Detail Letting Schedule for Jefferson County (FY 2021)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Jefferson County (FY 2021) |
CCSJ: 0028-06-083 |
|||
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0028-06-083 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT FM 364 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $204,773 |
Length: | 0.0 | Actual | $152,495 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0028-06-084 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT FM 364 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $44,136 |
Length: | 0.0 | Actual | $42,075 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0028-07-056 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT LANGHAM RD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $238,244 |
Length: | 0.2 | Actual | $179,642 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0028-07-057 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT LINDBERGH DR | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $253,994 |
Length: | 0.2 | Actual | $193,171 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | US 96 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0065-05-148 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT EAST CHANCE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $206,683 |
Length: | 0.2 | Actual | $149,949 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | US 96 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0065-05-149 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT RAIDER LN | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $279,045 |
Length: | 0.2 | Actual | $220,082 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | US 96 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0065-05-150 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT FM 421 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $203,778 |
Length: | 0.2 | Actual | $149,953 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0065-07-063 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT CHINN LN | Fund Cat: | 8 |
Limits To: | (FRONTAGE ROADS) | ESTIMATE: | $27,891 |
Length: | 0.2 | Actual | $17,749 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | SS 380 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0065-08-166 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT CALDER AVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $283,804 |
Length: | 0.2 | Actual | $225,716 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | SS 380 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0065-08-167 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT WASHINGTON BLVD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $225,016 |
Length: | 0.2 | Actual | $161,103 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0200-10-083 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT FOREST RD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $219,015 |
Length: | 0.2 | Actual | $171,032 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0200-16-021 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT FM 365 | Fund Cat: | 8 |
Limits To: | (FRONTAGE ROADS) | ESTIMATE: | $417,199 |
Length: | 0.2 | Actual | $320,228 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | US 190 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0213-08-091 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT FM 252 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $262,332 |
Length: | 0.2 | Actual | $198,491 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0305-07-068 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT MLK/FM 3247(W) | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $159,985 |
Length: | 0.1 | Actual | $120,514 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0305-07-069 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT FM 3247(E)/FM 736 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $159,985 |
Length: | 0.1 | Actual | $120,514 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0306-03-129 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT MAIN AVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $240,105 |
Length: | 0.2 | Actual | $214,332 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0306-03-130 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT ROSEDALE DR | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $230,082 |
Length: | 0.2 | Actual | $182,010 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0306-03-131 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT US 69 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $259,655 |
Length: | 0.2 | Actual | $200,522 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | SH 347 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0667-01-119 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT 75TH ST | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $202,793 |
Length: | 0.2 | Actual | $145,764 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | FM 366 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0667-02-113 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT NEDERLAND AVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $205,945 |
Length: | 0.2 | Actual | $152,127 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | FM 366 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0667-02-114 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT MERRIMAN ST | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $248,806 |
