Required Documents

Below is a list of required documents that may be needed for design approval
and/or
for the C&M Agreement:
  • Overpass (new or modification):
    • Exhibit A,
      30% or more PS&E
      .
    • Exhibit B, 100% Plans.
    • Railroad Scope of Work (RR SOW).
    • Design Conformance to Railroad Guidelines (DCRG) Report, if applicable.
    • Metes and bounds property description
      or area map
      .
    • Boring logs,
      if applicable
      .
    • 5% theoretical cost estimate,
      if applicable
      .
    • Hydraulic analysis,
      if applicable
      .
    • Overhead checklist (
      CPKC
      projects only).
    • Railroad Work Matrix,
      if applicable
      .
  • Underpass (new or modification):
    • All items for overpass required documentation.
    • Typical Selection Report (TSR),
      if applicable
      .
    • Cooper E-80 loading calculations,
      if applicable
      .
    • Shoofly track design.
  • At grade crossing (new or modification):
    • Exhibit A,
      30% or more PS&E / Railroad Scope of Work (RR SOW).
    • Metes and bounds property description
      or area map
      .
    • Railroad Work Matrix,
      if applicable
      .
  • Traffic signal preemption:
    • Exhibit A,
      30% or more PS&E
      .
    • Preemption Form (TxDOT Form 2304).
    • Traffic signal timing data
      and phasing diagram
      .
    • Signed preemption request.
  • Culverts, drainage pipes, or conduits on or over railroad right of way:
    • Exhibit A,
      30% or more PS&E.
    • Pipeline or wireline license request form.
    • Hydraulic analysis,
      if applicable.
    • Cooper E-80 loading calculations,
      if applicable.
    • Railroad Work Matrix,
      if applicable.
  • Joint
    usage (ditch, sidewalk, etc.) or longitudinal encroachments:
    • Exhibit A,
      30% or more PS&E.
    • Hydraulic analysis,
      if applicable.
    • Railroad Work Matrix,
      if applicable.