1.3 Manual Organization
The PS&E Manual is formatted to present TxDOT’s process in a logical and sequential order as shown in
.
Chapter | Chapter Name | Description |
1 | General Guidance | Gives an overview of TxDOT’s process to develop PS&E and the organization of the manual. |
2 | Pre-Assembly Activities | Discusses the tasks and activities performed in project development prior to the preparation of PS&E. |
3 | Plan Set Development | Describes the tasks and activities associated with developing a traditional PS&E plan set including plan sheets, standards, drafting guidelines, and engineer’s seal and signature requirements. |
4 | Specifications | Presents information on TxDOT’s specifications including types of specifications and provisions, new special specifications and special provisions, how to develop a specification list and development of general notes. |
5 | Engineer’s Estimate | Discusses the development of the engineer’s estimate including bid items, quantities, prices and input into TxDOTCONNECT (TxC). |
6 | PS&E Submission, Review and Processing | Discusses the process for PS&E review and submittal to Design Division (DES) as well as an overview of the addendum process. |
7 | Pre-letting Activities | Provides general descriptions of project financial authorization and clearances required. |
8 | Post-letting Guidelines | Discusses processes for providing overrun and underrun justification and details for local participation in projects. |
Appendix A | List of Links | Provides links to documents referenced in the PS&E Preparation Manual. |