Length: | 0.2 | Actual | $190,063 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | FM 366 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0667-02-115 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT PARK ST | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $163,785 |
Length: | 0.2 | Actual | $122,808 |
District: | BEAUMONT | Let Date: | May 2021 |
Highway: | FM 365 | Let Status: | Actual |
Project ID: | STP 2021(526)HES | CSJ: | 0932-01-115 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT FM 366 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $282,297 |
Length: | 0.2 | Actual | $248,364 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0028-06-083 | ||
---|---|---|---|
Length: | 4 | ||
Estimate: | $5,019,350 | ||
Actual: | $3,878,702 | ||
CCSJ: 0028-07-058 |
|||
District: | BEAUMONT | Let Date: | Jan 2021 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2021(290)HES | CSJ: | 0028-07-058 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | S MAJOR DRIVE, EAST | Fund Cat: | 8 |
Limits To: | IH 10 | ESTIMATE: | $463,731 |
Length: | 3.3 | Actual | $405,482 |
District: | BEAUMONT | Let Date: | Jan 2021 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2021(290)HES | CSJ: | 0028-11-207 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | |
Limits From: | AT SH 62 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $104,096 |
Length: | 0.2 | Actual | $124,473 |
District: | BEAUMONT | Let Date: | Jan 2021 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | STP 2021(290)HES | CSJ: | 0200-11-108 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | |
Limits From: | AT LUCAS DRIVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $57,383 |
Length: | 0.2 | Actual | $46,875 |
District: | BEAUMONT | Let Date: | Jan 2021 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | STP 2021(290)HES | CSJ: | 0305-02-050 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | AT FM 2460 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $34,888 |
Length: | 0.2 | Actual | $34,411 |
District: | BEAUMONT | Let Date: | Jan 2021 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | STP 2021(290)HES | CSJ: | 0305-07-073 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | |
Limits From: | AT CHURCH ST | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $12,513 |
Length: | 0.2 | Actual | $9,914 |
District: | BEAUMONT | Let Date: | Jan 2021 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | STP 2021(290)HES | CSJ: | 0306-03-134 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | |
Limits From: | AT 9TH AVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $25,520 |
Length: | 0.2 | Actual | $20,210 |
District: | BEAUMONT | Let Date: | Jan 2021 |
Highway: | SH 347 | Let Status: | Actual |
Project ID: | STP 2021(290)HES | CSJ: | 0667-01-123 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | |
Limits From: | AT 46TH STREET | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $41,695 |
Length: | 0.2 | Actual | $40,600 |
District: | BEAUMONT | Let Date: | Jan 2021 |
Highway: | FM 364 | Let Status: | Actual |
Project ID: | STP 2021(290)HES | CSJ: | 0786-01-087 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | MANION DRIVE | Fund Cat: | 8 |
Limits To: | PHELAN BLVD | ESTIMATE: | $16,028 |
Length: | 0.6 | Actual | $16,978 |
District: | BEAUMONT | Let Date: | Jan 2021 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | STP 2021(290)HES | CSJ: | 1685-04-024 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT CR 622 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $48,354 |
Length: | 0.2 | Actual | $54,430 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0028-07-058 | ||
Length: | 5.3 | ||
Estimate: | $804,208 | ||
Actual: | $753,374 | ||
CCSJ: 0065-07-068 |
|||
District: | BEAUMONT | Let Date: | Aug 2021 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | F 2021(876) | CSJ: | 0065-07-068 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT CHINN. RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $1,163,978 |
Length: | 0.2 | Actual | $1,241,805 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0065-07-068 | ||
Length: | 0.2 | ||
Estimate: | $1,163,978 | ||
Actual: | $1,241,805 | ||
CCSJ: 0200-15-026 |
|||
District: | BEAUMONT | Let Date: | Aug 2021 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | F 2021(472) | CSJ: | 0200-15-026 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | SPURLOCK RD, SOUTH | Fund Cat: | 8 |
Limits To: | FM 365 | ESTIMATE: | $2,366,016 |
Length: | 2.6 | Actual | $1,500,559 |
District: | BEAUMONT | Let Date: | Aug 2021 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | C 200-15-21 | CSJ: | 0200-15-021 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | 0.8 MILES NORTH OF SPURLOCK RD., SOUTH | Fund Cat: | 1 |
Limits To: | FM 365 | ESTIMATE: | $2,027,836 |
Length: | 2.5 | Actual | $3,080,232 |
District: | BEAUMONT | Let Date: | Aug 2021 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | C 200-16-22 | CSJ: | 0200-16-022 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | FM 365, SOUTH | Fund Cat: | 1 |
Limits To: | 39TH ST | ESTIMATE: | $1,297,837 |
Length: | 3.5 | Actual | $1,495,472 |
