    Below is a list of required documents that may be needed for
design approval 
and/or
 for the C&M Agreement:- Overpass (new or modification):
- Exhibit A,30% or more PS&E.
 - Exhibit B, 100% Plans.
 - Railroad Scope of Work (RR SOW).
 - Design Conformance to Railroad Guidelines (DCRG) Report, if applicable.
 - Metes and bounds property descriptionor area map.
 - Boring logs,if applicable.
 - 5% theoretical cost estimate,if applicable.
 - Hydraulic analysis,if applicable.
 - Overhead checklist (CPKCprojects only).
 - Railroad Work Matrix,if applicable.
 
 - Underpass (new or modification):
- All items for overpass required documentation.
 - Typical Selection Report (TSR),if applicable.
 - Cooper E-80 loading calculations,if applicable.
 - Shoofly track design.
 
 - At grade crossing (new or modification):
- Exhibit A,30% or more PS&E / Railroad Scope of Work (RR SOW).
 - Metes and bounds property descriptionor area map.
 - Railroad Work Matrix,if applicable.
 
 - Traffic signal preemption:
- Exhibit A,30% or more PS&E.
 - Preemption Form (TxDOT Form 2304).
 - Traffic signal timing dataand phasing diagram.
 - Signed preemption request.
 
 - Culverts, drainage pipes, or conduits on or over railroad right of way:
- Exhibit A,30% or more PS&E.
 - Pipeline or wireline license request form.
 - Hydraulic analysis,if applicable.
 - Cooper E-80 loading calculations,if applicable.
 - Railroad Work Matrix,if applicable.
 
 - Jointusage (ditch, sidewalk, etc.) or longitudinal encroachments:
- Exhibit A,30% or more PS&E.
 - Hydraulic analysis,if applicable.
 - Railroad Work Matrix,if applicable.