASPH PAV (0" - 10") SY     670.000 12.36000 1
110 2001 EXCAVATION (ROADWAY) CY     168,015.000 7.35754 6
110 2002 EXCAVATION (CHANNEL) CY     118.000 30.00000 1
110 2003 EXCAVATION (SPECIAL) CY     2,997.000 4.73000 1
112 2002 SUBGRADE WIDENING (DENS CONT) STA     1,460.650 267.58295 3
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     75,526.000 7.28640 4
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     1,694.000 30.48512 2
132 2007 EMBANKMENT (FINAL) (ORD COMP) (TY D) CY     2,345.000 6.78000 1
132 2008 EMBANKMENT (FINAL) (DENS CONT) (TY D) CY     13,594.000 7.21000 1
134 2001 BACKFILL (TY A) STA     1,958.400 105.13092 2
134 2004 BACKFILL (TY A OR B) STA     3,412.380 124.79930 6
150 2002 BLADING HR     234.000 111.01709 5
158 2002 SPEC EXCAV WORK (BACKHOE) HR     86.000 187.63256 2
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     7,805.000 1.50000 1
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY     4,769.000 5.00000 1
162 2002 BLOCK SODDING SY     4,769.000 5.00000 1
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     2,012.000 1.05000 1
164 2007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY     191.000 3.50000 1
164 2011 BROADCAST SEED (TEMP) (COOL) SY     2,012.000 1.05000 1
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     13,987.000 .32000 1
164 2027 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) SY     30,700.000 .35000 1
164 2034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC     30.780 620.30539 2
164 2036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC     440.210 662.74792 8
164 2044 DRILL SEEDING (TEMP) (COOL) AC     257.680 478.63129 5
164 2051 DRILL SEED (TEMP) (WARM OR COOL) SY     9.990 415.00000 1
164 2053 DRILL SEEDING (TEMP) (WARM OR COOL) AC     172.540 532.69665 2
168 2001 VEGETATIVE WATERING MG     46,156.496 14.17680 13
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     2,012.000 1.73000 1
169 2003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     14,804.000 3.22638 3
169 2006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY     300.000 2.75000 1
192 2013 MULCH SY     13,987.000 2.00000 1
192 2026 PLANT MATERIAL (65 GAL) (TREE) EA     1.000 600.00000 1