District: | BEAUMONT | Let Date: | Aug 2021 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | F 2021(468) | CSJ: | 0200-16-026 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 365, SOUTH | Fund Cat: | 8 |
Limits To: | 0.33 MILES SOUTH OF LAKE ARTHUR DRIVE | ESTIMATE: | $1,477,455 |
Length: | 1.6 | Actual | $987,143 |
List Showing Order Proposal Request Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0200-15-026 | ||
Length: | 10.2 | ||
Estimate: | $7,169,144 | ||
Actual: | $7,063,406 | ||
CCSJ: 0307-01-149 |
|||
District: | BEAUMONT | Let Date: | Oct 2020 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | C 307-1-149 | CSJ: | 0307-01-149 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | US 69 | Fund Cat: | 1 |
Limits To: | TERMINAL RD. | ESTIMATE: | $3,045,594 |
Length: | 2.7 | Actual | $2,734,997 |
List Showing Order Proposal Request Bid List Bid Tabulations Award Status Back... | Totals for 0307-01-149 | ||
Length: | 2.7 | ||
Estimate: | $3,045,594 | ||
Actual: | $2,734,997 | ||
CCSJ: 0368-03-037 |
|||
District: | BEAUMONT | Let Date: | Apr 2021 |
Highway: | SH 124 | Let Status: | Actual |
Project ID: | STP 2021(467)HES | CSJ: | 0368-03-037 |
Description: | CONSTRUCT NEW ROADWAY LANES | Handling Code: | |
Limits From: | 0.6 MI E OF FM 364, WEST | Fund Cat: | 8 |
Limits To: | 0.289 MI E OF FM 364 | ESTIMATE: | $259,595 |
Length: | 0.3 | Actual | $220,436 |
District: | BEAUMONT | Let Date: | Apr 2021 |
Highway: | SH 124 | Let Status: | Actual |
Project ID: | STP 2021(467)HES | CSJ: | 0368-04-032 |
Description: | CONSTRUCT NEW ROADWAY LANES | Handling Code: | |
Limits From: | 0.5 MI W OF BROOKS RD, WEST | Fund Cat: | 8 |
Limits To: | 0.6 MI E OF FM 364 | ESTIMATE: | $167,104 |
Length: | 0.3 | Actual | $141,581 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0368-03-037 | ||
Length: | 0.6 | ||
Estimate: | $426,699 | ||
Actual: | $362,017 | ||
CCSJ: 0368-04-033 |
|||
District: | BEAUMONT | Let Date: | Mar 2021 |
Highway: | SH 124 | Let Status: | Actual |
Project ID: | BR 2021(375) | CSJ: | 0368-04-033 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | @ HILLEBRANDT BAYOU-STR #201240036804036 | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $2,417,380 |
Length: | 0.1 | Actual | $2,659,519 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0368-04-033 | ||
Length: | 0.1 | ||
Estimate: | $2,417,380 | ||
Actual: | $2,659,519 | ||
CCSJ: 0920-00-131 |
|||
District: | BEAUMONT | Let Date: | Feb 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2021(291) | CSJ: | 0920-00-131 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $2,368,838 |
Length: | 0.0 | Actual | $2,880,282 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 0920-00-131 | ||
Length: | 0 | ||
Estimate: | $2,368,838 | ||
Actual: | $2,880,282 | ||
CCSJ: 0920-00-132 |
|||
District: | BEAUMONT | Let Date: | Jan 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2021(292) | CSJ: | 0920-00-132 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,255,695 |
Length: | 0.0 | Actual | $1,085,378 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0920-00-132 | ||
Length: | 0 | ||
Estimate: | $1,255,695 | ||
Actual: | $1,085,378 | ||
CCSJ: 0920-00-134 |
|||
District: | BEAUMONT | Let Date: | Sep 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2021(017) | CSJ: | 0920-00-134 |
Description: | INSTALL/REPLACE SIGNS | Handling Code: | |
Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $647,598 |
Length: | 0.0 | Actual | $540,111 |
List Showing Order Proposal Request Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0920-00-134 | ||
Length: | 0 | ||
Estimate: | $647,598 | ||
Actual: | $540,111 | ||
CCSJ: 0920-00-135 |
|||
District: | BEAUMONT | Let Date: | Oct 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2021(087) | CSJ: | 0920-00-135 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | DISTRICTWIDE | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $873,090 |
Length: | 0.0 | Actual | $723,761 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0920-00-135 | ||
Length: | 0 | ||
Estimate: | $873,090 | ||
Actual: | $723,761 | ||
CCSJ: 0920-00-143 |
|||
District: | BEAUMONT | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(724) | CSJ: | 0920-00-143 |
Description: | ADVANCED TRAFFIC MANAGEMENT SYSTEM | Handling Code: | |
Limits From: | VARIOUS | Fund Cat: | 1 |
Limits To: | VARIOUS | ESTIMATE: | $1,457,327 |
Length: | 0.0 | Actual | $1,130,460 |
District: | BEAUMONT | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(724) | CSJ: | 0920-00-146 |
Description: | TRAFFIC SURVEILLANCE | Handling Code: | |
Limits From: | DISTRICTWIDE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $780,300 |
Length: | 0.0 | Actual | $522,170 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0920-00-143 | ||
Length: | 0 | ||
Estimate: | $2,237,627 | ||
Actual: | $1,652,630 | ||
CCSJ: 0920-00-145 |
|||
District: | BEAUMONT | Let Date: | Jun 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(642) | CSJ: | 0920-00-145 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | DISTRICTWIDE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $345,943 |
Length: | 0.0 | Actual | $475,985 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0920-00-145 | ||
Length: | 0 | ||
Estimate: | $345,943 | ||
Actual: | $475,985 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |